Project Description

Artech Realtors, the leading real-estate builder in Trivandrum presents Artech Life Spaces – a luxurious apartment project near Infosys campus, Trivandrum.

This is Artech Realtor’s 65th project and it is all set to redefine luxury as you know it. Life Spaces is envisioned as one of ‘Kerala’s ultimate leisure lifestyle’ destination and will offer 2, 2+ Study, 3 and 4 BKH apartments just 5 minutes away from Technopark.

In addition to the well-appointed apartments, Artech Life Spaces will have a game room equipped with the latest gadgets to take the excitement to a new level. There will be an indoor badminton court and a virtual golf course to ensure that you stay healthy and fit. An exclusive beauty salon and a jacuzzi will help you relax or go in for a total makeover when you are stressed out.

Situated on the bypass, just 5 minutes away from Technopark, Artech Life Spaces is just a 15-minute drive from the Trivandrum International Airport.

Artech Life Spaces will bring you a new dimension of leisure living.

QUICK
ENQUIRE

Take your first few steps towards finding the ultimate happiness of the Perfect Home.
  1. INDOOR BADMINTON COURT
  2. BANQUET HALL
  3. BEAUTY SALON
  4. AV ROOM
  5. LAUNDRY
  6. VIRTUAL GOLF
  7. GAMES ROOM
  8. MEETING ROOM
  9. BUSINESS CENTRE
  10. LIBRARY
  11. TUITION ROOM
  12. GUEST ROOMS
  13. GUEST SUITE
  14. CRECHE
  15. PLAY STATION
  16. SAUNA FOR GENTS AND LADIES
  17. JACUZZI FOR GENTS AND LADIES
  18. AIR-CONDITIONED UNISEX GYM
  19. SWIMMING POOL FOR ADULTS AND KIDS
  20. CHILDREN PLAY AREA
  21. ROOFTOP PARTY AREA
  22. FEATURE ARRIVAL COURT
  23. VERTICAL GREEN WALL
  24. SECURITY KIOSK
  25. TRELIS AT TOWER ENTRY
  26. SKATING RINK
  27. BUTTERFLY GARDEN
  28. PATHWAY/JOGGING TRACK
  29. YOGA COURT
  30. LAZY LAWNS
  31. LILY POND/REFLECTIVE POOL
  32. PODIUM MEETING PLAZA
  33. CHESS COURT
  34. SENIOR CITIZEN CORNER
  35. PRIVACY PLANTING
  36. INTERACTIVE COURT

Structure

  • Column footing complying with seismic 3 zone.
  • RCC frame structure with brickwork and or concrete block partitions. Concrete grade and Steel grade as per structural consultant’s advice.

 

Flooring, Tiling & Railings

  • Main entrance lobby, Lift lobby and Lift fascia (wall & floor) using composite marble / granite / vitrified tiles, as per the architect’s design.
  • Staircases using granite / vitrified tile flooring with hand railing using SS / MS / GI  with or without toughened glass as per architect’s design.
  • Car park Area: Grano flooring with grooves or exterior grade paving tiles.
  • Foyer / Living / Dining using 80cm X 80cm Premium Double charged vitrified tiles (Kajaria / Asian).
  • Kitchen: 60cm X 60cm premium double charged Vitrified tiles for the flooring (Kajaria / Asian / Somany).
  • All Bedrooms : 60cm X 60cm Premium Double Charged Vitrified tiles (Kajaria / Asian / Somany).
  • All Bed room Toilets : Designer ceramic tile concepts 30cm X 30cm for floor and 60cm X 30cm for walls up to ceiling height of 8’ 0.
  • Servants Toilet : Ceramic tile 30cm X 30cm for floor and 30cm X 45cm for walls upto 7’6″ height.
  • Utility Room : 30cm X 30cm for floor and 30cm X 45cm for (kitchen wall) walls at a height of 2’ above the counter if any (using any premium Indian brands).
  • Balconies / Open Terraces / Decks : Rustic / Antiskid / ceramic tiles 30cm X 30cm or (wood finished vitrified tiles) with SS / MS / GI  with or without toughened glass as per architect’s design upto 1.2m heights (using any premium Indian brands).  

 

Sanitary & Plumbing

  • Sanitary fittings: will be of KOHLER or ROCA.
  • All Sanitary wares shall be of white colour only.
  • Concealed cisterns (concealed flushing system) will be of GEBERIT from Switzerland or GROHE from Germany. Actuator plates shall be in CP Finish dual flushing system.
  • Faucets: for all the bed room toilets will be single lever concealed diverters CP finish, heavy body metal fittings of ROCA from Spain or GROHE from Germany or KOHLER. Provision for hot water connection shall be provided for overhead shower.
  • Wall mounted single lever faucet make ROCA from Spain or GROHE from Germany or KOHLER will be provided for the wash basins, Kitchen and utility area sink.
  • Plumbing: All water supply lines shall be in ISI marked CPVC pipes. Drainage lines and storm water drain pipes shall be in PVC, Cockroach traps make CHILLI shall be provided as gratings for all necessary locations, Health Faucet ROCA from Spain or GROHE  from Germany or KOHLER shall be provided near EWC in all the toilets.
  • Stainless Steel Sink multi bowl with drain board of make NIRALI / FRANKE shall be provided for the kitchen and stainless steel sink without drain board shall be provided for the utility areas.
  • Towel rods, towel ring, soap dish shall be provided inside the toilets.

 

Doors & Windows

  • Window shutters: Prefabricated colour anodised aluminum sliding shutters by (Hindalco). One pane of Insect screen also shall be provided in each window.
  • Door Frames: Main door frame and shutter shall be of seasoned teak wood. Outer and Inner face to be PU coated and finished as per the Architect’s design.
  • Door Shutters: All internal door frames shall be of seasoned hard wood with flush door shutters. All internal and external faces shall be melamine finish or Paint finish as per the Architects design.
  • Hardware: All hardware shall be in C.P Brass, tower bolts, doorstoppers, ball bearing hinges. Locks shall be mortise of DORSET / YALE make from USA or equivalent.
  • Entrance door shall have hardware such as, Magic Eye, Safety Chain, Door Stopper and a BIO Metric lock from HAFELE or YALE.

 

Electrical

  • Concealed copper wiring using FINOLEX / V-GUARD / HAVELLS make cables with modular plate switches, centralized cabling system for all electrical and communication requirements.
  • Wiring shall be done for lighting, 6 Amps, 16 Amps and AC points in the Apartment.
  • Switches: All switches shall be LEGRAND or SCHNEIDER.
  • Generator: Power backup will be provided for all common services and selected light and fan point in each living, bedrooms inside apartment and a refrigerator point, plus additional one 6 Amp plug point in the Kitchen, one light point in all the toilets, one 6 Amp plug point at Living for emergency charging of devices shall be provided (Air-conditioning and Geyser points and other 16 Amp points will not be considered for the power back up).
  • Light fixtures for the Common areas, external areas, apartment balconies and at entrance door of the individual apartments shall be provided.
  • All light fixtures shall be of PHILIPS / HAVELLS.
  • Adequate ELCB and MCB shall be provided in each apartments SIEMENS / HAVELLS.
  • Provision for the GEYSER points and fresh air fans shall be provided for all toilets.
  • Provision for telephone and Internet shall be provided in the living room and master bed room.
  • Provision for Cable TV / DTH shall be provided in the Living and Master Bed room.

 

Paint Finishes:

  • Premium emulsion paint shall be applied for the ceiling and interior walls of the apartments excluding Utility and Services.
  • Internal Walls: Acrylic / cement based Putty with Premium emulsion paint.
  • External Walls: Weather shield exterior grade emulsion / texture paint.

 

Elevator/s

  • Elevators: High Speed lift shall be provided as per the Govt. norms in each core with automatic doors & SS brush finish of KONE  / SCHINDLER or MITSUBISHI.
  • ARD (Automatic Rescue Device) shall be installed in the passenger lift as a premium feature.

 

Air Conditioning

  • Provision for Air-Conditioning in Living, Dining and all bed rooms.

 

Home Automation:

  • Multi level security systems for common areas and lobbies, Access control entry to the common entrance / foyers and gymnasium.
  • Light motion sensors for selected common areas.
  • Home security monitoring, gas leakage detectors, emergency panic intrusion alarm, visitor tracking.

 

Landscaping

  • Provision for sprinklers and a drip system shall be provided for necessary common area landscaping.
  • Interlock Pavers to be laid in driveways and walkways.
  • Hard and soft landscaping shall be provided as per the landscape consultant’s design.

Work status as on 09-03-2024, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – completed, Sump tank completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup, 1D,7B,7A,3B,4B,9B,1A,1B,1C completed, Staircase Handrail – Mainstair and firestair P3 to 1st level completed, Balcony handrail – 7B,3B,1A,1B 100% completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, Machine room electrical work completed (LT), fire fighting piping work up to 10th level completed, Centralised Gas piping – A,B,C,D flats main riser piping work 100% completed
  • External Finishes – Sliding Doors and Windows – 7B,3B completed, A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side completed External Painting – first coat 98% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Civil Works Ceiling Plastering – level 1 to 11 (A,B,C,D) and 1 to 13 (E & F) Completed, 13(C,D,E&F), 14(A&B), 7 to 13th A &B lobby plastering completed, 14 (C,D,E &F), 15( A,B,C,D,E&F), 16 (A,B,C,D,E,F) completed, Masonry – Block/brick – 3E, level 4 to 7 (E & F) Completed, level 8,9 (A,B,C,D,E &F),10A completed, 4D,10(B,C,D,E&F), 11(A&B) Completed, 5 (B, C,D),11 (C,D,E&F), 12, 13,( A,B,E&F), 13 (C&D), 7A,14,15 (A,B,E,F) on progress, Inside plastering – level 1 (A,B,C & D) & Level 3 to 6 (E & F) completed, 3C, 8 (A,B,C,D) & 7,8(E&F) completed, 3D, 9 (A,F),10A Completed, 2(C&D), 9E,10F,9 (B,C,D),10F,10C,11A,2B,4B,9E,10F,9(B,C,D),10C,11A,11F, stair case side wall plastering till 7th floor on progress
  • Internal Finishes Door frame fixtures – 66 Door frame fixtures completed, putty and painting work – 4E&F, 3E&F on progress

ARTECH LIFE SPACES (TOWER C)

  • Civil Works Ceiling Plastering – basement ceiling – 80% completed, level 1 90% completed, 2nd-17th level – 100% completed, Masonry/Block work – level 1 – 100% completed, 2nd – 17th level – 100% completed, Inside Plastering- level 1 – 90% completed, 2nd – 17th level 100% completed.
  • Internal Finishes Door frame fixtures – (126 flats) 85% completed, Main door fixing – level 3,4,5 completed, putty and painting works – level 2 to level 16 – 95% completed, Waterproofing (level 3 to 17) all toilets in bedrooms & balcony completed), Level 16 all toilets completed, terrace floor 85% completed, OHT – completed, wall tiling – Level 3 – level 7 – 80% completed, level 8,9,10 on progress, floor tiling – level 3 – level 7 – 80% completed , level 8,9,10 on progress, putty and painting – level 2 to level 16 – 95% completed
  • Electrical, Plumbing & Firefighting works Electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 12 (80% completed), fire fighting work @ level 3 to level 17 fittings and pipe installation completed, vertical lines up to level 17 completed
  • External Finishes Sliding doors and windows – level 3 – 70% completed, External plastering – completed, External painting – south side first coat painting completed, east side primer and putty – 50% completed, west side primer & putty work completed, light well damp proof completed

CLUB HOUSE

  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed, Door frame fixtures-100% completed
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works- 90% Completed, wall and floor risers – 95% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.Windows & sliding door-85% completed
  • Interior work – Interior ceiling work – 90% completed, wood work – 80% completed, furniture – 20% completed, painting (PU) – 25% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of MARCH 2024.

ARTECH LIFE SPACES (TOWER A)

  • Internal Finishes – Tiling – 2A,2B,2C,2D,16D toilets tile work to be completed, Staircase Handrail – Mainstair 1st to 6th floor 100% to be completed, Balcony handrail – 9B,4B,7A 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work inside flat work 11th to 17th floor 100% to be completed
  • External Finishes – Sliding Doors and Windows – 7A,4B,9B to be completed, Painting Works – common area painting – 30% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Civil Works – Ceiling Plastering – 17th, 18th (A,B,C,D) to be completed, block work – 7 (A,B,C,D), 13 (C,D), 15 (C,D,E,F), 16 & 17 to be completed, Inside plastering – level 2A,4B,12th,13th floor to be completed
  • Internal Finishes – Door frame fixtures – 36 more Door frame fixtures to be completed, putty and painting work – 5 (E,F),6 (E,F), 7 (E&F) , 8 A,B,C,D,E,F to be completed

CLUB HOUSE

  • Internal Finishes – Flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.Hand rail works-50% to be completed
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works -100% to be completed, wall and floor risers – 100% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 100% to be completed, wood work – 100% to be completed furniture – 70% to be completed, painting (PU) – 75% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 10-02-2024, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 98% completed, Retaining wall work (8m) 100% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed.
  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – completed, Sump tank completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup, 1D,7B,7A,3B,4B completed, Staircase Handrail – Mainstair and firestair P3 to 1st level completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, Machine room electrical work completed (LT), fire fighting piping work up to 9th level completed, Centralised Gas piping – 1st level internal 90% completed
  • External Finishes – Sliding Doors and Windows – 7B,3B completed, A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side completed External Painting – first coat 98% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Grade slab completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Podium slab 90% completed, Roof slab – Reflective pool wall up to base of reflective pool and sitting area in reflective pool completed, Level 1 to 18 – Type A, B, C & D flats completed, Level 5 to 11 & 13,14,15,16,17 Flat ( E & F) completed
  • Civil Works – Ceiling Plastering – level 1 to 11 (A,B,C,D) and 1 to 13 (E & F) Completed, 13(C,D,E&F), 14(A&B), 7 to 13th A &B lobby plastering completed, 14 C,D,E &F, 15 A,B,C,D,E&F, 16 A,B,C,D on progress, Masonry – Block/brick – 3E, level 4 to 7 (E & F) Completed, level 8,9 (A,B,C,D,E &F),10A completed, 4D,10(B,C,D,E&F), 11(A&B) Completed, 5B,11 C,D,E&F, 12, 13, A,B,E&F, 13 C&D on progress, Inside plastering – level 1 (A,B,C & D) & Level 3 to 6 (E & F) completed, 3C, 8 (A,B,C,D) & 7,8(E&F) completed, 3D, 9 A,F,10A Completed, 2C&D, 9E,10F,9 B,C,D,10F,10C,11A on progress
  • Internal Finishes – Door frame fixtures – 44 Door frame fixtures completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 80% completed, 2nd-17th level – 100% completed, Masonry/Block work – level 1 – 95% completed, 2nd – 17th level – 100% completed, Inside Plastering- level 1 – 85% completed, 2nd – 17th level 100% completed.
  • Internal Finishes – Door frame fixtures – (126 flats) 85% completed, Main door fixing – level 3 completed, putty and painting works – level 2 to level 15 – 95% completed, Waterproofing (level 3 to 15) all toilets in bedrooms & balcony completed), Level 16 all toilets completed, terrace floor 85% completed, OHT – completed, wall tiling – Level 3 – 95% completed, level 4 – 95% completed, level 5 – 95% completed, level 6 – 70% completed, level 7 – 40% completed, floor tiling – level 3 – 95% completed, level 4 – 95% completed, level 5 – 95% completed, level 6 – 85% completed, level 7 – 60% completed
  • Electrical, Plumbing & Firefighting works – Electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 11 (80% completed), fire fighting work @ level 3 to level 15 fittings and pipe installation completed, vertical lines up to level 17 completed
  • External Finishes – External plastering – completed, External painting – south side first coat painting completed, east side primer and putty – 50% completed, west side primer & putty work completed, light well damp proof completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works- 90% Completed, wall and floor risers – 95% completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed, Door frame fixtures-100% completed
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 95% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.Windows & sliding door-85% completed
  • Interior work – Interior ceiling work – 80% completed, wood work – 80% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of FEBRUARY 2024.

ARTECH LIFE SPACES (TOWER A)

  • Internal Finishes – Tiling – 1A,1B, 1C, 2A, 7B, 2B,2C,2D,9B,16D toilets tile work to be completed, Staircase Handrail – Mainstair 1st to 6th floor 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – main riser duct piping work 9th to 17th level 100% to be completed, Centralised Gas piping – A,B,C,D flats main riser piping work 100% to be completed
  • External Finishes – Sliding Doors and Windows – 7A,4B to be completed, Painting Works – 100% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 18 flat (E&F) to be completed
  • Civil Works – Ceiling Plastering – 16E&F, 17th, 18th (A,B,C,D) to be completed, block work – 5 B,C,D, 7 A,B,C,D, 14,15 A,B,C,D,E&F to be completed, Inside plastering – 2A&B, 4(A,B,C,D) to be completed
  • Internal Finishes – Door frame fixtures – 28 more Door frame fixtures to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footing balance 9+5 to be completed, Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed.

CLUB HOUSE

  • Internal Finishes – Flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.Hand rail works-50% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% to be completed, wall and floor risers – 100% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 90% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 13-01-2024, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 98% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed.
  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed, Staircase Handrail – Mainstair P3 to 1st level completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, Machine room electrical work completed (LT), fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side completed External Painting – first coat 98% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Podium slab pool area except STP area – 90% pool deck completed, Roof slab – Reflective pool wall up to base of reflective pool and sitting area in reflective pool completed, Level 1 to 17 – Type A, B, C & D flats completed, Level 5 to 11 & 13,14,15,16,17 Flat ( E & F) completed
  • Civil Works – Ceiling Plastering – level 1 to 11 (A,B,C,D) and 1 to 13 (E & F) Completed, 13(C,D,E&F), 14(A&B), 7 to 13th A &B lobby plastering completed, Masonry – Block/brick – 3E, level 4 to 7 (E & F) Completed, level 8,9 (A,B,C,D,E &F),10A completed, 4D,10(B,C,D,E&F), 11(A&B) Completed, Inside plastering – level 1 (A,B,C & D) & Level 3 to 6 (E & F) completed, 3C, 8 (A,B,C,D) & 7,8(E&F) completed, 3D, 9 A,F,10A Completed
  • Internal Finishes – Door frame fixtures – 26 Door frame fixtures completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 80% completed, 2nd-17th level – 100% completed, Masonry/Block work – level 1 – 90% completed, 2nd – 17th level – 100% completed, Inside Plastering- level 1 – 75% completed, 2nd – 17th level 100% completed.
  • Internal Finishes – Door frame fixtures – (110 flats) 75% completed, Main door fixing – level 3 completed, putty and painting works – level 2 to level 15 – 95% completed, Waterproofing (level 3 to 15) all toilets in bedrooms & balcony completed), Level 16 all toilets completed, terrace floor 85% completed, OHT – completed, wall tiling – Level 3 – 95% completed, level 4 – 80% completed, level 5 – 95% completed, level 6 – 70% completed, level 7 – 40% completed, floor tiling – level 3 – 95% completed, level 4 – 95% completed, level 5 – 95% completed, level 6 – 85% completed, level 7 – 60% completed
  • Electrical, Plumbing & Firefighting works – Electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 11 (80% completed), fire fighting work @ level 3 to level 15 fittings and pipe installation completed, vertical lines up to level 17 completed
  • External Finishes – External plastering – completed, External painting – south side first coat painting completed, east side primer and putty – 50% completed, west side primer & putty work completed, light well damp proof completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed, Door frame fixtures-100% completed
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works- 90% Completed, wall and floor risers – 95% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.Windows & sliding door-50% completed
  • Interior work – Interior ceiling work – 80% completed, wood work – 80% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JANUARY 2024.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Retaining wall work (8m) 100% to be completed
  • Internal Finishes – Painting Works – balcony inside putty, primer work 100% to be completed, Tiling – 1A,1B, 1C, 2A, 7B to be completed, Staircase Handrail – Fire stair handrail P3 to level 1 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – main riser duct piping work 9th to 17th level 100% to be completed
  • External Finishes – Painting Works – 100% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, Level 18 flats (A,B,C &D) to be completed, level 18 flat (E&F) to be completed
  • Civil Works – Ceiling Plastering – 14th level (C,D,E &F), 15th (A,B,C,D,E &F) plastering to be completed, block work – 5,7 (A,B,C,D), 11 (C,D,E&F), 12,13 (A,B,C,D,E&F) to be completed, Inside plastering – Level 9E,10F,9B,C,D,10F to be completed
  • Internal Finishes – Door frame fixtures – 18 more Door frame fixtures to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footing balance 9+5 to be completed, Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed.

CLUB HOUSE

  • Internal Finishes – Flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.Hand rail works-50% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% to be completed, wall and floor risers – 100% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 90% to be completed
  • Yard Work -External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 08-12-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 98% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed.
  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed, Staircase Handrail – Mainstair P3 to 1st level completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, Machine room electrical work completed(LT), fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side completed External Painting – 90% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Podium slab pool area except STP area – 90% pool deck completed, Roof slab – Reflective pool wall up to base of reflective pool and sitting area in reflective pool completion, Level 1 to 15 – Type A, B, C & D flats completed, Level 5 to 11 & 13,14,15 Flat ( E & F) completed, Level 16 – A,B,C,D completed
  • Civil Works – Ceiling Plastering – level 1 to 11 (A,B,C,D) and 1 to 13 (E & F) Completed 7 to 13th A &B lobby plastering completed, Masonry – Block/brick – 3E, level 4 to 7 (E & F) Completed, level 8,9 (A,B,C,D,E &F),10A completed, Inside plastering – level 1 (A,B,C & D) & Level 3 to 6 (E & F) completed, 3C, 8 (A,B,C,D) & 7,8(E&F) completed
  • Internal Finishes – Door frame fixtures – 26 Door frame fixtures completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 50% completed, 2nd-17th level – 100% completed, level 16 – 90% completed, Masonry/Block work – level 1 – 80% completed, 2nd – 17th level – 100% completed, Inside Plastering- level 1 – 45% completed, 2nd – 17th level 100% completed.
  • Internal Finishes – Door frame fixtures – (110 flats) 75% completed, Main door fixing – level 3 completed, putty and painting works – level 2 to level 14 – 95% completed, Waterproofing (level 3 to 15) all toilets in bedrooms & balcony completed), terrace floor 85% completed, OHT – 20% completed, wall tiling – Level 3 – 95% completed, level 4 – 80% completed, level 5 – 95% completed, level 6 – 50% completed, floor tiling – level 3 – 95% completed, level 4 – 95% completed, level 5 – 95% completed, level 6 – 50% completed
  • Electrical, Plumbing & Firefighting works – Electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 10 (80% completed), fire fighting work @ level 3 to level 12 fittings and pipe installation completed, vertical lines up to level 12 completed
  • External Finishes – External plastering – completed, External painting – south side, west side primer & putty work completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed, Door frame fixtures-100% completed
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.Windows & sliding door-50% completed
  • Interior work – Interior ceiling work – 70% completed, wood work – 70% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2023.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Retaining wall work (8m) 100% to be completed
  • Internal Finishes – Painting Works – balcony inside putty, primer work 100% to be completed, Tiling – 1A,1B, 1C, 2A, 7B to be completed, Staircase Handrail – Fire stair handrail P3 to level 1 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – main riser duct piping work 9th to 17th level 100% to be completed
  • External Finishes – Painting Works – 100% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, Level 17,18 flats (A,B,C &D) to be completed, level 16,17 & 18 flat (E&F) to be completed
  • Civil Works Ceiling Plastering – 13th level (C,D,E &F), 14th (A,B,C,D,E &F) plastering to be completed, block work – 4D, 5,7 (A,B,C,D), 10 (B,C,D,E&F), 11,12 (A,B,C,D,E&F) to be completed, Inside plastering – Level 3D, 9,10 (A,B,C,D,E & F) to be completed
  • Internal Finishes – Door frame fixtures – 18 more Door frame fixtures to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footing balance 9+5 to be completed, Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed.
  • External Finishes – External plastering – passage light well area plastering to be completed, External painting – east side damp proof coating to be completed

CLUB HOUSE

  • Internal Finishes – Flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.Hand rail works-50% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% to be completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 80% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 10-11-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 98% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed.
  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – 50% completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed, Staircase Handrail – Mainstair P3 to 1st level completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, fire fighting piping work up to 9th level completed.Machine room electrical work completed(LT)
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side – 95% completed External Painting – 70% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Podium slab pool area except STP area – 90% pool deck completed, Roof slab – Reflective pool wall up to base of reflective pool and sitting area in reflective pool completion, Level 1 to 15 – Type A, B, C & D flats completed, Level 5 to 11 Flat ( E & F) completed, Level 16 – A & B completed
  • Civil Works – Ceiling Plastering – level 1 to 11 (A,B,C,D) and 1 to 9 (E & F) Completed 7 to 11 lobby completed, Masonry – Block/brick – 3E, level 4 to 7 (E & F) Completed, level 8 (A,B,C,D,E &F) completed, Inside plastering – level 1 (A,B,C & D) & Level 3 to 6 (E & F) completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 45% completed, 2nd-17th level – 100% completed, level 16 – 90% completed, Masonary/Block work – level 1 – 80% completed, 2nd – 17th level – 100% completed, Inside Plastering- level 1 – 25% completed, 2nd – 17th level 100% completed.
  • Internal Finishes – Door frame fixtures – (110 flats) 75% completed, putty and painting works – level 2 to level 14 – 95% completed, Waterproofing (level 3 to 15) all toilets in bedrooms & balcony completed), terrace floor 85% completed, wall tiling – Level 3 – 95% completed, level 4 – 80% completed, level 5 – 65% completed, floor tiling – level 3 – 95% completed, level 4 – 80% completed, level 5 – 65% completed
  • Electrical, Plumbing & Firefighting works – Electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 9 (80% completed), fire fighting work @ level 3 to level 12 fittings and pipe installation completed, vertical lines up to level 12 completed
  • External Finishes – External plastering – completed, External painting – south side, west side primer & putty work completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed,Door frame fixtures-100% completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes External Plastering – 100% Completed, External Painting-75% Completed. Windows & sliding door-50% completed
  • Interior work – Interior ceiling work – 70% completed, wood work – 70% completed
  • Yard Work -External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2023.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Sump tank of Tower A up to cover slab level wall casting to be completed
  • Civil Works – Flat BC rear side 100% plastering to be completed.
  • Internal Finishes – Waterproofing – Terrace level – 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed, Tiling – 1A,1B & 1C 2A to be completed, Staircase Handrail – Fire stair handrail P3 to level 1 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed,Rectification work 1st to 9th floor 100% to be completed.

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 16 (C & D), level 17 flat (A&B) to be completed, Level 13 to 15 flat (E and F) to be completed, Reflective pool base and wall to be completed
  • Civil Works – Ceiling Plastering – level 10 to 13 (E & F) to be completed, Level 12th,13th (A,B,C, &D) lobby plastering to be completed, block work level 9 to 11 (A,B,C,D,E & F) to be completed, Inside plastering – Level 3C & 3D, to be completed, level 8,9 (A,B,C & D) & level 7 to 9 (E &F) to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footing balance 9+5 to be completed.Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed.

CLUB HOUSE

  • Internal Finishes – Flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.Hand rail works-50% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 80% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 10-10-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 98% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed.
  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – 50% completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, fire fighting piping work up to 9th level completed.Machine room electrical work completed(LT).
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side – 95% completed External Painting – 70% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed,Podium slab pool area except STP area – 90% pool deck completed,Roof slab-Reflective pool wall up to base of reflective pool and sitting area in reflective pool completion Podium slab pool area over STP area completed, Level 1 to 14 – Type A, B, C & D flats completed, Level 5,6,7,8,9,10 Flat E & F completed, Level 15 – A & B completed ,Level-9,10 Flat E&F completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7,8,9,10,11 (A,B,C,D) and 1,2,3,4,5,6,7,8 (E & F) Completed 7,8,9 lobby completed, Masonry – Block/brick – level 2,3,6 (A,B,C,D),2E&F,3F completed, Level 4,5,6 E&F on progress ,Level 1 A,B.C,D completed level 4 D, 7 A&B on progress, Inside plastering – 3A & 3B on progress,Wall plastering 1,2 E&F completed,1A plastering on progress

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-16th level – 100% completed, level 16 – 90% completed, Masonary/Block work – level 1 – 80% completed, 2nd – 17th level-100% completed, Inside Plastering- level 1 – 25% completed, 2nd – 16th level 100% completed.
  • Internal Finishes – Door frame fixtures – (110 flats) 75% completed, putty and painting works – level 2 to level 14- 95% completed, level 13-75% completed, Waterproofing (level 3,4,5,6,7,8,9,10,11,12,13,14) all toilets in bedrooms & balcony completed), terrace floor 85% completed, stair room slab and LMR slab completed, wall tiling-3H,3B completed, floor tiling – mockup completed,3B on going
  • Electrical, Plumbing & Firefighting works – Electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 9 (80% completed), fire fighting work @ level 3 to level 12 fittings and pipe installation completed, vertical lines up to level 10 completed
  • External Finishes – External plastering – south side completed, west side completed, East side completed, North side & light well area 50% completed, External painting – south side 2 coat damp proof and primer completed, west side – damp proof completed, primer & putty work on progress
  • Yard Work – External infrastructure &MEP services & connections

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed,Door frame fixtures-100% completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes External Plastering – 100% Completed, External Painting-75% Completed.Windows & sliding door-50% completed
  • Interior work – Interior ceiling work – 70% completed, wood work – 70% completed
  • Yard Work -External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2023.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Sump tank of Tower A up to cover slab level wall casting to be completed
  • Civil Works – Flat BC rear side 100% plastering to be completed.
  • Internal Finishes – Waterproofing – Terrace level – 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed, Tiling – 1A,1B & 1C 2A to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed,Rectification work 1st to 9th floor 100% to be completed.
  • External Finishes – External Plastering – Flat B & C rear side plastering 100% to be completed, Painting Works – 80% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 15 C,D,level 16 flat A&B to be completed, Level 11,12 & 13 flat E and F to be completed .Reflective pool base and wall to be completed .Roof slab on level11,12&13 to be completed. Balance swimming pool deck level wall&slab completetion except STP area to be completed.
  • Civil Works – Ceiling Plastering – level 12,13A,B,C,D E & F 10,11,12,13 th lobby plastering to be completed, block work for level 3E,4,5,6,7(E&F)8(A,B,C,D,E,F) (A,B,C,D) to be completed, Inside plastering -Level 3(A&B),level1(A,B,CD),level3,4,5( E&F) to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footing balance 9+5 to be completed.Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed.
  • Civil Works – Ceiling Plastering- level 17 – 100% to be completed, Masonry – block/brick – level 17th 100% to be completed

CLUB HOUSE

  • Internal Finishes – Flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.Hand rail works-50% to be completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 80% to be completed, wood work – 70% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 13-09-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 90% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed
  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – 30% completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side – 85% completed External Painting – 65% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed,Podium slab pool area except STP area – 90% pool deck completed, Podium slab pool area over STP area completed, Level 1 to 14 – Type A, B, C & D flats completed, Level 5,6,7,8,9,10 Flat E & F completed, Level 15 – A & B completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7,8,9,10,11 (A,B,C,D) and 1,2,3,4 (E & F) Completed, Masonry – Block/brick – level 2,3,6 (A,B,C,D) Completed, level 4 Flat A,B,C completed, Level 4D, 7 A&B on progress, Inside plastering – 3A & 3B on progress

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-15th level – 100% completed, level 16 – 90% completed, Masonary/Block work – level 1 80% completed, 2nd – 13th level-100% completed, level 14th to 16th – 100% completed, level 17 – 90% completed, Inside Plastering- level 1 – 25% completed, 2nd – 14th level 100% completed, Level 15 – 65% completed
  • Internal Finishes – Door frame fixtures – (110 flats) 75% completed, putty and painting works – level 2 (75% completed), level 3 to level 12 (100% completed), level 13 – 75% completed, Waterproofing – (level 3,4,5,6,7,8,9,10,11,12 all toilets in bedrooms & balcony completed), terrace floor 55% completed, stair room slab and LMR slab completed, wall tiling – mockup completed, floor tiling – mockup completed
  • Electrical, Plumbing & Firefighting works – electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 9 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed, vertical lines up to level 10 completed
  • External Finishes – External plastering – south side completed, west side completed, East side completed, North side & light well area 10% completed, External painting – south side 2 coat damp proof and primer completed, west side – damp proof completed, primer work on progress

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed.
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes External Plastering – 100% Completed, External Painting-75% Completed.
  • Interior work – Interior ceiling work – 50% completed, wood work – 50% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2023.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – sump tank of Tower A up to cover slab level wall casting to be completed
  • Internal Finishes – Waterproofing – Terrace level – 50% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed, Tiling – 1A,1B & 1C to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed, Electrical works lift machine room electrical work to be completed
  • External Finishes – External Plastering – Flat B & C rear side plastering 100% to be completed, Painting Works – 75% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 15 C,D to be completed, Level 11,12 & 13 flat E and F to be completed
  • Civil Works – Ceiling Plastering – level 5,6,7,8 & 9 (E & F) to be completed, block work for level 2,3,4 (E&F), 1 (A,B,C,D) to be completed, 5,6,7 (E &F) to be completed, Inside plastering – 3 (A,B,C & D) to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed
  • Civil Works Ceiling Plastering- level 17 – 100% to be completed, Masonry – block/brick – level 17th 100% to be completed

CLUB HOUSE

  • Internal Finishes – flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 70% to be completed, wood work – 70% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 12-08-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 70% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed
  • Internal Finishes – Waterproofing- up to 17th level completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed except Bed 1 Toilet
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, External Painting – 60% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed,Stilt 1 – roof slab 90% completed,Podium slab pool area except STP area – 90% pool deck completed, Podium slab pool area over STP area completed, Level 1 to 14 – Type A, B, C & D flats completed, Level 5,6,7,8 Flat E & F completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7,8 (A,B,C,D) and 1 (E & F) Completed, Masonry – Block/brick – level 2,3,6 (A,B,C,D) Completed, level 4 Flat A,B,C completed, Level 4D, 7 A&B on progress

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-15th level – 100% completed, level 16 – 90% completed, Masonary/Block work – level 1 80% completed, 2nd – 13th level-100% completed, level 14th to 16th – 100% completed, level 17 – 65% completed, Inside Plastering- level 1 – 25% completed, 2nd – 12th level 100%, level 13 – 100% completed, level 14 – 45% completed
  • Internal Finishes – Door frame fixtures – (106 flats) 70% completed, putty and painting works – level 2 (75% completed), level 3 to level 10 (100% completed), level 11 – 100% completed, level 12 – 100% completed, Water proofing – (level 3,4,5,6,7,8,9,10,11,12 all toilets in bedrooms & balcony completed) 95% completed, terrace floor 55% completed, stair room slab and LMR slab completed, wall tiling – mockup completed, floor tiling – mockup completed
  • Electrical, Plumbing & Firefighting works – electrical works – level 2 to level 15 – 98% completed, concealed plumbing works – level 3 – level 9 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed, vertical lines up to level 10 completed
  • Internal Finishes – Door frame fixtures – (106 flats) 70% completed, putty and painting works – level 2 (75% completed), level 3 to level 10 (100% completed), level 11 – 100% completed, level 12 – 100% completed, Water proofing – (level 3,4,5,6,7,8,9,10,11,12 all toilets in bedrooms & balcony completed) 95% completed, terrace floor 55% completed, stair room slab and LMR slab completed, wall tiling – mockup completed, floor tiling – mockup completed
  • Electrical, Plumbing & Firefighting works – electrical works – level 2 to level 15 – 98% completed, concealed plumbing works – level 3 – level 9 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed, vertical lines up to level 10 completed
  • External Finishes – External plastering – south side completed, west side completed, East side up to level 8 completed, External painting – south side 2 coat damp proof and primer completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed.
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes External Plastering – 100% Completed, External Painting-75% Completed.
  • Interior work – Interior ceiling work – 50% completed, wood work – 25% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of AUGUST 2023.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Retaining wall 15 mtr, sump tank of Tower A up to coverslab level wall casting to be completed
  • Internal Finishes – Waterproofing – 17th level 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed, Electrical works – Passenger lift and lift machine room electrical work to be completed
  • External Finishes – External Plastering – Flat B & C rear side plastering 100% to be completed, Painting Works – 70% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 15 A,B,C,D to be completed, Level 9,10 & 11 flat E and F to be completed
  • Civil Works – Ceiling Plastering – level 2 & 3 E & F and 9 A,B,C,D to be completed, block work for level 4,5 & 7 A,B,C,D to be completed, 2E to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed
  • Civil Works Ceiling Plastering- level 16 – 100% to be completed,Masonry – block/brick – level 17th 100% to be completed

CLUB HOUSE

  • Internal Finishes – flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 70% to be completed, wood work – 40% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 12-07-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Treated water tank of Tank A & B completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed, Passenger lift 2Nos: completed
  • Internal Finishes – Waterproofing- up to 16th level completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed except Bed 1 Toilet
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, External Painting – 55% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Roof slab podium – 80% completed, Podium slab pool area except STP area – wall of pool deck completed, Level 1 to 13 – Type A, B, C & D flats completed, Level 5,6,7 Flat E & F completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7,8 (A,B,C,D) Completed, Masonry – Block/brick – level 2,3,6 (A ,B,C,D) Completed, level 4 Flat A,B,C completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-15th level – 100% completed, level 16 – 90% completed, Masonary/Block work – level 1 35% completed, 2nd – 13th level-100% completed, level 14th to 16th – 90% completed, level 17 – 45% completed, Inside Plastering- level 1 – 25% completed, 2nd – 12th level 100%, level 13 – 100% completed, level 14 – 35% completed
  • Internal Finishes – Door frame fixtures – (106 flats) 70% completed, putty and painting works – level 2 (75% completed), level 3 to level 10 (100% completed), level 11 – 100% completed, level 12 – 75% completed, Water proofing – (level 3,4,5,6,7,8,9,10,11,12 all toilets in bedrooms & balcony completed) 95% completed, terrace floor 25% completed, stair room slab and LMR slab completed, wall tiling – mockup completed, floor tiling – mockup completed
  • Electrical, Plumbing & Firefighting works – electrical works – level 2 to level 15 – 98% completed, concealed plumbing works – level 3 – level 9 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed, vertical lines up to level 10 completed
  • External Finishes – External plastering – south side completed, west side 95% completed, External painting – south side 2 coat damp proof completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.
  • Interior work – Interior ceiling work – 50% completed, wood work – 25% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JULY 2023.

ARTECH LIFE SPACES (TOWER A)

  • Internal Finishes – Waterproofing – 17th level 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed, Electrical works – Passenger lift and lift machine room electrical work to be completed
  • External Finishes – External Plastering – Flat A,B inside parapet wall plastering, p3 columns plastering, Painting Works – 65% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 14 A,B,C,D to be completed, Level 8, 9 & 10 flat E and F to be completed
  • Civil Works – Ceiling Plastering – level 1,2 & 3 E & F to be completed, block work for level 4,5 & 7 A,B,C,D to be completed, 2E to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed
  • Civil Works – Ceiling Plastering- level 16 – 100% to be completed,Masonry – block/brick – level 14th – 16th 100% to be completed, level 17 – 50% to be completed

CLUB HOUSE

  • Internal Finishes – flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 70% to be completed, wood work – 40% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 06-06-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works- Footings – completed, all slab completed – (98% of overall completed)
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed except client change apartments, Passenger lift 2Nos: completed
  • Internal Finishes – Waterproofing- up to 15th level completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed except Bed 1 Toilet
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion completed, External Painting – 35% completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Roof slab podium – 80% completed, Level 1 to 13 – Type A, B, C & D flats completed, Level 3,4 Flat E & F completed, STP – walls and base slab completed, cover slab – 95% completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7 (A,B,C,D) Completed, Masonry – Block/brick – level 2,3,6 (A ,B,C,D) Completed, level 4 Flat A,B,C completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-15th level – 100% completed, level 16 – 90% completed, Masonary/Block work – level 1 35% completed, 2nd – 13th level-100% completed, level 14th to 16th – 75% completed, level 17 – 45% completed, Inside Plastering- level 1 – 25% completed, 2nd – 12th level 100%, level 13 – 100% completed, level 14 – 35% completed
  • Internal Finishes – Door frame fixtures – (100 flats) 70% completed, putty and painting works – level 2 (75% completed), level 3 to level 10 (100% completed), level 11 – 90% completed, level 12 – 35% completed, Water proofing – (level 3,4,5,6,7,8,9,10,11,12 all toilets in bedrooms & balcony completed) 95% completed, terrace floor – stair room slab and LMR slab completed, wall tiling – mockup completed, floor tiling – mockup completed
  • Electrical, Plumbing & Firefighting works – electrical works – level 2 to level 15 – 98% completed, concealed plumbing works – level 3 – level 8 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed, vertical lines up to level 10 completed
  • External Finishes – External plastering – Flat B and C balcony area plastering completed, South side – Flat H completed, Flat A and staircase side completed, Flat A west side completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.
  • Interior work – Interior ceiling work – 50% completed, wood work – 25% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2023.

ARTECH LIFE SPACES (TOWER A)

  • Internal Finishes – Waterproofing – 16th level 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 11th piping to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed, Electrical works – Passenger lift and lift machine room electrical work to be completed
  • External Finishes – External Plastering – Flat A,B side design work plastering, fire stair outside etc to be completed, Painting Works – 55% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 14 A,B,C,D to be completed, Level 5,6 & 7 flat E and F to be completed
  • Civil Works – Ceiling Plastering – level 8th,9th level to be completed, block work for level 5,7 to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed
  • Civil Works – Ceiling Plastering- level 16 – 100% to be completed,Masonry – block/brick – level 14th – 16th 100% to be completed, level 17 – 50% to be completed

CLUB HOUSE

  • Internal Finishes – flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 70% to be completed, wood work – 40% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

 

Work status as on 05-05-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER-D)

  • Structural Works- All sub-structural and structural works-100% completed
  • Civil Works – Ceiling plastering and wall plastering – 100 % completed, Masonry – Block/ brick- 100 % completed, Internal plaster – 100 % completed
  • Internal Finishes – Main door – 100% completed, Waterproofing- 100% completed, Wall Tiling Work – 99% completed, Flooring – 99% completed, Putty works & Painting – 91% completed, Door frame fixtures – 100% completed, Handrails – 100% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 100% completed, Corridor handrail works – 100% completed, Wall and floor services, Risers – 100% completed, Centralised Gas piping system – 95% completed
  • Final Finishes – Door shutters – 100% completed, Final Painting – 90% completed, CP & Sanitaryware – (82 flats) 60% completed, Electrical final fixtures – 88% completed, Fire fighting final fixtures – 100% completed
  • External Finishes – Windows & Sliding doors – 98% completed, External Plastering – 100% completed, External Painting – 92% completed, Louvers/façade/wall cladding – 96% completed
  • Yard Work – External Infrastructure & MEP services & connections – 96% completed
  • Landscape – Hardscape – 95% completed, Landscape area – 95% completed
  • Mockup – Completed.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – 100 % completed, all slab completed – (98% of overall completed), RCC of treated water tank cover slab, Fire and drinking water tank wall and cover slab, Main stair cover slab and beams, terrace parapet 100% completed , rear side RCC retaining wall (35m) completed, Tower B Sump base slab completed.
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed except client change apartments, Passenger lift 1No: completed
  • Internal Finishes – Waterproofing- up to 14th level completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed except Bed 1 Toilet
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th flats sunken floor work completed, concealed work of toilets – up to 7th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift well electrical work completed, fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side palstering completed, External Painting – 15% completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 90% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Roof slab podium – 80% completed, Level 1 to 12 – Type A, B, C & D flats completed, Level 13 Flat A & B completed, Level 2 Flat E & F completed, STP – walls and base slab completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7 (A,B,C,D) Completed, Masonry – Block/brick – level 2,3,6 (A ,B,C,D) Completed, level 4 Flat A,B,C completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 75% completed, sub structural works – 75% completed, slab completed – up to 17th level 100% Completed, 18th level (roof slab – terrace) – completed, Stair case roof slab, LMR base slab, Water Tank base slab – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-15th level, level 16 – 90% completed, Masonary/Block work – level 1 35% completed, 2nd – 13th level-100% completed, level 14th to 16th – 75% completed, level 17 – 45% completed, Inside Plastering- level 1 – 25% completed, 2nd – 12th level 100%, level 13 – 90% completed, level 14 – 20% completed
  • Internal Finishes – Door frame fixtures – (100 flats) 70% completed, putty and painting works – level 2 (75% completed), level 3 to level 10 (100% completed), level 11 – 90% completed, level 12 – 10% completed, Water proofing – (level 3,4,5,6,7,8,9,10,11,12 all toilets in bedrooms & balcony completed) 95% completed, wall tiling – mockup completed, floor tiling – mockup completed
  • Electrical, Plumbing & Firefighting works – electrical works – level 2 to level 15 – 98% completed, concealed plumbing works – level 3 – level 8 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed
  • External Finishes – External plastering – Flat B and C balcony area plastering done from level 12 to level 1 completed, South side – (Flat H, level 1 to 17), Flat A and staircase side – level 18 – level 5 completed, Flat A west side level 17 to level 11 completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2023.

ARTECH LIFE SPACES (TOWER-D)

  • Internal Finishes – Wall Tiling – 100% to be completed, flooring – 100% to be completed, Putty works and painting – 95% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised Gas piping system – 97% to be completed.
  • Final Finishes – Final Painting – 94% to be completed, CP and Sanitary ware – 65% to be completed, Electrical final fixtures – 100% to be completed
  • External Finishes – Windows & Sliding doors – 100% to be completed, External Painting – 96% to be completed, Louvers/façade/wall cladding – 98% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 98% to be completed
  • Landscape – Hardscape – 100% to be completed, Specialist works in landscape area – 100% to be completed

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Tower B – sump walls, retaining wall 10m, treated water tank A & B Sump to be completed
  • Internal Finishes – Waterproofing – 15th level (A,B,C,D) 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 11th piping to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed, Electrical works – Passenger lift and lift machine room electrical work to be completed
  • External Finishes – External Plastering – A Flat rear side 7th to 1st level, B Flat side area parapet to 1st level 100% to be completed, Painting Works – 30% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – STP cover slab to be completed, Raft slab – 100% to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 13 – C,D to be completed, Level 3, 4 Flat E & F to be completed, level 14 Flat A & B to be completed
  • Civil Works – Ceiling Plastering – level 8th,9th level to be completed, block work for level 5,7 to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Basement slab @ 101.35 – 70% to be completed & 104.35 – 80% to be completed, sub structural works – 80% to be completed
  • Civil Works – Ceiling Plastering- level 16 – 100% to be completed,Masonry – block/brick – level 14th – 16th 100% to be completed, level 17 – 50% to be completed, Inside plastering – level 13th – 100% to be completed.

CLUB HOUSE

  • Internal Finishes – flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 08-04-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER-D)

  • Structural Works- All sub-structural and structural works-100% completed
  • Civil Works – Ceiling plastering and wall plastering – 100 % completed, Masonry – Block/ brick- 100 % completed, Internal plaster – 100 % completed
  • Internal Finishes – Main door – 100% completed, Waterproofing- 100% completed, Wall Tiling Work – 99% completed, Flooring – 99% completed, Putty works & Painting – 91% completed, Door frame fixtures – 100% completed, Handrails – 100% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 100% completed, Corridor handrail works – 100% completed, Wall and floor services, Risers – 100% completed, Centralised Gas piping system – 95% completed
  • Final Finishes – Door shutters – 100% completed, Final Painting – 90% completed, CP & Sanitaryware – (82 flats) 60% completed, Electrical final fixtures – 88% completed, Fire fighting final fixtures – 100% completed
  • External Finishes – Windows & Sliding doors – 98% completed, External Plastering – 100% completed, External Painting – 92% completed, Louvers/façade/wall cladding – 96% completed
  • Yard Work – External Infrastructure & MEP services & connections – 96% completed
  • Landscape – Hardscape – 95% completed, Landscape area – 95% completed
  • Mockup – Completed.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – 100 % completed, all slab completed – (98% of overall completed), RCC of treated water tank cover slab, Fire and drinking water tank wall and cover slab, Main stair cover slab and beams, terrace parapet 100% completed , rear side RCC retaining wall (35m) completed.
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed except client change apartments.
  • Internal Finishes – Waterproofing- up to 14th level completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th flats sunken floor work completed, concealed work of toilets – up to 6th floor completed, Electrical work – box fixing & piping upto 17th level completed, fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side palstering completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 90% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Roof slab podium – 80% completed, Level 1 to 12 – Type A, B, C & D flats completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7 (A,B,C,D) Completed, Masonry – Block/brick – level 2 (A ,B,C,D) Completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 75% completed, sub structural works – 75% completed, slab completed – up to 17th level 100% Completed, 18th level (roof slab – terrace) – completed, Stair case roof slab, LMR base slab, Water Tank base slab – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-15th level, level 16 – 90% completed, Masonary/Block work-level 1 35% completed, 2nd – 13th level-100% completed, level 14th to 16th – 75% completed, level 17 – 25% completed, Inside Plastering- level 1 – 25% completed, 2nd – 12th level 100%, level 13 – 65% completed
  • Internal Finishes – Door frame fixtures – (94 flats) 70% completed, putty and painting works – level 2 (75% completed), level 3 to level 10 (100% completed), level 11 – 65% completed, Water proofing – (level 3,4,5,6,7 & 8 all toilets in bedrooms & balcony completed) 95% completed
  • Electrical, Plumbing & Firefighting works – (electrical works – level 2 to level 13 – 98% completed), concealed plumbing works – level 3 – level 8 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed
  • External Finishes – External plastering – Flat B and C balcony area plastering done from level 12 to level 1 completed, South side – (Flat H, level 1 to 17), Flat A and staircase side – level 18 – level 5 completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of APRIL 2023.

ARTECH LIFE SPACES (TOWER-D)

  • Internal Finishes – Wall Tiling – 100% to be completed, flooring – 100% to be completed, Putty works and painting – 95% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised Gas piping system – 97% to be completed.
  • Final Finishes – Final Painting – 94% to be completed, CP and Sanitary ware – 65% to be completed, Electrical final fixtures – 100% to be completed
  • External Finishes – Windows & Sliding doors – 100% to be completed, External Painting – 96% to be completed, Louvers/façade/wall cladding – 98% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 98% to be completed
  • Landscape – Hardscape – 100% to be completed, Specialist works in landscape area – 100% to be completed

ARTECH LIFE SPACES (TOWER A)

  • Civil Works – Passenger lift inside plastering – 1 No: 100% to be completed
  • Internal Finishes – Waterproofing – 15th level (A,B,C,D) 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 11th piping to be completed, Fire fighting Work piping work – duct piping work 1st to 10th 100% to be completed
  • External Finishes – External Plastering – A Flat rear side 7th to 1st level, A Flat left side area parapet to 1st level 100% to be completed, Painting Works – A & D flats external putty, primer etc to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – STP cover slab to be completed, Raft slab – 100% to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1,level 13 – A,B,C,D to be completed, Level 2,3 E & F to be completed
  • Civil Works – Ceiling Plastering – level 8th,9th level to be completed, block work for level 3,4,5,7 (A,B,C,D) to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Basement slab @ 101.35 – 70% to be completed & 104.35 – 80% to be completed, sub structural works – 80% to be completed
  • Civil Works – Ceiling Plastering- level 16 – 100% to be completed,Masonry – block/brick – level 14th – 16th 100% to be completed, Inside plastering – level 13th – 100% to be completed.

CLUB HOUSE

  • Internal Finishes – flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes –
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Click here to see the previous work progress updates.

Are you on the lookout for a home loan? We can help you. We have tie-ups with prominent banks for this project. It will help you make the loan application process easier.

  1. INDOOR BADMINTON COURT
  2. BANQUET HALL
  3. BEAUTY SALON
  4. AV ROOM
  5. LAUNDRY
  6. VIRTUAL GOLF
  7. GAMES ROOM
  8. MEETING ROOM
  9. BUSINESS CENTRE
  10. LIBRARY
  11. TUITION ROOM
  12. GUEST ROOMS
  13. GUEST SUITE
  14. CRECHE
  15. PLAY STATION
  16. SAUNA FOR GENTS AND LADIES
  17. JACUZZI FOR GENTS AND LADIES
  18. AIR-CONDITIONED UNISEX GYM
  19. SWIMMING POOL FOR ADULTS AND KIDS
  20. CHILDREN PLAY AREA
  21. ROOFTOP PARTY AREA
  22. FEATURE ARRIVAL COURT
  23. VERTICAL GREEN WALL
  24. SECURITY KIOSK
  25. TRELIS AT TOWER ENTRY
  26. SKATING RINK
  27. BUTTERFLY GARDEN
  28. PATHWAY/JOGGING TRACK
  29. YOGA COURT
  30. LAZY LAWNS
  31. LILY POND/REFLECTIVE POOL
  32. PODIUM MEETING PLAZA
  33. CHESS COURT
  34. SENIOR CITIZEN CORNER
  35. PRIVACY PLANTING
  36. INTERACTIVE COURT

Structure

  • Column footing complying with seismic 3 zone.
  • RCC frame structure with brickwork and or concrete block partitions. Concrete grade and Steel grade as per structural consultant’s advice.

 

Flooring, Tiling & Railings

  • Main entrance lobby, Lift lobby and Lift fascia (wall & floor) using composite marble / granite / vitrified tiles, as per the architect’s design.
  • Staircases using granite / vitrified tile flooring with hand railing using SS / MS / GI  with or without toughened glass as per architect’s design.
  • Car park Area: Grano flooring with grooves or exterior grade paving tiles.
  • Foyer / Living / Dining using 80cm X 80cm Premium Double charged vitrified tiles (Kajaria / Asian).
  • Kitchen: 60cm X 60cm premium double charged Vitrified tiles for the flooring (Kajaria / Asian / Somany).
  • All Bedrooms : 60cm X 60cm Premium Double Charged Vitrified tiles (Kajaria / Asian / Somany).
  • All Bed room Toilets : Designer ceramic tile concepts 30cm X 30cm for floor and 60cm X 30cm for walls up to ceiling height of 8’ 0.
  • Servants Toilet : Ceramic tile 30cm X 30cm for floor and 30cm X 45cm for walls upto 7’6″ height.
  • Utility Room : 30cm X 30cm for floor and 30cm X 45cm for (kitchen wall) walls at a height of 2’ above the counter if any (using any premium Indian brands).
  • Balconies / Open Terraces / Decks : Rustic / Antiskid / ceramic tiles 30cm X 30cm or (wood finished vitrified tiles) with SS / MS / GI  with or without toughened glass as per architect’s design upto 1.2m heights (using any premium Indian brands).  

 

Sanitary & Plumbing

  • Sanitary fittings: will be of KOHLER or ROCA.
  • All Sanitary wares shall be of white colour only.
  • Concealed cisterns (concealed flushing system) will be of GEBERIT from Switzerland or GROHE from Germany. Actuator plates shall be in CP Finish dual flushing system.
  • Faucets: for all the bed room toilets will be single lever concealed diverters CP finish, heavy body metal fittings of ROCA from Spain or GROHE from Germany or KOHLER. Provision for hot water connection shall be provided for overhead shower.
  • Wall mounted single lever faucet make ROCA from Spain or GROHE from Germany or KOHLER will be provided for the wash basins, Kitchen and utility area sink.
  • Plumbing: All water supply lines shall be in ISI marked CPVC pipes. Drainage lines and storm water drain pipes shall be in PVC, Cockroach traps make CHILLI shall be provided as gratings for all necessary locations, Health Faucet ROCA from Spain or GROHE  from Germany or KOHLER shall be provided near EWC in all the toilets.
  • Stainless Steel Sink multi bowl with drain board of make NIRALI / FRANKE shall be provided for the kitchen and stainless steel sink without drain board shall be provided for the utility areas.
  • Towel rods, towel ring, soap dish shall be provided inside the toilets.

 

Doors & Windows

  • Window shutters: Prefabricated colour anodised aluminum sliding shutters by (Hindalco). One pane of Insect screen also shall be provided in each window.
  • Door Frames: Main door frame and shutter shall be of seasoned teak wood. Outer and Inner face to be PU coated and finished as per the Architect’s design.
  • Door Shutters: All internal door frames shall be of seasoned hard wood with flush door shutters. All internal and external faces shall be melamine finish or Paint finish as per the Architects design.
  • Hardware: All hardware shall be in C.P Brass, tower bolts, doorstoppers, ball bearing hinges. Locks shall be mortise of DORSET / YALE make from USA or equivalent.
  • Entrance door shall have hardware such as, Magic Eye, Safety Chain, Door Stopper and a BIO Metric lock from HAFELE or YALE.

 

Electrical

  • Concealed copper wiring using FINOLEX / V-GUARD / HAVELLS make cables with modular plate switches, centralized cabling system for all electrical and communication requirements.
  • Wiring shall be done for lighting, 6 Amps, 16 Amps and AC points in the Apartment.
  • Switches: All switches shall be LEGRAND or SCHNEIDER.
  • Generator: Power backup will be provided for all common services and selected light and fan point in each living, bedrooms inside apartment and a refrigerator point, plus additional one 6 Amp plug point in the Kitchen, one light point in all the toilets, one 6 Amp plug point at Living for emergency charging of devices shall be provided (Air-conditioning and Geyser points and other 16 Amp points will not be considered for the power back up).
  • Light fixtures for the Common areas, external areas, apartment balconies and at entrance door of the individual apartments shall be provided.
  • All light fixtures shall be of PHILIPS / HAVELLS.
  • Adequate ELCB and MCB shall be provided in each apartments SIEMENS / HAVELLS.
  • Provision for the GEYSER points and fresh air fans shall be provided for all toilets.
  • Provision for telephone and Internet shall be provided in the living room and master bed room.
  • Provision for Cable TV / DTH shall be provided in the Living and Master Bed room.

 

Paint Finishes:

  • Premium emulsion paint shall be applied for the ceiling and interior walls of the apartments excluding Utility and Services.
  • Internal Walls: Acrylic / cement based Putty with Premium emulsion paint.
  • External Walls: Weather shield exterior grade emulsion / texture paint.

 

Elevator/s

  • Elevators: High Speed lift shall be provided as per the Govt. norms in each core with automatic doors & SS brush finish of KONE  / SCHINDLER or MITSUBISHI.
  • ARD (Automatic Rescue Device) shall be installed in the passenger lift as a premium feature.

 

Air Conditioning

  • Provision for Air-Conditioning in Living, Dining and all bed rooms.

 

Home Automation:

  • Multi level security systems for common areas and lobbies, Access control entry to the common entrance / foyers and gymnasium.
  • Light motion sensors for selected common areas.
  • Home security monitoring, gas leakage detectors, emergency panic intrusion alarm, visitor tracking.

 

Landscaping

  • Provision for sprinklers and a drip system shall be provided for necessary common area landscaping.
  • Interlock Pavers to be laid in driveways and walkways.
  • Hard and soft landscaping shall be provided as per the landscape consultant’s design.

Work status as on 09-03-2024, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – completed, Sump tank completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup, 1D,7B,7A,3B,4B,9B,1A,1B,1C completed, Staircase Handrail – Mainstair and firestair P3 to 1st level completed, Balcony handrail – 7B,3B,1A,1B 100% completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, Machine room electrical work completed (LT), fire fighting piping work up to 10th level completed, Centralised Gas piping – A,B,C,D flats main riser piping work 100% completed
  • External Finishes – Sliding Doors and Windows – 7B,3B completed, A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side completed External Painting – first coat 98% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Civil Works Ceiling Plastering – level 1 to 11 (A,B,C,D) and 1 to 13 (E & F) Completed, 13(C,D,E&F), 14(A&B), 7 to 13th A &B lobby plastering completed, 14 (C,D,E &F), 15( A,B,C,D,E&F), 16 (A,B,C,D,E,F) completed, Masonry – Block/brick – 3E, level 4 to 7 (E & F) Completed, level 8,9 (A,B,C,D,E &F),10A completed, 4D,10(B,C,D,E&F), 11(A&B) Completed, 5 (B, C,D),11 (C,D,E&F), 12, 13,( A,B,E&F), 13 (C&D), 7A,14,15 (A,B,E,F) on progress, Inside plastering – level 1 (A,B,C & D) & Level 3 to 6 (E & F) completed, 3C, 8 (A,B,C,D) & 7,8(E&F) completed, 3D, 9 (A,F),10A Completed, 2(C&D), 9E,10F,9 (B,C,D),10F,10C,11A,2B,4B,9E,10F,9(B,C,D),10C,11A,11F, stair case side wall plastering till 7th floor on progress
  • Internal Finishes Door frame fixtures – 66 Door frame fixtures completed, putty and painting work – 4E&F, 3E&F on progress

ARTECH LIFE SPACES (TOWER C)

  • Civil Works Ceiling Plastering – basement ceiling – 80% completed, level 1 90% completed, 2nd-17th level – 100% completed, Masonry/Block work – level 1 – 100% completed, 2nd – 17th level – 100% completed, Inside Plastering- level 1 – 90% completed, 2nd – 17th level 100% completed.
  • Internal Finishes Door frame fixtures – (126 flats) 85% completed, Main door fixing – level 3,4,5 completed, putty and painting works – level 2 to level 16 – 95% completed, Waterproofing (level 3 to 17) all toilets in bedrooms & balcony completed), Level 16 all toilets completed, terrace floor 85% completed, OHT – completed, wall tiling – Level 3 – level 7 – 80% completed, level 8,9,10 on progress, floor tiling – level 3 – level 7 – 80% completed , level 8,9,10 on progress, putty and painting – level 2 to level 16 – 95% completed
  • Electrical, Plumbing & Firefighting works Electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 12 (80% completed), fire fighting work @ level 3 to level 17 fittings and pipe installation completed, vertical lines up to level 17 completed
  • External Finishes Sliding doors and windows – level 3 – 70% completed, External plastering – completed, External painting – south side first coat painting completed, east side primer and putty – 50% completed, west side primer & putty work completed, light well damp proof completed

CLUB HOUSE

  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed, Door frame fixtures-100% completed
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works- 90% Completed, wall and floor risers – 95% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.Windows & sliding door-85% completed
  • Interior work – Interior ceiling work – 90% completed, wood work – 80% completed, furniture – 20% completed, painting (PU) – 25% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of MARCH 2024.

ARTECH LIFE SPACES (TOWER A)

  • Internal Finishes – Tiling – 2A,2B,2C,2D,16D toilets tile work to be completed, Staircase Handrail – Mainstair 1st to 6th floor 100% to be completed, Balcony handrail – 9B,4B,7A 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work inside flat work 11th to 17th floor 100% to be completed
  • External Finishes – Sliding Doors and Windows – 7A,4B,9B to be completed, Painting Works – common area painting – 30% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Civil Works – Ceiling Plastering – 17th, 18th (A,B,C,D) to be completed, block work – 7 (A,B,C,D), 13 (C,D), 15 (C,D,E,F), 16 & 17 to be completed, Inside plastering – level 2A,4B,12th,13th floor to be completed
  • Internal Finishes – Door frame fixtures – 36 more Door frame fixtures to be completed, putty and painting work – 5 (E,F),6 (E,F), 7 (E&F) , 8 A,B,C,D,E,F to be completed

CLUB HOUSE

  • Internal Finishes – Flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.Hand rail works-50% to be completed
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works -100% to be completed, wall and floor risers – 100% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 100% to be completed, wood work – 100% to be completed furniture – 70% to be completed, painting (PU) – 75% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 10-02-2024, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 98% completed, Retaining wall work (8m) 100% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed.
  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – completed, Sump tank completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup, 1D,7B,7A,3B,4B completed, Staircase Handrail – Mainstair and firestair P3 to 1st level completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, Machine room electrical work completed (LT), fire fighting piping work up to 9th level completed, Centralised Gas piping – 1st level internal 90% completed
  • External Finishes – Sliding Doors and Windows – 7B,3B completed, A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side completed External Painting – first coat 98% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Grade slab completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Podium slab 90% completed, Roof slab – Reflective pool wall up to base of reflective pool and sitting area in reflective pool completed, Level 1 to 18 – Type A, B, C & D flats completed, Level 5 to 11 & 13,14,15,16,17 Flat ( E & F) completed
  • Civil Works – Ceiling Plastering – level 1 to 11 (A,B,C,D) and 1 to 13 (E & F) Completed, 13(C,D,E&F), 14(A&B), 7 to 13th A &B lobby plastering completed, 14 C,D,E &F, 15 A,B,C,D,E&F, 16 A,B,C,D on progress, Masonry – Block/brick – 3E, level 4 to 7 (E & F) Completed, level 8,9 (A,B,C,D,E &F),10A completed, 4D,10(B,C,D,E&F), 11(A&B) Completed, 5B,11 C,D,E&F, 12, 13, A,B,E&F, 13 C&D on progress, Inside plastering – level 1 (A,B,C & D) & Level 3 to 6 (E & F) completed, 3C, 8 (A,B,C,D) & 7,8(E&F) completed, 3D, 9 A,F,10A Completed, 2C&D, 9E,10F,9 B,C,D,10F,10C,11A on progress
  • Internal Finishes – Door frame fixtures – 44 Door frame fixtures completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 80% completed, 2nd-17th level – 100% completed, Masonry/Block work – level 1 – 95% completed, 2nd – 17th level – 100% completed, Inside Plastering- level 1 – 85% completed, 2nd – 17th level 100% completed.
  • Internal Finishes – Door frame fixtures – (126 flats) 85% completed, Main door fixing – level 3 completed, putty and painting works – level 2 to level 15 – 95% completed, Waterproofing (level 3 to 15) all toilets in bedrooms & balcony completed), Level 16 all toilets completed, terrace floor 85% completed, OHT – completed, wall tiling – Level 3 – 95% completed, level 4 – 95% completed, level 5 – 95% completed, level 6 – 70% completed, level 7 – 40% completed, floor tiling – level 3 – 95% completed, level 4 – 95% completed, level 5 – 95% completed, level 6 – 85% completed, level 7 – 60% completed
  • Electrical, Plumbing & Firefighting works – Electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 11 (80% completed), fire fighting work @ level 3 to level 15 fittings and pipe installation completed, vertical lines up to level 17 completed
  • External Finishes – External plastering – completed, External painting – south side first coat painting completed, east side primer and putty – 50% completed, west side primer & putty work completed, light well damp proof completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works- 90% Completed, wall and floor risers – 95% completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed, Door frame fixtures-100% completed
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 95% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.Windows & sliding door-85% completed
  • Interior work – Interior ceiling work – 80% completed, wood work – 80% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of FEBRUARY 2024.

ARTECH LIFE SPACES (TOWER A)

  • Internal Finishes – Tiling – 1A,1B, 1C, 2A, 7B, 2B,2C,2D,9B,16D toilets tile work to be completed, Staircase Handrail – Mainstair 1st to 6th floor 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – main riser duct piping work 9th to 17th level 100% to be completed, Centralised Gas piping – A,B,C,D flats main riser piping work 100% to be completed
  • External Finishes – Sliding Doors and Windows – 7A,4B to be completed, Painting Works – 100% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 18 flat (E&F) to be completed
  • Civil Works – Ceiling Plastering – 16E&F, 17th, 18th (A,B,C,D) to be completed, block work – 5 B,C,D, 7 A,B,C,D, 14,15 A,B,C,D,E&F to be completed, Inside plastering – 2A&B, 4(A,B,C,D) to be completed
  • Internal Finishes – Door frame fixtures – 28 more Door frame fixtures to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footing balance 9+5 to be completed, Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed.

CLUB HOUSE

  • Internal Finishes – Flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.Hand rail works-50% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% to be completed, wall and floor risers – 100% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 90% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 13-01-2024, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 98% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed.
  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed, Staircase Handrail – Mainstair P3 to 1st level completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, Machine room electrical work completed (LT), fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side completed External Painting – first coat 98% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Podium slab pool area except STP area – 90% pool deck completed, Roof slab – Reflective pool wall up to base of reflective pool and sitting area in reflective pool completed, Level 1 to 17 – Type A, B, C & D flats completed, Level 5 to 11 & 13,14,15,16,17 Flat ( E & F) completed
  • Civil Works – Ceiling Plastering – level 1 to 11 (A,B,C,D) and 1 to 13 (E & F) Completed, 13(C,D,E&F), 14(A&B), 7 to 13th A &B lobby plastering completed, Masonry – Block/brick – 3E, level 4 to 7 (E & F) Completed, level 8,9 (A,B,C,D,E &F),10A completed, 4D,10(B,C,D,E&F), 11(A&B) Completed, Inside plastering – level 1 (A,B,C & D) & Level 3 to 6 (E & F) completed, 3C, 8 (A,B,C,D) & 7,8(E&F) completed, 3D, 9 A,F,10A Completed
  • Internal Finishes – Door frame fixtures – 26 Door frame fixtures completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 80% completed, 2nd-17th level – 100% completed, Masonry/Block work – level 1 – 90% completed, 2nd – 17th level – 100% completed, Inside Plastering- level 1 – 75% completed, 2nd – 17th level 100% completed.
  • Internal Finishes – Door frame fixtures – (110 flats) 75% completed, Main door fixing – level 3 completed, putty and painting works – level 2 to level 15 – 95% completed, Waterproofing (level 3 to 15) all toilets in bedrooms & balcony completed), Level 16 all toilets completed, terrace floor 85% completed, OHT – completed, wall tiling – Level 3 – 95% completed, level 4 – 80% completed, level 5 – 95% completed, level 6 – 70% completed, level 7 – 40% completed, floor tiling – level 3 – 95% completed, level 4 – 95% completed, level 5 – 95% completed, level 6 – 85% completed, level 7 – 60% completed
  • Electrical, Plumbing & Firefighting works – Electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 11 (80% completed), fire fighting work @ level 3 to level 15 fittings and pipe installation completed, vertical lines up to level 17 completed
  • External Finishes – External plastering – completed, External painting – south side first coat painting completed, east side primer and putty – 50% completed, west side primer & putty work completed, light well damp proof completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed, Door frame fixtures-100% completed
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works- 90% Completed, wall and floor risers – 95% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.Windows & sliding door-50% completed
  • Interior work – Interior ceiling work – 80% completed, wood work – 80% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JANUARY 2024.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Retaining wall work (8m) 100% to be completed
  • Internal Finishes – Painting Works – balcony inside putty, primer work 100% to be completed, Tiling – 1A,1B, 1C, 2A, 7B to be completed, Staircase Handrail – Fire stair handrail P3 to level 1 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – main riser duct piping work 9th to 17th level 100% to be completed
  • External Finishes – Painting Works – 100% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, Level 18 flats (A,B,C &D) to be completed, level 18 flat (E&F) to be completed
  • Civil Works – Ceiling Plastering – 14th level (C,D,E &F), 15th (A,B,C,D,E &F) plastering to be completed, block work – 5,7 (A,B,C,D), 11 (C,D,E&F), 12,13 (A,B,C,D,E&F) to be completed, Inside plastering – Level 9E,10F,9B,C,D,10F to be completed
  • Internal Finishes – Door frame fixtures – 18 more Door frame fixtures to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footing balance 9+5 to be completed, Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed.

CLUB HOUSE

  • Internal Finishes – Flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.Hand rail works-50% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% to be completed, wall and floor risers – 100% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 90% to be completed
  • Yard Work -External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 08-12-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 98% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed.
  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed, Staircase Handrail – Mainstair P3 to 1st level completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, Machine room electrical work completed(LT), fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side completed External Painting – 90% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Podium slab pool area except STP area – 90% pool deck completed, Roof slab – Reflective pool wall up to base of reflective pool and sitting area in reflective pool completion, Level 1 to 15 – Type A, B, C & D flats completed, Level 5 to 11 & 13,14,15 Flat ( E & F) completed, Level 16 – A,B,C,D completed
  • Civil Works – Ceiling Plastering – level 1 to 11 (A,B,C,D) and 1 to 13 (E & F) Completed 7 to 13th A &B lobby plastering completed, Masonry – Block/brick – 3E, level 4 to 7 (E & F) Completed, level 8,9 (A,B,C,D,E &F),10A completed, Inside plastering – level 1 (A,B,C & D) & Level 3 to 6 (E & F) completed, 3C, 8 (A,B,C,D) & 7,8(E&F) completed
  • Internal Finishes – Door frame fixtures – 26 Door frame fixtures completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 50% completed, 2nd-17th level – 100% completed, level 16 – 90% completed, Masonry/Block work – level 1 – 80% completed, 2nd – 17th level – 100% completed, Inside Plastering- level 1 – 45% completed, 2nd – 17th level 100% completed.
  • Internal Finishes – Door frame fixtures – (110 flats) 75% completed, Main door fixing – level 3 completed, putty and painting works – level 2 to level 14 – 95% completed, Waterproofing (level 3 to 15) all toilets in bedrooms & balcony completed), terrace floor 85% completed, OHT – 20% completed, wall tiling – Level 3 – 95% completed, level 4 – 80% completed, level 5 – 95% completed, level 6 – 50% completed, floor tiling – level 3 – 95% completed, level 4 – 95% completed, level 5 – 95% completed, level 6 – 50% completed
  • Electrical, Plumbing & Firefighting works – Electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 10 (80% completed), fire fighting work @ level 3 to level 12 fittings and pipe installation completed, vertical lines up to level 12 completed
  • External Finishes – External plastering – completed, External painting – south side, west side primer & putty work completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed, Door frame fixtures-100% completed
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.Windows & sliding door-50% completed
  • Interior work – Interior ceiling work – 70% completed, wood work – 70% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2023.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Retaining wall work (8m) 100% to be completed
  • Internal Finishes – Painting Works – balcony inside putty, primer work 100% to be completed, Tiling – 1A,1B, 1C, 2A, 7B to be completed, Staircase Handrail – Fire stair handrail P3 to level 1 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – main riser duct piping work 9th to 17th level 100% to be completed
  • External Finishes – Painting Works – 100% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, Level 17,18 flats (A,B,C &D) to be completed, level 16,17 & 18 flat (E&F) to be completed
  • Civil Works Ceiling Plastering – 13th level (C,D,E &F), 14th (A,B,C,D,E &F) plastering to be completed, block work – 4D, 5,7 (A,B,C,D), 10 (B,C,D,E&F), 11,12 (A,B,C,D,E&F) to be completed, Inside plastering – Level 3D, 9,10 (A,B,C,D,E & F) to be completed
  • Internal Finishes – Door frame fixtures – 18 more Door frame fixtures to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footing balance 9+5 to be completed, Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed.
  • External Finishes – External plastering – passage light well area plastering to be completed, External painting – east side damp proof coating to be completed

CLUB HOUSE

  • Internal Finishes – Flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.Hand rail works-50% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% to be completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 80% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 10-11-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 98% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed.
  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – 50% completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed, Staircase Handrail – Mainstair P3 to 1st level completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, fire fighting piping work up to 9th level completed.Machine room electrical work completed(LT)
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side – 95% completed External Painting – 70% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Podium slab pool area except STP area – 90% pool deck completed, Roof slab – Reflective pool wall up to base of reflective pool and sitting area in reflective pool completion, Level 1 to 15 – Type A, B, C & D flats completed, Level 5 to 11 Flat ( E & F) completed, Level 16 – A & B completed
  • Civil Works – Ceiling Plastering – level 1 to 11 (A,B,C,D) and 1 to 9 (E & F) Completed 7 to 11 lobby completed, Masonry – Block/brick – 3E, level 4 to 7 (E & F) Completed, level 8 (A,B,C,D,E &F) completed, Inside plastering – level 1 (A,B,C & D) & Level 3 to 6 (E & F) completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 45% completed, 2nd-17th level – 100% completed, level 16 – 90% completed, Masonary/Block work – level 1 – 80% completed, 2nd – 17th level – 100% completed, Inside Plastering- level 1 – 25% completed, 2nd – 17th level 100% completed.
  • Internal Finishes – Door frame fixtures – (110 flats) 75% completed, putty and painting works – level 2 to level 14 – 95% completed, Waterproofing (level 3 to 15) all toilets in bedrooms & balcony completed), terrace floor 85% completed, wall tiling – Level 3 – 95% completed, level 4 – 80% completed, level 5 – 65% completed, floor tiling – level 3 – 95% completed, level 4 – 80% completed, level 5 – 65% completed
  • Electrical, Plumbing & Firefighting works – Electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 9 (80% completed), fire fighting work @ level 3 to level 12 fittings and pipe installation completed, vertical lines up to level 12 completed
  • External Finishes – External plastering – completed, External painting – south side, west side primer & putty work completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed,Door frame fixtures-100% completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes External Plastering – 100% Completed, External Painting-75% Completed. Windows & sliding door-50% completed
  • Interior work – Interior ceiling work – 70% completed, wood work – 70% completed
  • Yard Work -External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2023.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Sump tank of Tower A up to cover slab level wall casting to be completed
  • Civil Works – Flat BC rear side 100% plastering to be completed.
  • Internal Finishes – Waterproofing – Terrace level – 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed, Tiling – 1A,1B & 1C 2A to be completed, Staircase Handrail – Fire stair handrail P3 to level 1 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed,Rectification work 1st to 9th floor 100% to be completed.

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 16 (C & D), level 17 flat (A&B) to be completed, Level 13 to 15 flat (E and F) to be completed, Reflective pool base and wall to be completed
  • Civil Works – Ceiling Plastering – level 10 to 13 (E & F) to be completed, Level 12th,13th (A,B,C, &D) lobby plastering to be completed, block work level 9 to 11 (A,B,C,D,E & F) to be completed, Inside plastering – Level 3C & 3D, to be completed, level 8,9 (A,B,C & D) & level 7 to 9 (E &F) to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footing balance 9+5 to be completed.Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed.

CLUB HOUSE

  • Internal Finishes – Flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.Hand rail works-50% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 80% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 10-10-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 98% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed.
  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – 50% completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, fire fighting piping work up to 9th level completed.Machine room electrical work completed(LT).
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side – 95% completed External Painting – 70% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed,Podium slab pool area except STP area – 90% pool deck completed,Roof slab-Reflective pool wall up to base of reflective pool and sitting area in reflective pool completion Podium slab pool area over STP area completed, Level 1 to 14 – Type A, B, C & D flats completed, Level 5,6,7,8,9,10 Flat E & F completed, Level 15 – A & B completed ,Level-9,10 Flat E&F completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7,8,9,10,11 (A,B,C,D) and 1,2,3,4,5,6,7,8 (E & F) Completed 7,8,9 lobby completed, Masonry – Block/brick – level 2,3,6 (A,B,C,D),2E&F,3F completed, Level 4,5,6 E&F on progress ,Level 1 A,B.C,D completed level 4 D, 7 A&B on progress, Inside plastering – 3A & 3B on progress,Wall plastering 1,2 E&F completed,1A plastering on progress

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-16th level – 100% completed, level 16 – 90% completed, Masonary/Block work – level 1 – 80% completed, 2nd – 17th level-100% completed, Inside Plastering- level 1 – 25% completed, 2nd – 16th level 100% completed.
  • Internal Finishes – Door frame fixtures – (110 flats) 75% completed, putty and painting works – level 2 to level 14- 95% completed, level 13-75% completed, Waterproofing (level 3,4,5,6,7,8,9,10,11,12,13,14) all toilets in bedrooms & balcony completed), terrace floor 85% completed, stair room slab and LMR slab completed, wall tiling-3H,3B completed, floor tiling – mockup completed,3B on going
  • Electrical, Plumbing & Firefighting works – Electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 9 (80% completed), fire fighting work @ level 3 to level 12 fittings and pipe installation completed, vertical lines up to level 10 completed
  • External Finishes – External plastering – south side completed, west side completed, East side completed, North side & light well area 50% completed, External painting – south side 2 coat damp proof and primer completed, west side – damp proof completed, primer & putty work on progress
  • Yard Work – External infrastructure &MEP services & connections

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed,Door frame fixtures-100% completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes External Plastering – 100% Completed, External Painting-75% Completed.Windows & sliding door-50% completed
  • Interior work – Interior ceiling work – 70% completed, wood work – 70% completed
  • Yard Work -External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2023.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Sump tank of Tower A up to cover slab level wall casting to be completed
  • Civil Works – Flat BC rear side 100% plastering to be completed.
  • Internal Finishes – Waterproofing – Terrace level – 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed, Tiling – 1A,1B & 1C 2A to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed,Rectification work 1st to 9th floor 100% to be completed.
  • External Finishes – External Plastering – Flat B & C rear side plastering 100% to be completed, Painting Works – 80% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 15 C,D,level 16 flat A&B to be completed, Level 11,12 & 13 flat E and F to be completed .Reflective pool base and wall to be completed .Roof slab on level11,12&13 to be completed. Balance swimming pool deck level wall&slab completetion except STP area to be completed.
  • Civil Works – Ceiling Plastering – level 12,13A,B,C,D E & F 10,11,12,13 th lobby plastering to be completed, block work for level 3E,4,5,6,7(E&F)8(A,B,C,D,E,F) (A,B,C,D) to be completed, Inside plastering -Level 3(A&B),level1(A,B,CD),level3,4,5( E&F) to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footing balance 9+5 to be completed.Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed.
  • Civil Works – Ceiling Plastering- level 17 – 100% to be completed, Masonry – block/brick – level 17th 100% to be completed

CLUB HOUSE

  • Internal Finishes – Flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.Hand rail works-50% to be completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 80% to be completed, wood work – 70% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 13-09-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 90% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed
  • Internal Finishes – Waterproofing- up to 17th level completed, Terrace level – 30% completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, B & C rear side – 85% completed External Painting – 65% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed,Podium slab pool area except STP area – 90% pool deck completed, Podium slab pool area over STP area completed, Level 1 to 14 – Type A, B, C & D flats completed, Level 5,6,7,8,9,10 Flat E & F completed, Level 15 – A & B completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7,8,9,10,11 (A,B,C,D) and 1,2,3,4 (E & F) Completed, Masonry – Block/brick – level 2,3,6 (A,B,C,D) Completed, level 4 Flat A,B,C completed, Level 4D, 7 A&B on progress, Inside plastering – 3A & 3B on progress

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-15th level – 100% completed, level 16 – 90% completed, Masonary/Block work – level 1 80% completed, 2nd – 13th level-100% completed, level 14th to 16th – 100% completed, level 17 – 90% completed, Inside Plastering- level 1 – 25% completed, 2nd – 14th level 100% completed, Level 15 – 65% completed
  • Internal Finishes – Door frame fixtures – (110 flats) 75% completed, putty and painting works – level 2 (75% completed), level 3 to level 12 (100% completed), level 13 – 75% completed, Waterproofing – (level 3,4,5,6,7,8,9,10,11,12 all toilets in bedrooms & balcony completed), terrace floor 55% completed, stair room slab and LMR slab completed, wall tiling – mockup completed, floor tiling – mockup completed
  • Electrical, Plumbing & Firefighting works – electrical works – level 2 to level 17 – 90% completed, concealed plumbing works – level 3 – level 9 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed, vertical lines up to level 10 completed
  • External Finishes – External plastering – south side completed, west side completed, East side completed, North side & light well area 10% completed, External painting – south side 2 coat damp proof and primer completed, west side – damp proof completed, primer work on progress

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed.
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes External Plastering – 100% Completed, External Painting-75% Completed.
  • Interior work – Interior ceiling work – 50% completed, wood work – 50% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2023.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – sump tank of Tower A up to cover slab level wall casting to be completed
  • Internal Finishes – Waterproofing – Terrace level – 50% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed, Tiling – 1A,1B & 1C to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed, Electrical works lift machine room electrical work to be completed
  • External Finishes – External Plastering – Flat B & C rear side plastering 100% to be completed, Painting Works – 75% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 15 C,D to be completed, Level 11,12 & 13 flat E and F to be completed
  • Civil Works – Ceiling Plastering – level 5,6,7,8 & 9 (E & F) to be completed, block work for level 2,3,4 (E&F), 1 (A,B,C,D) to be completed, 5,6,7 (E &F) to be completed, Inside plastering – 3 (A,B,C & D) to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed
  • Civil Works Ceiling Plastering- level 17 – 100% to be completed, Masonry – block/brick – level 17th 100% to be completed

CLUB HOUSE

  • Internal Finishes – flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 70% to be completed, wood work – 70% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 12-08-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Earthwork and rock breaking – 70% completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed
  • Internal Finishes – Waterproofing- up to 17th level completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed except Bed 1 Toilet
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, External Painting – 60% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed,Stilt 1 – roof slab 90% completed,Podium slab pool area except STP area – 90% pool deck completed, Podium slab pool area over STP area completed, Level 1 to 14 – Type A, B, C & D flats completed, Level 5,6,7,8 Flat E & F completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7,8 (A,B,C,D) and 1 (E & F) Completed, Masonry – Block/brick – level 2,3,6 (A,B,C,D) Completed, level 4 Flat A,B,C completed, Level 4D, 7 A&B on progress

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-15th level – 100% completed, level 16 – 90% completed, Masonary/Block work – level 1 80% completed, 2nd – 13th level-100% completed, level 14th to 16th – 100% completed, level 17 – 65% completed, Inside Plastering- level 1 – 25% completed, 2nd – 12th level 100%, level 13 – 100% completed, level 14 – 45% completed
  • Internal Finishes – Door frame fixtures – (106 flats) 70% completed, putty and painting works – level 2 (75% completed), level 3 to level 10 (100% completed), level 11 – 100% completed, level 12 – 100% completed, Water proofing – (level 3,4,5,6,7,8,9,10,11,12 all toilets in bedrooms & balcony completed) 95% completed, terrace floor 55% completed, stair room slab and LMR slab completed, wall tiling – mockup completed, floor tiling – mockup completed
  • Electrical, Plumbing & Firefighting works – electrical works – level 2 to level 15 – 98% completed, concealed plumbing works – level 3 – level 9 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed, vertical lines up to level 10 completed
  • Internal Finishes – Door frame fixtures – (106 flats) 70% completed, putty and painting works – level 2 (75% completed), level 3 to level 10 (100% completed), level 11 – 100% completed, level 12 – 100% completed, Water proofing – (level 3,4,5,6,7,8,9,10,11,12 all toilets in bedrooms & balcony completed) 95% completed, terrace floor 55% completed, stair room slab and LMR slab completed, wall tiling – mockup completed, floor tiling – mockup completed
  • Electrical, Plumbing & Firefighting works – electrical works – level 2 to level 15 – 98% completed, concealed plumbing works – level 3 – level 9 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed, vertical lines up to level 10 completed
  • External Finishes – External plastering – south side completed, west side completed, East side up to level 8 completed, External painting – south side 2 coat damp proof and primer completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed.
  • Electrical, Plumbing & Firefighting works Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes External Plastering – 100% Completed, External Painting-75% Completed.
  • Interior work – Interior ceiling work – 50% completed, wood work – 25% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of AUGUST 2023.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Retaining wall 15 mtr, sump tank of Tower A up to coverslab level wall casting to be completed
  • Internal Finishes – Waterproofing – 17th level 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed, Electrical works – Passenger lift and lift machine room electrical work to be completed
  • External Finishes – External Plastering – Flat B & C rear side plastering 100% to be completed, Painting Works – 70% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 15 A,B,C,D to be completed, Level 9,10 & 11 flat E and F to be completed
  • Civil Works – Ceiling Plastering – level 2 & 3 E & F and 9 A,B,C,D to be completed, block work for level 4,5 & 7 A,B,C,D to be completed, 2E to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed
  • Civil Works Ceiling Plastering- level 16 – 100% to be completed,Masonry – block/brick – level 17th 100% to be completed

CLUB HOUSE

  • Internal Finishes – flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 70% to be completed, wood work – 40% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 12-07-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – completed, all slab completed – (98% of overall completed), Treated water tank of Tank A & B completed
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed, Passenger lift 2Nos: completed
  • Internal Finishes – Waterproofing- up to 16th level completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed except Bed 1 Toilet
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion, M bed side, fire stair side completed, External Painting – 55% completed (putty and primer)

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Roof slab podium – 80% completed, Podium slab pool area except STP area – wall of pool deck completed, Level 1 to 13 – Type A, B, C & D flats completed, Level 5,6,7 Flat E & F completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7,8 (A,B,C,D) Completed, Masonry – Block/brick – level 2,3,6 (A ,B,C,D) Completed, level 4 Flat A,B,C completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-15th level – 100% completed, level 16 – 90% completed, Masonary/Block work – level 1 35% completed, 2nd – 13th level-100% completed, level 14th to 16th – 90% completed, level 17 – 45% completed, Inside Plastering- level 1 – 25% completed, 2nd – 12th level 100%, level 13 – 100% completed, level 14 – 35% completed
  • Internal Finishes – Door frame fixtures – (106 flats) 70% completed, putty and painting works – level 2 (75% completed), level 3 to level 10 (100% completed), level 11 – 100% completed, level 12 – 75% completed, Water proofing – (level 3,4,5,6,7,8,9,10,11,12 all toilets in bedrooms & balcony completed) 95% completed, terrace floor 25% completed, stair room slab and LMR slab completed, wall tiling – mockup completed, floor tiling – mockup completed
  • Electrical, Plumbing & Firefighting works – electrical works – level 2 to level 15 – 98% completed, concealed plumbing works – level 3 – level 9 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed, vertical lines up to level 10 completed
  • External Finishes – External plastering – south side completed, west side 95% completed, External painting – south side 2 coat damp proof completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.
  • Interior work – Interior ceiling work – 50% completed, wood work – 25% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JULY 2023.

ARTECH LIFE SPACES (TOWER A)

  • Internal Finishes – Waterproofing – 17th level 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 9th sunken floor and concealed work to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed, Electrical works – Passenger lift and lift machine room electrical work to be completed
  • External Finishes – External Plastering – Flat A,B inside parapet wall plastering, p3 columns plastering, Painting Works – 65% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Swimming pool deck level wall and slab to be completed, podium slab pool area over STP area- concrete with pool deck wall to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 14 A,B,C,D to be completed, Level 8, 9 & 10 flat E and F to be completed
  • Civil Works – Ceiling Plastering – level 1,2 & 3 E & F to be completed, block work for level 4,5 & 7 A,B,C,D to be completed, 2E to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed
  • Civil Works – Ceiling Plastering- level 16 – 100% to be completed,Masonry – block/brick – level 14th – 16th 100% to be completed, level 17 – 50% to be completed

CLUB HOUSE

  • Internal Finishes – flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 70% to be completed, wood work – 40% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 06-06-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works- Footings – completed, all slab completed – (98% of overall completed)
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed except client change apartments, Passenger lift 2Nos: completed
  • Internal Finishes – Waterproofing- up to 15th level completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed except Bed 1 Toilet
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th sunken floor work completed, concealed work of toilets – up to 8th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift, one passenger lift well electrical work completed, fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side plastering completed, B flat front portion, C flat front portion completed, External Painting – 35% completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 95% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Roof slab podium – 80% completed, Level 1 to 13 – Type A, B, C & D flats completed, Level 3,4 Flat E & F completed, STP – walls and base slab completed, cover slab – 95% completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7 (A,B,C,D) Completed, Masonry – Block/brick – level 2,3,6 (A ,B,C,D) Completed, level 4 Flat A,B,C completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 85% completed, slab completed – up to 18th level (roof slab – terrace) – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-15th level – 100% completed, level 16 – 90% completed, Masonary/Block work – level 1 35% completed, 2nd – 13th level-100% completed, level 14th to 16th – 75% completed, level 17 – 45% completed, Inside Plastering- level 1 – 25% completed, 2nd – 12th level 100%, level 13 – 100% completed, level 14 – 35% completed
  • Internal Finishes – Door frame fixtures – (100 flats) 70% completed, putty and painting works – level 2 (75% completed), level 3 to level 10 (100% completed), level 11 – 90% completed, level 12 – 35% completed, Water proofing – (level 3,4,5,6,7,8,9,10,11,12 all toilets in bedrooms & balcony completed) 95% completed, terrace floor – stair room slab and LMR slab completed, wall tiling – mockup completed, floor tiling – mockup completed
  • Electrical, Plumbing & Firefighting works – electrical works – level 2 to level 15 – 98% completed, concealed plumbing works – level 3 – level 8 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed, vertical lines up to level 10 completed
  • External Finishes – External plastering – Flat B and C balcony area plastering completed, South side – Flat H completed, Flat A and staircase side completed, Flat A west side completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.
  • Interior work – Interior ceiling work – 50% completed, wood work – 25% completed
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2023.

ARTECH LIFE SPACES (TOWER A)

  • Internal Finishes – Waterproofing – 16th level 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 11th piping to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed, Electrical works – Passenger lift and lift machine room electrical work to be completed
  • External Finishes – External Plastering – Flat A,B side design work plastering, fire stair outside etc to be completed, Painting Works – 55% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Raft slab – 100% to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 14 A,B,C,D to be completed, Level 5,6 & 7 flat E and F to be completed
  • Civil Works – Ceiling Plastering – level 8th,9th level to be completed, block work for level 5,7 to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Basement slab @ 101.35 – 70% to be completed & 104.35 – 90% to be completed
  • Civil Works – Ceiling Plastering- level 16 – 100% to be completed,Masonry – block/brick – level 14th – 16th 100% to be completed, level 17 – 50% to be completed

CLUB HOUSE

  • Internal Finishes – flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Interior work – Interior ceiling work – 70% to be completed, wood work – 40% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

 

Work status as on 05-05-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER-D)

  • Structural Works- All sub-structural and structural works-100% completed
  • Civil Works – Ceiling plastering and wall plastering – 100 % completed, Masonry – Block/ brick- 100 % completed, Internal plaster – 100 % completed
  • Internal Finishes – Main door – 100% completed, Waterproofing- 100% completed, Wall Tiling Work – 99% completed, Flooring – 99% completed, Putty works & Painting – 91% completed, Door frame fixtures – 100% completed, Handrails – 100% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 100% completed, Corridor handrail works – 100% completed, Wall and floor services, Risers – 100% completed, Centralised Gas piping system – 95% completed
  • Final Finishes – Door shutters – 100% completed, Final Painting – 90% completed, CP & Sanitaryware – (82 flats) 60% completed, Electrical final fixtures – 88% completed, Fire fighting final fixtures – 100% completed
  • External Finishes – Windows & Sliding doors – 98% completed, External Plastering – 100% completed, External Painting – 92% completed, Louvers/façade/wall cladding – 96% completed
  • Yard Work – External Infrastructure & MEP services & connections – 96% completed
  • Landscape – Hardscape – 95% completed, Landscape area – 95% completed
  • Mockup – Completed.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – 100 % completed, all slab completed – (98% of overall completed), RCC of treated water tank cover slab, Fire and drinking water tank wall and cover slab, Main stair cover slab and beams, terrace parapet 100% completed , rear side RCC retaining wall (35m) completed, Tower B Sump base slab completed.
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed except client change apartments, Passenger lift 1No: completed
  • Internal Finishes – Waterproofing- up to 14th level completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed, Tiling – Mockup completed except Bed 1 Toilet
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th flats sunken floor work completed, concealed work of toilets – up to 7th floor completed, Electrical work – box fixing & piping upto 17th level completed, Service lift well electrical work completed, fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side palstering completed, External Painting – 15% completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 90% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Roof slab podium – 80% completed, Level 1 to 12 – Type A, B, C & D flats completed, Level 13 Flat A & B completed, Level 2 Flat E & F completed, STP – walls and base slab completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7 (A,B,C,D) Completed, Masonry – Block/brick – level 2,3,6 (A ,B,C,D) Completed, level 4 Flat A,B,C completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 75% completed, sub structural works – 75% completed, slab completed – up to 17th level 100% Completed, 18th level (roof slab – terrace) – completed, Stair case roof slab, LMR base slab, Water Tank base slab – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-15th level, level 16 – 90% completed, Masonary/Block work – level 1 35% completed, 2nd – 13th level-100% completed, level 14th to 16th – 75% completed, level 17 – 45% completed, Inside Plastering- level 1 – 25% completed, 2nd – 12th level 100%, level 13 – 90% completed, level 14 – 20% completed
  • Internal Finishes – Door frame fixtures – (100 flats) 70% completed, putty and painting works – level 2 (75% completed), level 3 to level 10 (100% completed), level 11 – 90% completed, level 12 – 10% completed, Water proofing – (level 3,4,5,6,7,8,9,10,11,12 all toilets in bedrooms & balcony completed) 95% completed, wall tiling – mockup completed, floor tiling – mockup completed
  • Electrical, Plumbing & Firefighting works – electrical works – level 2 to level 15 – 98% completed, concealed plumbing works – level 3 – level 8 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed
  • External Finishes – External plastering – Flat B and C balcony area plastering done from level 12 to level 1 completed, South side – (Flat H, level 1 to 17), Flat A and staircase side – level 18 – level 5 completed, Flat A west side level 17 to level 11 completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2023.

ARTECH LIFE SPACES (TOWER-D)

  • Internal Finishes – Wall Tiling – 100% to be completed, flooring – 100% to be completed, Putty works and painting – 95% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised Gas piping system – 97% to be completed.
  • Final Finishes – Final Painting – 94% to be completed, CP and Sanitary ware – 65% to be completed, Electrical final fixtures – 100% to be completed
  • External Finishes – Windows & Sliding doors – 100% to be completed, External Painting – 96% to be completed, Louvers/façade/wall cladding – 98% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 98% to be completed
  • Landscape – Hardscape – 100% to be completed, Specialist works in landscape area – 100% to be completed

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Tower B – sump walls, retaining wall 10m, treated water tank A & B Sump to be completed
  • Internal Finishes – Waterproofing – 15th level (A,B,C,D) 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 11th piping to be completed, Fire fighting Work piping work – 10th level piping, duct piping work 1st to 10th 100% to be completed, Electrical works – Passenger lift and lift machine room electrical work to be completed
  • External Finishes – External Plastering – A Flat rear side 7th to 1st level, B Flat side area parapet to 1st level 100% to be completed, Painting Works – 30% to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – STP cover slab to be completed, Raft slab – 100% to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1, level 13 – C,D to be completed, Level 3, 4 Flat E & F to be completed, level 14 Flat A & B to be completed
  • Civil Works – Ceiling Plastering – level 8th,9th level to be completed, block work for level 5,7 to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Basement slab @ 101.35 – 70% to be completed & 104.35 – 80% to be completed, sub structural works – 80% to be completed
  • Civil Works – Ceiling Plastering- level 16 – 100% to be completed,Masonry – block/brick – level 14th – 16th 100% to be completed, level 17 – 50% to be completed, Inside plastering – level 13th – 100% to be completed.

CLUB HOUSE

  • Internal Finishes – flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes – External Painting – 90% to be Completed.
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Work status as on 08-04-2023, we have completed the following.

ARTECH LIFE SPACES (TOWER-D)

  • Structural Works- All sub-structural and structural works-100% completed
  • Civil Works – Ceiling plastering and wall plastering – 100 % completed, Masonry – Block/ brick- 100 % completed, Internal plaster – 100 % completed
  • Internal Finishes – Main door – 100% completed, Waterproofing- 100% completed, Wall Tiling Work – 99% completed, Flooring – 99% completed, Putty works & Painting – 91% completed, Door frame fixtures – 100% completed, Handrails – 100% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 100% completed, Corridor handrail works – 100% completed, Wall and floor services, Risers – 100% completed, Centralised Gas piping system – 95% completed
  • Final Finishes – Door shutters – 100% completed, Final Painting – 90% completed, CP & Sanitaryware – (82 flats) 60% completed, Electrical final fixtures – 88% completed, Fire fighting final fixtures – 100% completed
  • External Finishes – Windows & Sliding doors – 98% completed, External Plastering – 100% completed, External Painting – 92% completed, Louvers/façade/wall cladding – 96% completed
  • Yard Work – External Infrastructure & MEP services & connections – 96% completed
  • Landscape – Hardscape – 95% completed, Landscape area – 95% completed
  • Mockup – Completed.

ARTECH LIFE SPACES (TOWER A)

  • Structural Works – Footings – 100 % completed, all slab completed – (98% of overall completed), RCC of treated water tank cover slab, Fire and drinking water tank wall and cover slab, Main stair cover slab and beams, terrace parapet 100% completed , rear side RCC retaining wall (35m) completed.
  • Civil Works – Ceiling plastering – stilt 1 level 100% ceiling plastering completed, Masonry – Block/ brick- up to 16th level completed, P1, P2 Passage brick work completed, Brick work – 17th floor Completed, Internal plastering – ceiling and wall – up to 17th level completed except client change apartments.
  • Internal Finishes – Waterproofing- up to 14th level completed, Painting and putty work – putty and primer – up to 14th level A,B,C,D flats completed,15 th level B,C,D Flats, 16th level B,C,D flats completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 8th flats sunken floor work completed, concealed work of toilets – up to 6th floor completed, Electrical work – box fixing & piping upto 17th level completed, fire fighting piping work up to 9th level completed.
  • External Finishes – A & D front area external plastering completed, Service lift rear side external plastering completed, A flat rear side m bed external plastering completed, D Flat rear side palstering completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – Footings – 95 nos completed out of 95 including lift, Raft slab completed – 90% completed, Roof slab – Stilt 2 level roof slab 90 % completed, Stilt 1 – roof slab 90% completed, Roof slab podium – 80% completed, Level 1 to 12 – Type A, B, C & D flats completed
  • Civil Works – Ceiling Plastering – level 1,2,3,4,5,6,7 (A,B,C,D) Completed, Masonry – Block/brick – level 2 (A ,B,C,D) Completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Footings – 122 nos: completed out of 136 nos:, Basement slab @ 101.35 – 65% completed & Basement slab @ 104.35 – 75% completed, sub structural works – 75% completed, slab completed – up to 17th level 100% Completed, 18th level (roof slab – terrace) – completed, Stair case roof slab, LMR base slab, Water Tank base slab – completed
  • Civil Works – Ceiling Plastering – basement ceiling – 80% completed, level 1 25% completed, 2nd-15th level, level 16 – 90% completed, Masonary/Block work-level 1 35% completed, 2nd – 13th level-100% completed, level 14th to 16th – 75% completed, level 17 – 25% completed, Inside Plastering- level 1 – 25% completed, 2nd – 12th level 100%, level 13 – 65% completed
  • Internal Finishes – Door frame fixtures – (94 flats) 70% completed, putty and painting works – level 2 (75% completed), level 3 to level 10 (100% completed), level 11 – 65% completed, Water proofing – (level 3,4,5,6,7 & 8 all toilets in bedrooms & balcony completed) 95% completed
  • Electrical, Plumbing & Firefighting works – (electrical works – level 2 to level 13 – 98% completed), concealed plumbing works – level 3 – level 8 (80% completed), fire fighting work @ level 3 to level 10 fittings and pipe installation completed
  • External Finishes – External plastering – Flat B and C balcony area plastering done from level 12 to level 1 completed, South side – (Flat H, level 1 to 17), Flat A and staircase side – level 18 – level 5 completed

CLUB HOUSE

  • Structural Works – All sub-structural and structural works-completed
  • Civil Works – Ceiling plastering and wall Plastering- 100% Completed, Masonry – Block/ brick-100% Completed.
  • Internal Finishes – Waterproofing – 100% Completed, flooring – 80% completed, wall tiling – 80% completed, putty works & Painting- 90% Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works- 90% Completed, wall and floor risers – 50% completed.
  • Final Finishes – Fire fighting final fixtures – 75% completed
  • External Finishes – External Plastering – 100% Completed, External Painting-75% Completed.
  • Yard Work – External Infrastructure & MEP services & connections – 20% completed

As per the current work status from our site, we are targeted to complete the following works by the end of APRIL 2023.

ARTECH LIFE SPACES (TOWER-D)

  • Internal Finishes – Wall Tiling – 100% to be completed, flooring – 100% to be completed, Putty works and painting – 95% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised Gas piping system – 97% to be completed.
  • Final Finishes – Final Painting – 94% to be completed, CP and Sanitary ware – 65% to be completed, Electrical final fixtures – 100% to be completed
  • External Finishes – Windows & Sliding doors – 100% to be completed, External Painting – 96% to be completed, Louvers/façade/wall cladding – 98% to be completed
  • Yard Work – External Infrastructure & MEP services & connections – 98% to be completed
  • Landscape – Hardscape – 100% to be completed, Specialist works in landscape area – 100% to be completed

ARTECH LIFE SPACES (TOWER A)

  • Civil Works – Passenger lift inside plastering – 1 No: 100% to be completed
  • Internal Finishes – Waterproofing – 15th level (A,B,C,D) 100% to be completed, Painting Works – balcony inside putty, primer work 100% to be completed
  • Electrical, Plumbing & Firefighting works – Plumbing works – level 11th piping to be completed, Fire fighting Work piping work – duct piping work 1st to 10th 100% to be completed
  • External Finishes – External Plastering – A Flat rear side 7th to 1st level, A Flat left side area parapet to 1st level 100% to be completed, Painting Works – A & D flats external putty, primer etc to be completed

ARTECH LIFE SPACES (TOWER B)

  • Structural Works – STP cover slab to be completed, Raft slab – 100% to be completed, Roof slab – 100 % to be completed in stilt level 2, Roof slab – 100 % to be completed in stilt 1,level 13 – A,B,C,D to be completed, Level 2,3 E & F to be completed
  • Civil Works – Ceiling Plastering – level 8th,9th level to be completed, block work for level 3,4,5,7 (A,B,C,D) to be completed

ARTECH LIFE SPACES (TOWER C)

  • Structural Works – Basement slab @ 101.35 – 70% to be completed & 104.35 – 80% to be completed, sub structural works – 80% to be completed
  • Civil Works – Ceiling Plastering- level 16 – 100% to be completed,Masonry – block/brick – level 14th – 16th 100% to be completed, Inside plastering – level 13th – 100% to be completed.

CLUB HOUSE

  • Internal Finishes – flooring – 100% to be completed, wall tiling – 90% to be completed, putty works & Painting- 95% to be Completed.
  • Electrical, Plumbing & Firefighting works – Concealed Plumbing works -100% Completed, wall and floor risers – 75% to be completed.
  • Final Finishes – Fire fighting final fixtures – 100% to be completed
  • External Finishes –
  • Yard Work – External Infrastructure & MEP services & connections – 35% to be completed

Click here to see the previous work progress updates.

Are you on the lookout for a home loan? We can help you. We have tie-ups with prominent banks for this project. It will help you make the loan application process easier.

Flats for Sale near Technopark

Technopark, Trivandrum’s rapidly-expanding IT hub is located along the newly constructed NH66, with the stretch between Kazhakoottam and Eanchakkal being known as the ‘New Trivandrum’. The best part is that every facility is within a few breezy minutes’ drive away here, including the international airport, world-class malls, super-specialty hospitals, prestigious educational institutions, the city center as well as the city’s beautiful beaches!

This could be one reason why flats near Infosys, Trivandrum, are always in high demand, after all who wouldn’t want to live where all facilities are so close to their doorstep. Being aware of this major attraction, leading builders like Artech Realtors have come up with a delightful project featuring luxury apartments near Infosys, Trivandrum fittingly named ‘Artech Life Spaces’. Located opposite the Opposite Infosys campus, these luxury apartments in Trivandrum feature uber-luxurious amenities like no other! Here you will find amazing amenities like separate his-and-hers jacuzzi and sauna facilities, beauty salon, guest suites, numerous gaming and fitness facilities, adult and kid’s swimming pools, a skating rink, a butterfly garden and even a lily pond/reflective pool!

And for those looking for 2, 3 or 4 BHK luxury flats near Infosys, Trivandrum, rest assured that Artech Life Spaces goes above and beyond this, as it also offers an additional 2+ study variant too, that is ideal for those with growing kids, or for those following the work from home trend. And for those looking actively for flats for sale near Infosys, Trivandrum, the Artech Life Spaces make the ultimate lifestyle destination homes!

RELATED PROJECTS

DISCLAIMER

The information provided on this website is meant for general guidance. Though we have taken utmost care on the accuracy of the contents, the customer should make an autonomous assessment of the contents. However, the prospective buyers should rely upon the terms and conditions of the sale and construction agreement between the Builder and the Client.

The visuals of the projects symbolize artistic impression only. The information contained herein including the fittings, finishes, features, floor size and color etc. in the visuals are subject to change. However, the plans & specifications indicated in the Builder and Client agreements are final and we have not authorized anyone to make any oral commitments or promises on our behalf in regard to the plans and specifications of the apartments/projects.

For any clarification please feel free to call +91 9847 600 600 or walk into our offices. Our representatives will always be at your service.