ArtechRainforest

3 BHK Flats in Trivandrum , 4 BHK Flats in Trivandrum , Builders in Trivandrum , Luxury apartments in trivandrum , Ongoing , Residential , Trivandrum
Jawahar Nagar | Trivandrum

RERA Number: K-RERA/PRJ/270/2020

}

Project Description

Rainforest a joint venture between Artech & B’ Canti is Kerala’s Greenest Apartment Complex and a project that is nothing like what you have seen before. With 78 ultra-luxurious Apartments, Rainforest is set in one of Trivandrum’s most prestigious locations – Jawahar Nagar, where the ‘crème de la crème’ of the city reside. The unique aspects about Rainforest are the forest inspired ground floor landscape, the tree filled void spaces and the multi-level green community.

At the Rainforest, every apartment window opens onto green vistas.The complex offers 3 & 4 BHK Apartments in 25 different layout options, measuring 2000 sq.ft. to 3840 sq.ft. Some of the select amenities offered at the Rainforest are Health Club, Concierge Service, Guest Suites, Sauna, Spa, Rain water harvesting, Pool, Party Space and so much more to make living here a hearty & serene experience. In the Rainforest you are near to it all and yet so far!

QUICK
ENQUIRE

Take your first few steps towards finding the ultimate happiness of the Perfect Home.
  • Health Club
  • Sauna Bath/Steam bath
  • Swimming Pool
  • Association Hall
  • AV Room
  • Guest suite
  • Drivers Rest Room.
  • Party space
  • Children’s Play Area
  • WIFI Lobby
  • Spa
  • Indoor Games Room
  • Video Door Phone
  • F.T.T.H
  • Rain Water Harvesting
  • Reticulated Gas System
  • Incinerator

Work status as on 12-12-2024, we have completed the following.

  • Civil Works – Ceiling and wall plastering 85% completed,MASONRY WORKS, Block/ brick- Basement 1 floor 100% completed, Basement 2 floor – 100% completed,Ground floor – completed, Party area toilet block work – 100% completed Swmimming pool area toilet & pump room block work 100% completed,Block work for seater in GF landscape area – 100% completed ,GF duct brick work – completed, Inside plastering – Basement 2 inside wall plastering completed,Water tank plastering completed,Party area toilet plastering 100% completed, Swimming pool area toilet plastering – 100% completed 16th Terrace protection plastering 100% completed,Protection plastering GF yard area- 100% Protection plastering Holding tank- 100%,compound wall plastering-25%
  • Internal Finishes – Main door – 82 apartments completed,Waterproofing -100% completed,Wall tiling – 81 apartments completed,Flooring – 81 apartments completed ,B1 parking tile – 70% completed ,Putty works – 100% completed ,Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed ,Main stair handrail – 60% completed, Balcony handrails – 90% completed,Parapet GI railing – 100% completed Sliding Doors and Windows -85% completed B2 Parking Tiles: 75% completed TERRACE TILING :90% completed GF Landscape Area Granite Fixing 80% completed
  • Electrical, Plumbing ; Firefighting works- Concealed plumbing works – 82 nos. completed,Centralised gas piping system – 81 apartments completed, Fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, gym, association hall, lobby – 100% completed Electrical LT work – wire pulling – 90% completed, GF landscape area – 90% completed, HT work – 72 apartments completed, HVAC work – 32 apartments, lobby, games room, gym completed
  • Final Finishes Final Painting 1st coat – 38 Apartments, Final Painting 2nd coat – 5 Apartments Plumbing & Sanitaryware- 8 Apartments,Electrical final fixtures- 8 apartments, Firefighting final fixtures-8 apartments ,AV room -100% , Lobby,games room ,Gym glass work -100% ,Main Door Lock Fixing – 62 Nos
  • External Finishes- Windows and sliding doors – 80% completed Duct door – 90% completed External plastering – B2 & B1 floor – 95% completed, External painting – 40% completed ,Texture painting GF – 100% completed Passage SD 90% completed
  • Yard Work – Fire fighting work yard area – 95% completed
  • Landscape Work- Landscape work – 50% completed, civil work – 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2024.

  • Civil works -Compound wall plastering-70%
  • Internal Finishes Wall tiling- 1 apartment LFlooring -1 aparments, Apartment Balcony handrail- 100% ,Common Area balcony handrail-100% ,Terrace tiling -100% ,G floor landscape area granite fixing- 100% , SWIMMING POOL TILE WORK-100%
  • Electrical, Plumbing & Firefighting works- Elecctrical LT work- landscape area ground floor -100%, HVAC WORK – 2 apartments
  • Final Finishes – Final Painting 1st coat – 40 Apartments ,Final Painting 2ND coat – 7 Apartments, Plumbing & Sanitaryware- 10 Apartments
    Electrical final fixtures-10 Apartments, Firefighting final fixtures- 10 Apartments , Main Door Lock Fixing – 80 NOS
  • External Finishes- Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – 100% to be completed,
  • Yard Work – Fire fighting work yard area – 100% to be completed
  • Landscape Work- Landscape work – 70% to be completed

Work status as on 08-11-2024, we have completed the following.

  • Internal Finishes Main door – 82 apartments completed,Waterproofing – terrace – 95% completed, GF landscape area – 95% completed,Wall tiling – 81 apartments completed Flooring – 81 apartments completed ,B1 parking tile – 70% completed ,Putty works – 100% completed ,Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed ,Main stair handrail – 60% completed, Balcony handrails – 90% completed,Parapet GI railing – 100% completed Sliding Doors and Windows -85% completed B2 Parking Tiles: 60% completed TERRACE TILING :75% completed
  • GF Landscape Area Granite Fixing 75% completed
  • Electrical, Plumbing & Firefighting works Concealed plumbing works – 82 nos. completed,Centralised gas piping system – 74 apartments completed, Fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, gym, association hall, lobby – 100% completed Electrical LT work – wire pulling – 82 apartments completed, GF landscape area – 90% completed, HT work – 72 apartments completed, HVAC work – 32 apartments, lobby, games room, gym completed
  • Final Finishes Door shutters & ironmongery – 6 apartments completed , Plumbing and Sanitarywares – 8 apartments completed,Electrical final fixtures – 8 apartments completed ,Fire final fixtures – 8 apartments completed ,Lobby and games room – 80% completed, Final painting – 38 Apartments completed Solar Panel completed AV Room completed
  • External Finishes Windows and sliding doors – 80% completed Duct door – 75% completed External plastering – B2 & B1 floor – 95% completed, External painting – 40% completed ,Texture painting GF – 100% completed Passage SD 70% completed
  • Yard Work Fire fighting work yard area – 85% completed
  • Landscape Work Landscape work – 50% completed, civil work – 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2024.

  • Internal Finishes Waterproofing – terrace 100% to be completed, GF landscape area 100% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 90% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 100% to be completed, Main stair handrail – 100% to be completedSliding Doors and Windows -90% to be completed B2 Parking Tiles: 100% to be completed TERRACE TILING :75% to be completed
  • Electrical, Plumbing & Firefighting works Centralised gas piping system – 80 apartments to be completed, Electrical LT work – GF lndscape area 100% to be completed, HVAC work – association hall,2 apartments to be completed
  • Final Finishes Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – 100% to be completed,
  • Yard Work Fire fighting work yard area – 85% to be completed
  • Landscape Work Landscape work – 70% to be completed

Work status as on 14-10-2024, we have completed the following.

  • Civil Works- Ceiling and wall plastering 85% completed,MASONRY WORKS, Block/ brick- Basement 1 floor 100% completed, Basement 2 floor – 100% completed,Ground floor – completed, Party area toilet block work – 100% completed Swmimming pool area toilet & pump room block work 100% completed,Block work for seater in GF landscape area – 100% completed ,GF duct brick work – completed.Inside plastering – Basement 2 inside wall plastering completed,Water tank plastering completed,Party area toilet plastering 100% completed, Swimming pool area toilet plastering – 100% completed 16th Terrace protection plastering 100% completed
  • Main door – 82 apartments completed,Waterproofing – terrace – 95% completed, GF landscape area – 95% completed,Wall tiling – 80 apartments completed Flooring – 80 apartments completed ,B1 parking tile – 70% completed ,Putty works – 100% completed ,Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed ,Main stair handrail – 60% completed, Balcony handrails – 90% completed,Parapet GI railing – 100% completed Sliding Doors and Windows -85% completed B2 Parking Tiles: 60% completed TERRACE TILING :45% completed
  • Electrical, Plumbing & Firefighting works-Concealed plumbing works – 82 nos. completed,Centralised gas piping system – 74 apartments completed, Fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, gym, association hall, lobby – 100% completedElectrical LT work – wire pulling – 82 apartments completed, GF landscape area – 90% completed, HT work – 72 apartments completed, HVAC work – 30 apartments, lobby, games room, gym completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed , Plumbing and Sanitarywares – sample flat, 6G, 2D,10B,3G completed,Electrical final fixtures – sample flat, 6G, 2D,10B,3G completed,Fire final fixtures – sample flat, 6G,10B,3G completed ,Lobby and games room – 35% completed, Final painting – 36Apartments completed Solar Panel 70% completed
  • External Finishes- Windows and sliding doors – 80% completed Duct door – 75% completed External plastering – B2 & B1 floor – 95% completed, External painting – Primer 100% completed,Emulsion – 40% completed ,Texture painting GF – 100% completed Passage SD 70% completed
  • Yard Work – Fire fighting work yard area – 80% completed
  • Landscape Work- Landscape work – 50% completed, civil work – 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2024.

  • Civil Works- Final Painting 1st coat – 38 APARTMENTS ,Plumbing and Sanitaryware- 10E,7A,Electrical final fixtures-10E,7A
    Firefighting final fixtures- 10E,7A ,Solar panel -100% to be completed
  • Internal Finishes- Waterproofing – terrace 100% to be completed, GF landscape area 100% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 90% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 100% to be completed, Main stair handrail – 100% to be completedSliding Doors and Windows -90% to be completed B2 Parking Tiles: 100% to be completed TERRACE TILING :75% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised gas piping system – 80 apartments to be completed, Electrical LT work – GF lndscape area 100% to be completed, HVAC work – association hall,2 apartments to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes – Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – 100% to be completed
  • Yard Work – Fire fighting work yard area – 85% to be completed
  • Landscape Work – Landscape work – 70% to be completed

Work status as on 12-09-2024, we have completed the following.

  • Internal Finishes – Main door – 82 apartments completed,Waterproofing – terrace – 95% completed, GF landscape area – 95% completed,Wall tiling – 79 apartments completed,Flooring – 79 apartments completed ,B1 parking tile – 70% completed ,Putty works – 100% completed ,Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed ,Main stair handrail – 60% completed, Balcony handrails – 85% completed,Parapet GI railing – 100% completed
  • Electrical, Plumbing & Firefighting works-Concealed plumbing works – 81 nos. completed,Centralised gas piping system – 74 apartments completed, Fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, gym, association hall, lobby – 100% completedElectrical LT work – wire pulling – 82 apartments completed, GF landscape area – 75% completed, HT work – 72 apartments completed, HVAC work – 28 apartments, lobby, games room, gym completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed , Plumbing and Sanitarywares – sample flat, 6G, 2D,10B,3G completed,Electrical final fixtures – sample flat, 6G, 2D,10B,3G completed,Fire final fixtures – sample flat, 6G,10B,3G completed ,Lobby and games room – 35% completed, Final painting – 34 Apartments completed
  • External Finishes- Windows and sliding doors – 80% completed Duct door – 75% completed External plastering – B2 & B1 floor – 95% completed, External painting – Primer 100% completed,Emulsion – 30% completed ,Texture painting GF – 100% completed
  • Yard Work -Fire fighting work yard area – 80% completed
  • Landscape Work – Landscape work – 40% completed, civil work – 100% completed
  • Completed.

As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2024.

  • Internal Finishes- Waterproofing – terrace 100% to be completed, GF landscape area 100% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 90% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 100% to be completed, Main stair handrail – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised gas piping system – 80 apartments to be completed, Electrical LT work – GF lndscape area 100% to be completed, HVAC work – association hall,2 apartments to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes – Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – 100% to be completed
  • Yard Work – Fire fighting work yard area – 85% to be completed
  • Landscape Work – Landscape work – 70% to be completed

Work status as on 13-08-2024, we have completed the following.

  • Civil Works- Ceiling and wall plastering 85% completed,MASONRY WORKS ,Block/ brick- Basement 1 floor 100% completed,Basement 2 floor – 100% completed,Ground floor – completed, Party area toilet block work – 100% completed Swmimming pool area toilet & pump room block work 100% completed, Block work for seater in GF landscape area – 100% completed,GF duct brick work – completed,Inside plastering – Basement 2 inside wall plastering completed,Water tank plastering completed ,Party area toilet plastering 100% completed,Swimming pool area toilet plastering – 100% completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 90% completed, GF landscape area – 95% completed,Wall tiling – 78 apartments completed,Flooring – 78 apartments completed,B1 parking tile – 70% completed,Putty works – 100% completed,Door frame fixtures- 100% completed,Handrails – fire stair handrail – 100% Completed,Main stair handrail – 60% completed,Balcony handrails – 85% completed Parapet GI railing – 100% completed
  • Electrical, Plumbing & Firefighting works-Concealed plumbing works – 81 nos. completed,Centralised gas piping system – 74 apartments completed,Fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, gym, association hall, lobby – 100% completed, Electrical LT work – wire pulling – 82 apartments completed, GF landscape area – 75% completed, HT work – 72 apartments completed, HVAC work – 27 apartments, lobby, games room, gym completed.
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed,Plumbing and Sanitarywares – sample flat, 6G, 2D,10B completed,Electrical final fixtures – sample flat, 6G, 2D,10B completed,Fire final fixtures – sample flat, 6G,10B completed,Lobby and games room – 35% completed,Final painting – 32 Apartments completed
  • External Finishes- Windows and sliding doors – 80% completed,Duct door – 75% completed,External plastering – B2 & B1 floor – 95% completed,External painting – Primer 95% completed,Emulsion – 20% completed,Texture painting GF – 90% completed
  • Yard Work – Fire fighting work yard area – 70% completed
  • Landscape Work -Landscape work – 15% completed, civil work – 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of AUGUST 2024.

  • Civil Works – Ceiling and wall plastering – 100% to be completed
  • Internal Finishes- Waterproofing – terrace 100% to be completed, GF landscape area 100% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 90% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 100% to be completed, Main stair handrail – 100% to be completed
  • Electrical, Plumbing & Firefighting works -Centralised gas piping system – 80 apartments to be completed, Electrical LT work – GF lndscape area 100% to be completed, HVAC work – association hall to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes – Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – primer 100% to be completed, texture painting GF – 100% to be completed
  • Yard Work – Fire fighting work yard area – 85% to be completed
  • Landscape Work – Landscape work – 20% to be completed

Work status as on 09-07-2024, we have completed the following.

  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 90% completed, GF landscape area – 95% completed, wall tiling – 78 apartments completed, flooring – 78 apartments completed, B1 parking tile – 70% completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 80% completed, parapet GI railing – 100% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 81 nos: completed, Centralised gas piping system – 74 apartments completed, fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, gym, association hall, lobby – 100% completed, Electrical LT work – wire pulling – 82 apartments completed, GF landscape area – 50% completed, HT work – 72 apartments completed, HVAC work – 27 apartments, lobby, games room, gym completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed, Plumbing and Sanitarywares – sample flat, 6G, 2D,10B completed, Electrical final fixtures – sample flat, 6G, 2D,10B completed, fire final fixtures – sample flat, 6G,10B completed, lobby and games room – 35% completed, final painting – 24 Apartments completed
  • External Finishes – Windows and sliding doors – 80% completed, duct door – 75% completed, External plastering – B2 & B1 floor – 90% completed, External painting – primer 95% completed, painting – 20% completed, texture painting GF – 90% completed
  • Yard Work – Fire fighting work yard area – 70% completed
  • Landscape Work – Landscape work – 15% completed, civil work – 100% completed
  • Mockup – Completed.

As per the current work status from our site, we are targeted to complete the following works by the end of JULY 2024.

  • Internal Finishes – Waterproofing – terrace 100% to be completed, GF landscape area 100% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 90% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 100% to be completed, Main stair handrail – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised gas piping system – 80 apartments to be completed, Electrical LT work – GF lndscape area 100% to be completed, HVAC work – association hall to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes – Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – primer 100% to be completed, texture painting GF – 100% to be completed
  • Yard Work – Fire fighting work yard area – 85% to be completed
  • Landscape Work – Landscape work – 20% to be completed

Work status as on 11-06-2024, we have completed the following.

  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 90% completed, GF landscape area – 95% completed, wall tiling – 77 apartments completed, flooring – 77 apartments completed, B1 parking tile – 60% completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 75% completed, parapet GI railing – 90% completed
  • Electrical, Plumbing & Firefighting works -Firefighting works Concealed plumbing works – 81 nos: completed, Centralised gas piping system – 74 apartments completed, fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, Electrical LT work – wire pulling – 82 apartments completed, HT work – 72 apartments completed, HVAC work – 24 apartments completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed, Plumbing and Sanitarywares – sample flat, 6G, 2D,10B completed, Electrical final fixtures – sample flat, 6G, 2D,10B completed, fire final fixtures – sample flat, 6G,10B completed, lobby and games room – 35% completed, final painting – 18 Apartments completed
  • External Finishes- Windows and sliding doors – 80% completed, duct door – 75% completed, External plastering – B2 & B1 floor – 90% completed, External painting – primer 95% completed, painting – 20% completed, texture painting GF – 75% completed
  • Yard Work – Fire fighting work yard area – 50% completed
  • Landscape Work -Landscape work – 10% completed, civil work – 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2024.

  • Internal Finishes – Waterproofing – terrace 100% to be completed, GF landscape area 100% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 90% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 80% to be completed, Main stair handrail – 100% to be completed, parapet GI railing – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised gas piping system – 80 apartments to be completed, Electrical LT work – wire pulling gym, association hall to be completed, HVAC work – lobby, gym, association hall to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes- Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – primer 100% to be completed, texture painting GF – 100% to be completed
  • Yard Work – Fire fighting work yard area – 70% to be completed
  • Landscape Work -Landscape work – 20% to be completed

Work status as on 09-04-2024, we have completed the following.

  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 90% completed, GF landscape area – 70% completed, wall tiling – 76 apartments completed, flooring – 76 apartments completed, B1 parking tile – 30% completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 75% completed, parapet GI railing – 85% completed
  • Electrical, Plumbing & Firefighting works Concealed plumbing works – 81 nos: completed, Centralised gas piping system – 58 apartments completed, fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, Electrical LT work – wire pulling – 80 apartments completed, HT work – 72 apartments completed, HVAC work – 21 apartments completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed, Plumbing and Sanitarywares – sample flat, 6G, 2D,10B completed, Electrical final fixtures – sample flat, 6G, 2D,10B completed, fire final fixtures – sample flat, 6G,10B completed, lobby and games room – 35% completed, final painting – 5 Apartments completed
  • External Finishes – Windows and sliding doors – 75% completed, duct door – 75% completed, External plastering – B2 & B1 floor – 90% completed, External painting – primer 95% completed, texture painting GF – 50% completed
  • Yard Work – Fire fighting work yard area – 20% completed
  • Landscape Work – Landscape work – 10% completed, civil work – 90% completed

As per the current work status from our site, we are targeted to complete the following works by the end of APRIL 2024.

  • Internal Finishes – Waterproofing – terrace 100% to be completed, GF landscape area 90% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 60% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 80% to be completed, Main stair handrail – 100% to be completed, parapet GI railing – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised gas piping system – 60 apartments to be completed, Electrical LT work – wire pulling 1 more apartments to be completed, HVAC work – 23 more apartments to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes Windows and sliding doors – 85% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – primer 100% to be completed, texture painting GF – 70% to be completed
  • Yard Work – Fire fighting work yard area – 50% to be completed
  • Landscape Work – Landscape work – 20% to be completed, Civil work – 100% to be completed

Work status as on 09-03-2024, we have completed the following.

  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 90% completed, GF landscape area – 70% completed, wall tiling – 75 apartments completed, flooring – 75 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 75% completed, parapet GI railing – 85% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 81 nos: completed, Centralised gas piping system – 58 apartments completed, fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 90% Completed, Electrical LT work – wire pulling – 80 apartments completed, HT work – 72 apartments completed, HVAC work – 21 apartments completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed, Plumbing and Sanitarywares – sample flat, 6G, 2D completed, Electrical final fixtures – sample flat, 6G, 2D completed, fire final fixtures – sample flat, 6G completed, lobby and games room – 35% completed.
  • External Finishes Windows and sliding doors – 75% completed, duct door – 75% completed, External plastering – B2 & B1 floor – 90% completed, External painting – primer 95% completed, texture painting GF – 25% completed
  • Landscape Work – Landscape work – 10% completed, civil work – 80% completed

As per the current work status from our site, we are targeted to complete the following works by the end of MARCH 2024.

  • Internal Finishes – Waterproofing – terrace 100% to be completed, GF landscape area 90% to be completed, Flooring – 1 more apartments to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 80% to be completed, Main stair handrail – 100% to be completed, parapet GI railing – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised gas piping system – 60 apartments to be completed, fire fighting work – BF 1 100% to be completed, Electrical LT work – wire pulling 1 more apartments to be completed, HVAC work – 23 more apartments to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed, Plumbing and Sanitarywares – 10B to be completed, Electrical final fixtures – 10B to be completed , fire final fixtures – 10B to be completed, lobby and games room – 60% to be completed.
  • External Finishes – Windows and sliding doors – 85% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – primer 100% to be completed, texture painting GF – 70% to be completed
  • Landscape Work Landscape work – 20% to be completed, Civil work – 100% to be completed

Work status as on 10-02-2024, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet -completed, Ground floor parapet – completed, GF Landscape structure work – 60% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 100% completed, Ground floor – completed, GF duct brick work – completed, Inside plastering – Basement 2 inside wall plastering completed, water tank plastering completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 90% completed, GF landscape area – 50% completed, wall tiling – 74 apartments completed, flooring – 74 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 75% completed, parapet GI railing – 85% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 81 nos: completed, Centralised gas piping system – 58 apartments completed, fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 60% Completed, Electrical LT work – wire pulling – 79 apartments completed, HT work – 72 apartments completed, HVAC work – 21 apartments completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed, Plumbing and Sanitary wares – sample flat, 6G, 2D completed, Electrical final fixtures – sample flat, 6G, 2D completed, fire final fixtures – sample flat, 6G, 2D completed
  • External Finishes – Windows and sliding doors – 75% completed, duct door – 75% completed, External plastering – B2 & B1 floor – 90% completed. External painting – primer 95% completed
  • Landscape Work – Landscape work – 10% completed
  • Mockup – Completed.

As per the current work status from our site, we are targeted to complete the following works by the end of FEBRUARY 2024.

  • Structural Works – Ground floor Landscape structure work – 75% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, GF landscape area 70% to be completed, Flooring – 2 more apartments to be completed, Wall tiling – 2 more apartments to be completed, Balcony handrail – 80% to be completed, Main stair handrail – 100% to be completed, parapet GI railing – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 1 no more to be completed, Centralised gas piping system – 60 apartments to be completed, fire fighting work – BF 1 100% to be completed, Electrical LT work – wire pulling 2 more apartments to be completed, HVAC work – 23 more apartments to be completed
  • Final Finishes – Plumbing and Sanitary wares – 10B to be completed, Electrical final fixtures – 10B to be completed , fire final fixtures – 10B to be completed
  • External Finishes – Windows and sliding doors – 85% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – primer 100% to be completed
  • Landscape Work – Landscape work – 20% to be completed

Work status as on 13-01-2024, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet -completed, Ground floor parapet – completed, GF Landscape structure work – 50% completed
  • Civil Works Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 99% completed, Ground floor – completed, GF duct brick work – completed, Inside plastering – Basement 2 inside wall plastering completed, water tank plastering completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 85% completed, GF landscape area – 40% completed, wall tiling – 72 apartments completed, flooring – 72 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 70% completed, parapet GI railing – 50% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 81 nos: completed, Centralised gas piping system – 58 apartments completed, fire fighting work – 1st to 12th floor – 100% completed, Electrical LT work – wire pulling – 79 apartments completed, HT work – 72 apartments completed, HVAC work – 19 apartments completed
  • Final Finishes – Door shutters & ironmongery – sample flat, 6G completed, Plumbing and Sanitary wares – sample flat, 6G, 2D completed, Electrical final fixtures – sample flat, 6G, 2D completed
  • External Finishes – Windows and sliding doors – 75% completed, duct door – 66% completed, External plastering – B2 & B1 floor – 60% completed. External painting – primer 95% completed
  • Mockup Completed.

As per the current work status from our site, we are targeted to complete the following works by the end of JANUARY 2024.

  • Structural Works – Ground floor Landscape structure work – 75% to be completed
  • Civil Works Masonry – Block/Brick – basement 2 floor – 100% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, GF landscape area 60% to be completed, Flooring – 2 more apartments to be completed, Wall tiling – 2 more apartments to be completed, Balcony handrail – 80% to be completed, Main stair handrail – 100% to be completed, parapet GI railing – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 1 no more to be completed, Centralised gas piping system – 60 apartments to be completed, Electrical LT work – wire pulling 2 more apartments to be completed
  • External Finishes – Windows and sliding doors – 85% to be completed, Duct door – 75% to be completed, External plastering B2 & B1 floor – 80% to be completed, Painting – primer 100% to be completed

Work status as on 08-12-2023, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet -completed, Ground floor parapet – completed, GF Landscape structure work – 50% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 99% completed, Ground floor – completed, GF duct brick work – 20% completed, Inside plastering – Basement 2 inside wall plastering completed, water tank plastering completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 85% completed, wall tiling – 72 apartments completed, flooring – 72 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 60% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 79 nos: completed, Centralised gas piping system – 46 apartments completed, fire fighting work – 1st to 11th floor – 100% completed, Electrical LT work – wire pulling – 79 apartments completed, HT work – 72 apartments completed, HVAC work – 14 apartments completed
  • Final Finishes – Door shutters & ironmongery – sample flat, 6G completed, Plumbing and Sanitary wares – sample flat, 6G, 2D completed, Electrical final fixtures – sample flat, 6G, 2D completed
  • External Finishes – Windows and sliding doors – 75% completed, duct door – 66% completed, External plastering – B2 & B1 floor – 40% completed. External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2023.

  • Structural Works – Ground floor Landscape structure work – 75% to be completed
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed, GF duct brick work – 100% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, Flooring – 2 more apartments to be completed, Wall tiling – 2 more apartments to be completed, Balcony handrail – 75% to be completed, Main stair handrail – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 2 nos more to be completed, Centralised gas piping system – 60 apartments to be completed, fire fighting work – 12th floor to be completed, Electrical LT work – wire pulling 2 more apartments to be completed
  • External Finishes – Windows and sliding doors – 85% to be completed, Duct door – 75% to be completed, External plastering B2 & B1 floor – 80% to be completed, Painting – primer 100% to be completed

Work status as on 10-11-2023, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet – 100% completed, Ground floor parapet – completed, GF Landscape structure work – 25% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 99% completed, Ground floor – completed, Basement 2 inside wall plastering completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 85% completed, wall tiling – 63 apartments completed, flooring – 62 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 40% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 76 nos: completed, , Centralised gas piping system – 17 apartments completed, fire fighting work – 1st to 11th floor – 100% completed, Electrical LT work – wire pulling – 68 apartments completed, HT work – 72 apartments completed, HVAC work – 14 apartments completed
  • External Finishes – Windows and sliding doors – 65% completed, duct door – 66% completed, External plastering – B2 & B1 floor – 40% completed. External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2023.

  • Structural Works – Ground floor Landscape structure work – 75% to be completed
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed.
  • Internal Finishes – Waterproofing – terrace 100% to be completed, Flooring – 2 more apartments to be completed, Wall tiling – 2 more apartments to be completed, Balcony handrail – 60% to be completed. Main stair handrail – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 4 nos more to be completed, fire fighting work – 12th floor to be completed, Electrical LT work – wire pulling 2 more apartments to be completed
  • External Finishes – Windows and sliding doors – 75% to be completed, Duct door – 75% to be completed, External plastering B2 & B1 floor – 60% to be completed. Painting – primer 100% to be completed

Work status as on 10-10-2023, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet – 100% completed, Ground floor parapet – 75% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 95% completed, Ground floor – completed, water tank plastering – 100% completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 85% completed, Sump tank – completed, OHT – Completed, wall tiling – 62 apartments completed, flooring – 62 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Balcony handrails – 40% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 76 nos: completed, Corridor handrail works – 95% completed, Centralised gas piping system – mockup only, fire fighting work – 1st to 11th floor – 100% completed, Electrical LT work – wire pulling – 68 apartments completed, HT work – 72 apartments completed, HVAC work – 14 apartments completed
  • External Finishes – Windows and sliding doors – 65% completed, duct door – 66% completed, External plastering – B2 & B1 floor – 25% completed. External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2023.

  • Structural Works – Ground floor parapet – 100% to be completed
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed. Basement 2 inside wall plastering 100% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, Flooring – 4 more apartments to be completed, Wall tiling – 4 more apartments to be completed, Balcony handrail – 60% to be completed. Main stair handrail – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 4 nos more to be completed, Corridor handrail works – 100% to be completed, fire fighting work – 12th floor to be completed, Electrical LT work – wire pulling 5 more apartments to be completed
  • External Finishes – Windows and sliding doors – 75% to be completed, Duct door – 75% to be completed, External plastering B2 & B1 floor – 50% to be completed. Painting – primer 100% to be completed

Work status as on 13-09-2023, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet – 99% completed, Ground floor parapet – 50% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 85% completed, Ground floor – completed, water tank plastering – 100% completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 85% completed, Sump tank – completed, OHT – Completed, wall tiling – 57 apartments completed, flooring – 56 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Balcony handrails – 25% completed
  • Electrical, Plumbing & Firefighting works – Main door – 82 apartments completed, Waterproofing – terrace – 85% completed, Sump tank – completed, OHT – Completed, wall tiling – 57 apartments completed, flooring – 56 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Balcony handrails – 25% completed
  • External Finishes – Windows and sliding doors – 50% completed, duct door – 66% completed, External plastering – 95% completed, External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2023.

  • Structural Works – basement 2 level parapet – 100% to be completed, Ground floor parapet – 75% to be completed
  • Civil Works – basement 2 level parapet – 100% to be completed, Ground floor parapet – 75% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, Flooring – 4 more apartments to be completed, Wall tiling – 4 more apartments to be completed, Balcony handrail – 35% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 6 nos: more to be completed, Corridor handrail works – 100% to be completed, fire fighting work – 12th floor to be completed, Electrical LT work – wire pulling 7 more apartments to be completed, HVAC work – 7 more apartments to be completed
  • External Finishes – Concealed plumbing works – 6 nos: more to be completed, Corridor handrail works – 100% to be completed, fire fighting work – 12th floor to be completed, Electrical LT work – wire pulling 7 more apartments to be completed, HVAC work – 7 more apartments to be completed

Work status as on 12-08-2023, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet – 95% completed, Ground floor parapet – 35% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 75% completed, Ground floor – 95% completed, water tank plastering – 100% completed
  • Internal Finishes – Main door – 80 apartments completed, Waterproofing – terrace – 85% completed, Sump tank – completed, OHT – Completed, wall tiling – 53 apartments completed, flooring – 51 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Balcony handrails – 15% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 72 nos: completed, Corridor handrail works – 95% completed, Centralised gas piping system – mockup only, fire fighting work – 1st to 10th floor – 100% completed, Electrical LT work – wire pulling – 60 apartments completed, HT work – 66 apartments completed, HVAC work – 14 apartments completed
  • External Finishes – Windows and sliding doors – 40% completed, duct door – 65% completed, External plastering – 95% completed, External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of AUGUST 2023.

  • Structural Works – basement 2 level parapet – 100% to be completed, Ground floor parapet – 50% to be completed
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed, Ground floor – 100% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, Flooring – 4 more apartments to be completed, Wall tiling – 4 more apartments to be completed, Balcony handrail – 25% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 6 nos: more to be completed, Corridor handrail works – 100% to be completed, fire fighting work – 11th floor to be completed, Electrical LT work – wire pulling 7 more apartments to be completed, HVAC work – 7 more apartments to be completed
  • External Finishes – Windows and sliding doors – 50% to be completed, Duct door – 75% to be completedExternal plastering – 100% to be completed, Painting – primer 100% to be completed

Work status as on 12-07-2023, we have completed the following.

  • Structural Works – Swimming pool wall – 100% completed, basement 2 level parapet – 90% completed, Ground floor – completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 75% completed, Ground floor – 90% completed
  • Internal Finishes – Main door – 80 apartments completed, Waterproofing – terrace – 85% completed, Sump tank – 100% completed, OHT – Completed, wall tiling – 43 apartments completed, flooring – 40 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 72 nos: completed, Corridor handrail works – 95% completed, Centralised gas piping system – mockup only, fire fighting work – 2nd to 10th floor – 100% completed, Electrical LT work – wire pulling – 47 apartments completed, HT work – 34 apartments completed, HVAC work – 4th floor completed
  • External Finishes – Windows and sliding doors – mockup only, duct door – 50% completed, External plastering – 95% completed, External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of JULY 2023.

  • Structural Works – basement 2 level parapet – 100% to be completed
  • Civil Works – Masonry – Masonry – Block/Brick – basement 2 floor – 100% to be completed, Ground floor – 100% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, Flooring – 5 more apartments to be completed, Wall tiling – 7 more apartments to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 6 nos: more to be completed, Corridor handrail works – 100% to be completed, fire fighting work – 11th floor to be completed, Electrical LT work – wire pulling 7 more apartments to be completed, HVAC work – 5th floor to be completed
  • External Finishes – Duct door – 75% to be completedExternal plastering – 100% to be completed, Painting – primer 100% to be completed

Work status as on 06-06-2023, we have completed the following.

  • Structural Works – Swimming pool wall – 100% completed, basement 2 level parapet – 90% completed, Ground floor – completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 75% completed, Ground floor – 90% completed
  • Internal Finishes – Main door – 80 apartments completed, Waterproofing – terrace – 75% completed, Sump tank – 100% completed, OHT – 75% Completed, wall tiling – 43 apartments completed, flooring – 40 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 72 nos: completed, Corridor handrail works – 95% completed, Centralised gas piping system – mockup only, fire fighting work – 2nd to 10th floor – 100% completed, Electrical LT work – wire pulling – 45 apartments completed, HT work – cable tray work started
  • External Finishes – Windows and sliding doors – mockup only, External plastering – 95% completed, External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2023.

  • Structural Works – basement 2 level parapet – 100% to be completed,
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed, Ground floor – 100% to be completed
  • Internal Finishes – Maindoor – 3 more numbers to be fixed, Waterproofing – OHT Tank – 100% to be completed, terrace 85% to be completed, Flooring – 5 more apartments to be completed, Wall tiling – 7 more apartments to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 6 nos: more to be completed, Corridor handrail works – 100% to be completed, Electrical LT work – wire pulling 7 more apartments to be completed
  • External Finishes – External plastering – 100% to be completed, Painting – primer 100% to be completed

 

Work status as on 05-05-2023, we have completed the following.

  • Structural Works – Swimming pool wall – 100% completed, basement 2 level parapet – 90% completed, Ground floor – 90% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 75% completed, Ground floor – 80% completed
  • Internal Finishes – Main door – 63 apartments completed, Waterproofing – terrace – 40% completed, Sump tank – 100% completed, wall tiling – 43 apartments completed, flooring – 37 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 72 nos: completed, Corridor handrail works – 95% completed, Centralised gas piping system – mockup only, fire fighting work – 2nd to 10th floor – 100% completed, Electrical LT work – wire pulling – 40 apartments completed, HT work – cable tray work started
  • External Finishes – Windows and sliding doors – mockup only, External plastering – 95% completed, External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2023.

  • Structural Works – basement 2 level parapet – 100% to be completed, Ground floor – 100% to be completed
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed, Ground floor – 100% to be completed
  • Internal Finishes – Maindoor – 11 more numbers to be fixed, Waterproofing – OHT Tank – 75% to be completed, terrace 75% to be completed, Flooring – 5 more apartments to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 6 nos: more to be completed, Electrical LT work – wire pulling 7 more apartments to be completed
  • External Finishes – External plastering – 100% to be completed, Painting – primer 100% to be completed

Work status as on 08-04-2023, we have completed the following.

  • Structural Works – Swimming pool wall – 100% completed, basement 2 level parapet – 90% completed, Ground floor – 90% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 75% completed, Ground floor – 75% completed
  • Internal Finishes – Main door – 56 apartments completed, Waterproofing – 15th floor – 75% completed, terrace – 40% completed, Sump tank – 75% completed, wall tiling – 43 apartments completed, flooring – 35 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 72 nos: completed, Corridor handrail works – 95% completed, Centralised gas piping system – mockup only, fire fighting work – 2nd to 10th floor – 100% completed, Electrical LT work – wire pulling – 35 apartments completed, HT work – cable tray work started
  • External Finishes – Windows and sliding doors – mockup only, External plastering – 95% completed, External painting – primer 90% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of APRIL 2023.

  • Structural Works – basement 2 level parapet – 100% to be completed, Ground floor – 100% to be completed
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed, Ground floor – 100% to be completed
  • Internal Finishes – Maindoor – 18 more numbers to be fixed, Waterproofing – sump tank – 100% to be completed, terrace 75% to be completed, Flooring – 5 more apartments to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 6nos: more to be completed, Electrical LT work – wire pulling 7 more apartments to be completed
  • External Finishes – External plastering – 100% to be completed, Painting – primer 95% to be completed

Click here to see the previous work progress updates.

Structure
  • Deep pile foundation complying with seismic 3 zone
  • RCC frame structure with brickwork and or concrete block partitions.
  • Concrete grade and Steel grade as per structural consultant’s advice.
Flooring, Tiling & Railings
  • Main entrance lobby, Lift lobby and Lift fascia (wall & floor) using composite
    marble / granite / vitrified tiles, as per the architect’s design.
  • Staircases using granite / vitrified tile flooring with hand railing using matt finished SS / MS with or without toughened glass as per architect’s design.
  • Car Park Area: Grano flooring with grooves or exterior grade paving tiles.
  • Foyer / Living / Dining using 80cm X 80cm Premium Double charged vitrified tiles. [Kajaria / Asian or equivalent).
  • Kitchen: 60cm X 60cm premium double charged Vitrified tiles for the flooring (Kajaria/ Asian or equivalent)
  • Master Bed Room: Laminated wooden flooring AC4 Grade. All other bed rooms 60cmx60cm Premium Double Charged Vitrified tiles.
  • All Bed room Toilets: Designer ceramic tile concepts 30cm X 30cm for floor and 60cm X 30cm for walls up to ceiling height of 8’ 0.
  • Servants Toilet : Ceramic tile 30cm X 30cm for floor and 30cm X 45cm for walls upto 8’0” height.
  • Utility Room: 30cm X 30cm for floor and 30cm X 45cm for (kitchen wall) walls upto 4’6” height and 2’ above the counter if any. (using any premium Indian brands).
  • Balconies / Open Terraces / Decks : Rustic / antiskid / ceramic tiles 30cm X 30cm or (wood finished vitrified tiles) with MS / SS / Toughened Glass railings upto 1.2M heights. (using any premium Indian brands)
Sanitary & Plumbing
  • Sanitary fittings: will be of KOHLER, ROCCA or equivalent.
  • All Sanitary wares shall be of white colour only.
  • Concealed cisterns (concealed flushing system) will be of GEBERIT from Switzerland or GROHE from Germany or equivalent make. Actuator plates shall be in CP Finish dual flushing system
  • Faucets: for all the bed room toilets will be single lever concealed diverters CP finish, heavy body metal fittings of ROCA from Spain or GROHE from Germany or equivalent make.
  • Provision for hot water connection shall be provided for overhead shower (30cm X 30cm over head rain shower for master bed toilet and multi function over head shower in other toilets, normal shower for servant toilet).
  • Wall mounted single lever faucet make ROCA from Spain or GROHE from Germany will be provided for the wash basins, Kitchen and utility area sink.
  • Plumbing: All water supply lines shall be in ISI marked CPVC pipes. Drainage lines and storm water drain pipes shall be in PVC, Cockroach traps make CHILLI shall be provided as gratings for all necessary locations, Health Faucet ROCA from Spain or GROHE from Germany shall be provided near EWC in all the toilets.
  • Stainless Steel Sink multi bowl with drain board of make NIRALI / FRANKE or equivalent make shall be provided for the kitchen and stainless steel sink without drain board shall be provided for the utility areas
  • Towel rods, towel ring, soap dish shall be provided inside the toilets.
Doors & Windows
  • Window shutters: Prefabricated colour Anodised aluminum sliding shutters .One pane of Insect screen also shall be provided in each window.
  • Door Frames: Main door frame and shutter shall be of seasoned teak wood. Outer and Inner face to be PU coated and finished as per the Architects design.
  • Door Shutters: All internal door frames shall be of seasoned hard wood with flush door shutters. All internal and external faces shall be melamine finish or Paint finish as per the Architects design.
  • Hardware: All hardware shall be in C.P Brass, tower bolts, doorstoppers, ball bearing hinges. Locks shall be mortise of DORSET / YALE make from USA or equivalent.
  • Entrance door shall have hardware such as, Magic Eye, Safety Chain, Door Stopper and a BIO Metric lock from SAMSUNG or equivalent.
Electrical
  • Concealed copper wiring using FINOLEX / V-GUARD / HAVELLS make cables with modular plate switches, centralized cabling system for all electrical and communication requirements.
  • Wiring shall be done for lighting, 5Amps, 15 Amps and AC points in the Apartment.
  • Switches: All switches shall be LEGRAND – ARTEOR make or equivalent.
  • Generator: Power backup will be provided for all common services and selected light and fan point in each living, bedrooms inside apartment and a refrigerator point, plus additional one 5Amp plug point in the Kitchen, one light point in all the toilets, one 5Amp plug point at Living for emergency charging of devices shall be provided (Air-conditioning and Geyser points and other 15Amp points will not be considered for the power back up).
  • Exhaust Fan in toilets.
  • Light fixtures for the Common areas, external areas, apartment balconies and at entrance door of the individual apartments shall be provided.
  • All light fixtures shall be of PHILIPS / HAVELLS or equivalent.
  • Adequate ELCB and MCB shall be provided in each apartments SIEMENS /HAVELLS or equivalent.
  • Provision for the GEYSER points and fresh air fans shall be provided for all toilets.
  • Provision for telephone and Internet shall be provided in the living room and master bed room.
  • Provision for Cable TV / DTH shall be provided in the Living and Master Bed room.
Paint Finishes
  • Premium emulsion paint shall be applied for the ceiling and interior walls of the apartments excluding Utility and Services.
  • Internal Walls: Acrylic / cement based Putty with Premium emulsion paint.
  • External Walls: Weather shield exterior grade emulsion / texture paint.
Elevator/s
  • Elevators: High Speed lift shall be provided as per the Govt. norms in each core with automatic doors & SS brush finish of KONE / SCHINDLER or reputed make.
  • ARD (Automatic Rescue Device) shall be installed in the passenger lift as a premium feature.
Air Conditioning
  • Ductable Air-Conditioning in Living/Dining room.
  • Split Air -Conditioning for Bedrooms
Home Automation
  • Multi level security systems for common areas and lobbies, Access control entry to the
    common entrance / foyers and gymnasium
  • Light motion sensors for selected common areas
  • Home security monitoring, gas leakage detectors, emergency panic intrusion alarm,
    visitor tracking
Landscaping
  • Provision for sprinklers and a drip system shall be provided for necessary common area landscaping.
  • Interlock Pavers to be laid in driveways and walkways.
  • Hard and soft landscaping shall be provided as per the landscape consultant’s design.

Disclaimer: Artech Realtors PVT LTD, reserves the right to change / alter /delete the brands specified above, subject to its availability to an equivalent and competitive product.

Are you on the lookout for a home loan? We can help you. We have tie-ups with prominent banks for this project. It will help you make the loan application process easier.

  • Health Club
  • Sauna Bath/Steam bath
  • Swimming Pool
  • Association Hall
  • AV Room
  • Guest suite
  • Drivers Rest Room.
  • Party space
  • Children’s Play Area
  • WIFI Lobby
  • Spa
  • Indoor Games Room
  • Video Door Phone
  • F.T.T.H
  • Rain Water Harvesting
  • Reticulated Gas System
  • Incinerator

Work status as on 12-12-2024, we have completed the following.

  • Civil Works – Ceiling and wall plastering 85% completed,MASONRY WORKS, Block/ brick- Basement 1 floor 100% completed, Basement 2 floor – 100% completed,Ground floor – completed, Party area toilet block work – 100% completed Swmimming pool area toilet & pump room block work 100% completed,Block work for seater in GF landscape area – 100% completed ,GF duct brick work – completed, Inside plastering – Basement 2 inside wall plastering completed,Water tank plastering completed,Party area toilet plastering 100% completed, Swimming pool area toilet plastering – 100% completed 16th Terrace protection plastering 100% completed,Protection plastering GF yard area- 100% Protection plastering Holding tank- 100%,compound wall plastering-25%
  • Internal Finishes – Main door – 82 apartments completed,Waterproofing -100% completed,Wall tiling – 81 apartments completed,Flooring – 81 apartments completed ,B1 parking tile – 70% completed ,Putty works – 100% completed ,Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed ,Main stair handrail – 60% completed, Balcony handrails – 90% completed,Parapet GI railing – 100% completed Sliding Doors and Windows -85% completed B2 Parking Tiles: 75% completed TERRACE TILING :90% completed GF Landscape Area Granite Fixing 80% completed
  • Electrical, Plumbing ; Firefighting works- Concealed plumbing works – 82 nos. completed,Centralised gas piping system – 81 apartments completed, Fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, gym, association hall, lobby – 100% completed Electrical LT work – wire pulling – 90% completed, GF landscape area – 90% completed, HT work – 72 apartments completed, HVAC work – 32 apartments, lobby, games room, gym completed
  • Final Finishes Final Painting 1st coat – 38 Apartments, Final Painting 2nd coat – 5 Apartments Plumbing & Sanitaryware- 8 Apartments,Electrical final fixtures- 8 apartments, Firefighting final fixtures-8 apartments ,AV room -100% , Lobby,games room ,Gym glass work -100% ,Main Door Lock Fixing – 62 Nos
  • External Finishes- Windows and sliding doors – 80% completed Duct door – 90% completed External plastering – B2 & B1 floor – 95% completed, External painting – 40% completed ,Texture painting GF – 100% completed Passage SD 90% completed
  • Yard Work – Fire fighting work yard area – 95% completed
  • Landscape Work- Landscape work – 50% completed, civil work – 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2024.

  • Civil works -Compound wall plastering-70%
  • Internal Finishes Wall tiling- 1 apartment LFlooring -1 aparments, Apartment Balcony handrail- 100% ,Common Area balcony handrail-100% ,Terrace tiling -100% ,G floor landscape area granite fixing- 100% , SWIMMING POOL TILE WORK-100%
  • Electrical, Plumbing & Firefighting works- Elecctrical LT work- landscape area ground floor -100%, HVAC WORK – 2 apartments
  • Final Finishes – Final Painting 1st coat – 40 Apartments ,Final Painting 2ND coat – 7 Apartments, Plumbing & Sanitaryware- 10 Apartments
    Electrical final fixtures-10 Apartments, Firefighting final fixtures- 10 Apartments , Main Door Lock Fixing – 80 NOS
  • External Finishes- Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – 100% to be completed,
  • Yard Work – Fire fighting work yard area – 100% to be completed
  • Landscape Work- Landscape work – 70% to be completed

Work status as on 08-11-2024, we have completed the following.

  • Internal Finishes Main door – 82 apartments completed,Waterproofing – terrace – 95% completed, GF landscape area – 95% completed,Wall tiling – 81 apartments completed Flooring – 81 apartments completed ,B1 parking tile – 70% completed ,Putty works – 100% completed ,Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed ,Main stair handrail – 60% completed, Balcony handrails – 90% completed,Parapet GI railing – 100% completed Sliding Doors and Windows -85% completed B2 Parking Tiles: 60% completed TERRACE TILING :75% completed
  • GF Landscape Area Granite Fixing 75% completed
  • Electrical, Plumbing & Firefighting works Concealed plumbing works – 82 nos. completed,Centralised gas piping system – 74 apartments completed, Fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, gym, association hall, lobby – 100% completed Electrical LT work – wire pulling – 82 apartments completed, GF landscape area – 90% completed, HT work – 72 apartments completed, HVAC work – 32 apartments, lobby, games room, gym completed
  • Final Finishes Door shutters & ironmongery – 6 apartments completed , Plumbing and Sanitarywares – 8 apartments completed,Electrical final fixtures – 8 apartments completed ,Fire final fixtures – 8 apartments completed ,Lobby and games room – 80% completed, Final painting – 38 Apartments completed Solar Panel completed AV Room completed
  • External Finishes Windows and sliding doors – 80% completed Duct door – 75% completed External plastering – B2 & B1 floor – 95% completed, External painting – 40% completed ,Texture painting GF – 100% completed Passage SD 70% completed
  • Yard Work Fire fighting work yard area – 85% completed
  • Landscape Work Landscape work – 50% completed, civil work – 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2024.

  • Internal Finishes Waterproofing – terrace 100% to be completed, GF landscape area 100% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 90% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 100% to be completed, Main stair handrail – 100% to be completedSliding Doors and Windows -90% to be completed B2 Parking Tiles: 100% to be completed TERRACE TILING :75% to be completed
  • Electrical, Plumbing & Firefighting works Centralised gas piping system – 80 apartments to be completed, Electrical LT work – GF lndscape area 100% to be completed, HVAC work – association hall,2 apartments to be completed
  • Final Finishes Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – 100% to be completed,
  • Yard Work Fire fighting work yard area – 85% to be completed
  • Landscape Work Landscape work – 70% to be completed

Work status as on 14-10-2024, we have completed the following.

  • Civil Works- Ceiling and wall plastering 85% completed,MASONRY WORKS, Block/ brick- Basement 1 floor 100% completed, Basement 2 floor – 100% completed,Ground floor – completed, Party area toilet block work – 100% completed Swmimming pool area toilet & pump room block work 100% completed,Block work for seater in GF landscape area – 100% completed ,GF duct brick work – completed.Inside plastering – Basement 2 inside wall plastering completed,Water tank plastering completed,Party area toilet plastering 100% completed, Swimming pool area toilet plastering – 100% completed 16th Terrace protection plastering 100% completed
  • Main door – 82 apartments completed,Waterproofing – terrace – 95% completed, GF landscape area – 95% completed,Wall tiling – 80 apartments completed Flooring – 80 apartments completed ,B1 parking tile – 70% completed ,Putty works – 100% completed ,Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed ,Main stair handrail – 60% completed, Balcony handrails – 90% completed,Parapet GI railing – 100% completed Sliding Doors and Windows -85% completed B2 Parking Tiles: 60% completed TERRACE TILING :45% completed
  • Electrical, Plumbing & Firefighting works-Concealed plumbing works – 82 nos. completed,Centralised gas piping system – 74 apartments completed, Fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, gym, association hall, lobby – 100% completedElectrical LT work – wire pulling – 82 apartments completed, GF landscape area – 90% completed, HT work – 72 apartments completed, HVAC work – 30 apartments, lobby, games room, gym completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed , Plumbing and Sanitarywares – sample flat, 6G, 2D,10B,3G completed,Electrical final fixtures – sample flat, 6G, 2D,10B,3G completed,Fire final fixtures – sample flat, 6G,10B,3G completed ,Lobby and games room – 35% completed, Final painting – 36Apartments completed Solar Panel 70% completed
  • External Finishes- Windows and sliding doors – 80% completed Duct door – 75% completed External plastering – B2 & B1 floor – 95% completed, External painting – Primer 100% completed,Emulsion – 40% completed ,Texture painting GF – 100% completed Passage SD 70% completed
  • Yard Work – Fire fighting work yard area – 80% completed
  • Landscape Work- Landscape work – 50% completed, civil work – 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2024.

  • Civil Works- Final Painting 1st coat – 38 APARTMENTS ,Plumbing and Sanitaryware- 10E,7A,Electrical final fixtures-10E,7A
    Firefighting final fixtures- 10E,7A ,Solar panel -100% to be completed
  • Internal Finishes- Waterproofing – terrace 100% to be completed, GF landscape area 100% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 90% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 100% to be completed, Main stair handrail – 100% to be completedSliding Doors and Windows -90% to be completed B2 Parking Tiles: 100% to be completed TERRACE TILING :75% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised gas piping system – 80 apartments to be completed, Electrical LT work – GF lndscape area 100% to be completed, HVAC work – association hall,2 apartments to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes – Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – 100% to be completed
  • Yard Work – Fire fighting work yard area – 85% to be completed
  • Landscape Work – Landscape work – 70% to be completed

Work status as on 12-09-2024, we have completed the following.

  • Internal Finishes – Main door – 82 apartments completed,Waterproofing – terrace – 95% completed, GF landscape area – 95% completed,Wall tiling – 79 apartments completed,Flooring – 79 apartments completed ,B1 parking tile – 70% completed ,Putty works – 100% completed ,Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed ,Main stair handrail – 60% completed, Balcony handrails – 85% completed,Parapet GI railing – 100% completed
  • Electrical, Plumbing & Firefighting works-Concealed plumbing works – 81 nos. completed,Centralised gas piping system – 74 apartments completed, Fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, gym, association hall, lobby – 100% completedElectrical LT work – wire pulling – 82 apartments completed, GF landscape area – 75% completed, HT work – 72 apartments completed, HVAC work – 28 apartments, lobby, games room, gym completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed , Plumbing and Sanitarywares – sample flat, 6G, 2D,10B,3G completed,Electrical final fixtures – sample flat, 6G, 2D,10B,3G completed,Fire final fixtures – sample flat, 6G,10B,3G completed ,Lobby and games room – 35% completed, Final painting – 34 Apartments completed
  • External Finishes- Windows and sliding doors – 80% completed Duct door – 75% completed External plastering – B2 & B1 floor – 95% completed, External painting – Primer 100% completed,Emulsion – 30% completed ,Texture painting GF – 100% completed
  • Yard Work -Fire fighting work yard area – 80% completed
  • Landscape Work – Landscape work – 40% completed, civil work – 100% completed
  • Completed.

As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2024.

  • Internal Finishes- Waterproofing – terrace 100% to be completed, GF landscape area 100% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 90% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 100% to be completed, Main stair handrail – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised gas piping system – 80 apartments to be completed, Electrical LT work – GF lndscape area 100% to be completed, HVAC work – association hall,2 apartments to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes – Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – 100% to be completed
  • Yard Work – Fire fighting work yard area – 85% to be completed
  • Landscape Work – Landscape work – 70% to be completed

Work status as on 13-08-2024, we have completed the following.

  • Civil Works- Ceiling and wall plastering 85% completed,MASONRY WORKS ,Block/ brick- Basement 1 floor 100% completed,Basement 2 floor – 100% completed,Ground floor – completed, Party area toilet block work – 100% completed Swmimming pool area toilet & pump room block work 100% completed, Block work for seater in GF landscape area – 100% completed,GF duct brick work – completed,Inside plastering – Basement 2 inside wall plastering completed,Water tank plastering completed ,Party area toilet plastering 100% completed,Swimming pool area toilet plastering – 100% completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 90% completed, GF landscape area – 95% completed,Wall tiling – 78 apartments completed,Flooring – 78 apartments completed,B1 parking tile – 70% completed,Putty works – 100% completed,Door frame fixtures- 100% completed,Handrails – fire stair handrail – 100% Completed,Main stair handrail – 60% completed,Balcony handrails – 85% completed Parapet GI railing – 100% completed
  • Electrical, Plumbing & Firefighting works-Concealed plumbing works – 81 nos. completed,Centralised gas piping system – 74 apartments completed,Fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, gym, association hall, lobby – 100% completed, Electrical LT work – wire pulling – 82 apartments completed, GF landscape area – 75% completed, HT work – 72 apartments completed, HVAC work – 27 apartments, lobby, games room, gym completed.
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed,Plumbing and Sanitarywares – sample flat, 6G, 2D,10B completed,Electrical final fixtures – sample flat, 6G, 2D,10B completed,Fire final fixtures – sample flat, 6G,10B completed,Lobby and games room – 35% completed,Final painting – 32 Apartments completed
  • External Finishes- Windows and sliding doors – 80% completed,Duct door – 75% completed,External plastering – B2 & B1 floor – 95% completed,External painting – Primer 95% completed,Emulsion – 20% completed,Texture painting GF – 90% completed
  • Yard Work – Fire fighting work yard area – 70% completed
  • Landscape Work -Landscape work – 15% completed, civil work – 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of AUGUST 2024.

  • Civil Works – Ceiling and wall plastering – 100% to be completed
  • Internal Finishes- Waterproofing – terrace 100% to be completed, GF landscape area 100% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 90% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 100% to be completed, Main stair handrail – 100% to be completed
  • Electrical, Plumbing & Firefighting works -Centralised gas piping system – 80 apartments to be completed, Electrical LT work – GF lndscape area 100% to be completed, HVAC work – association hall to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes – Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – primer 100% to be completed, texture painting GF – 100% to be completed
  • Yard Work – Fire fighting work yard area – 85% to be completed
  • Landscape Work – Landscape work – 20% to be completed

Work status as on 09-07-2024, we have completed the following.

  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 90% completed, GF landscape area – 95% completed, wall tiling – 78 apartments completed, flooring – 78 apartments completed, B1 parking tile – 70% completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 80% completed, parapet GI railing – 100% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 81 nos: completed, Centralised gas piping system – 74 apartments completed, fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, gym, association hall, lobby – 100% completed, Electrical LT work – wire pulling – 82 apartments completed, GF landscape area – 50% completed, HT work – 72 apartments completed, HVAC work – 27 apartments, lobby, games room, gym completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed, Plumbing and Sanitarywares – sample flat, 6G, 2D,10B completed, Electrical final fixtures – sample flat, 6G, 2D,10B completed, fire final fixtures – sample flat, 6G,10B completed, lobby and games room – 35% completed, final painting – 24 Apartments completed
  • External Finishes – Windows and sliding doors – 80% completed, duct door – 75% completed, External plastering – B2 & B1 floor – 90% completed, External painting – primer 95% completed, painting – 20% completed, texture painting GF – 90% completed
  • Yard Work – Fire fighting work yard area – 70% completed
  • Landscape Work – Landscape work – 15% completed, civil work – 100% completed
  • Mockup – Completed.

As per the current work status from our site, we are targeted to complete the following works by the end of JULY 2024.

  • Internal Finishes – Waterproofing – terrace 100% to be completed, GF landscape area 100% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 90% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 100% to be completed, Main stair handrail – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised gas piping system – 80 apartments to be completed, Electrical LT work – GF lndscape area 100% to be completed, HVAC work – association hall to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes – Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – primer 100% to be completed, texture painting GF – 100% to be completed
  • Yard Work – Fire fighting work yard area – 85% to be completed
  • Landscape Work – Landscape work – 20% to be completed

Work status as on 11-06-2024, we have completed the following.

  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 90% completed, GF landscape area – 95% completed, wall tiling – 77 apartments completed, flooring – 77 apartments completed, B1 parking tile – 60% completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 75% completed, parapet GI railing – 90% completed
  • Electrical, Plumbing & Firefighting works -Firefighting works Concealed plumbing works – 81 nos: completed, Centralised gas piping system – 74 apartments completed, fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, Electrical LT work – wire pulling – 82 apartments completed, HT work – 72 apartments completed, HVAC work – 24 apartments completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed, Plumbing and Sanitarywares – sample flat, 6G, 2D,10B completed, Electrical final fixtures – sample flat, 6G, 2D,10B completed, fire final fixtures – sample flat, 6G,10B completed, lobby and games room – 35% completed, final painting – 18 Apartments completed
  • External Finishes- Windows and sliding doors – 80% completed, duct door – 75% completed, External plastering – B2 & B1 floor – 90% completed, External painting – primer 95% completed, painting – 20% completed, texture painting GF – 75% completed
  • Yard Work – Fire fighting work yard area – 50% completed
  • Landscape Work -Landscape work – 10% completed, civil work – 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2024.

  • Internal Finishes – Waterproofing – terrace 100% to be completed, GF landscape area 100% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 90% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 80% to be completed, Main stair handrail – 100% to be completed, parapet GI railing – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised gas piping system – 80 apartments to be completed, Electrical LT work – wire pulling gym, association hall to be completed, HVAC work – lobby, gym, association hall to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes- Windows and sliding doors – 90% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – primer 100% to be completed, texture painting GF – 100% to be completed
  • Yard Work – Fire fighting work yard area – 70% to be completed
  • Landscape Work -Landscape work – 20% to be completed

Work status as on 09-04-2024, we have completed the following.

  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 90% completed, GF landscape area – 70% completed, wall tiling – 76 apartments completed, flooring – 76 apartments completed, B1 parking tile – 30% completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 75% completed, parapet GI railing – 85% completed
  • Electrical, Plumbing & Firefighting works Concealed plumbing works – 81 nos: completed, Centralised gas piping system – 58 apartments completed, fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 100% Completed, Electrical LT work – wire pulling – 80 apartments completed, HT work – 72 apartments completed, HVAC work – 21 apartments completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed, Plumbing and Sanitarywares – sample flat, 6G, 2D,10B completed, Electrical final fixtures – sample flat, 6G, 2D,10B completed, fire final fixtures – sample flat, 6G,10B completed, lobby and games room – 35% completed, final painting – 5 Apartments completed
  • External Finishes – Windows and sliding doors – 75% completed, duct door – 75% completed, External plastering – B2 & B1 floor – 90% completed, External painting – primer 95% completed, texture painting GF – 50% completed
  • Yard Work – Fire fighting work yard area – 20% completed
  • Landscape Work – Landscape work – 10% completed, civil work – 90% completed

As per the current work status from our site, we are targeted to complete the following works by the end of APRIL 2024.

  • Internal Finishes – Waterproofing – terrace 100% to be completed, GF landscape area 90% to be completed, Flooring – 1 more apartments to be completed, B1 parking tile – 60% to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 80% to be completed, Main stair handrail – 100% to be completed, parapet GI railing – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised gas piping system – 60 apartments to be completed, Electrical LT work – wire pulling 1 more apartments to be completed, HVAC work – 23 more apartments to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed
  • External Finishes Windows and sliding doors – 85% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – primer 100% to be completed, texture painting GF – 70% to be completed
  • Yard Work – Fire fighting work yard area – 50% to be completed
  • Landscape Work – Landscape work – 20% to be completed, Civil work – 100% to be completed

Work status as on 09-03-2024, we have completed the following.

  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 90% completed, GF landscape area – 70% completed, wall tiling – 75 apartments completed, flooring – 75 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 75% completed, parapet GI railing – 85% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 81 nos: completed, Centralised gas piping system – 58 apartments completed, fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 90% Completed, Electrical LT work – wire pulling – 80 apartments completed, HT work – 72 apartments completed, HVAC work – 21 apartments completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed, Plumbing and Sanitarywares – sample flat, 6G, 2D completed, Electrical final fixtures – sample flat, 6G, 2D completed, fire final fixtures – sample flat, 6G completed, lobby and games room – 35% completed.
  • External Finishes Windows and sliding doors – 75% completed, duct door – 75% completed, External plastering – B2 & B1 floor – 90% completed, External painting – primer 95% completed, texture painting GF – 25% completed
  • Landscape Work – Landscape work – 10% completed, civil work – 80% completed

As per the current work status from our site, we are targeted to complete the following works by the end of MARCH 2024.

  • Internal Finishes – Waterproofing – terrace 100% to be completed, GF landscape area 90% to be completed, Flooring – 1 more apartments to be completed, Wall tiling – 1 more apartments to be completed, Balcony handrail – 80% to be completed, Main stair handrail – 100% to be completed, parapet GI railing – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Centralised gas piping system – 60 apartments to be completed, fire fighting work – BF 1 100% to be completed, Electrical LT work – wire pulling 1 more apartments to be completed, HVAC work – 23 more apartments to be completed
  • Final Finishes – Door shutters & ironmongery – 10 apartments to be completed, Plumbing and Sanitarywares – 10B to be completed, Electrical final fixtures – 10B to be completed , fire final fixtures – 10B to be completed, lobby and games room – 60% to be completed.
  • External Finishes – Windows and sliding doors – 85% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – primer 100% to be completed, texture painting GF – 70% to be completed
  • Landscape Work Landscape work – 20% to be completed, Civil work – 100% to be completed

Work status as on 10-02-2024, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet -completed, Ground floor parapet – completed, GF Landscape structure work – 60% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 100% completed, Ground floor – completed, GF duct brick work – completed, Inside plastering – Basement 2 inside wall plastering completed, water tank plastering completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 90% completed, GF landscape area – 50% completed, wall tiling – 74 apartments completed, flooring – 74 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 75% completed, parapet GI railing – 85% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 81 nos: completed, Centralised gas piping system – 58 apartments completed, fire fighting work – 1st to 12th floor – 100% completed, BF 1 – 60% Completed, Electrical LT work – wire pulling – 79 apartments completed, HT work – 72 apartments completed, HVAC work – 21 apartments completed
  • Final Finishes – Door shutters & ironmongery – 6 apartments completed, Plumbing and Sanitary wares – sample flat, 6G, 2D completed, Electrical final fixtures – sample flat, 6G, 2D completed, fire final fixtures – sample flat, 6G, 2D completed
  • External Finishes – Windows and sliding doors – 75% completed, duct door – 75% completed, External plastering – B2 & B1 floor – 90% completed. External painting – primer 95% completed
  • Landscape Work – Landscape work – 10% completed
  • Mockup – Completed.

As per the current work status from our site, we are targeted to complete the following works by the end of FEBRUARY 2024.

  • Structural Works – Ground floor Landscape structure work – 75% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, GF landscape area 70% to be completed, Flooring – 2 more apartments to be completed, Wall tiling – 2 more apartments to be completed, Balcony handrail – 80% to be completed, Main stair handrail – 100% to be completed, parapet GI railing – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 1 no more to be completed, Centralised gas piping system – 60 apartments to be completed, fire fighting work – BF 1 100% to be completed, Electrical LT work – wire pulling 2 more apartments to be completed, HVAC work – 23 more apartments to be completed
  • Final Finishes – Plumbing and Sanitary wares – 10B to be completed, Electrical final fixtures – 10B to be completed , fire final fixtures – 10B to be completed
  • External Finishes – Windows and sliding doors – 85% to be completed, Duct door – 100% to be completed, External plastering B2 & B1 floor – 100% to be completed, Painting – primer 100% to be completed
  • Landscape Work – Landscape work – 20% to be completed

Work status as on 13-01-2024, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet -completed, Ground floor parapet – completed, GF Landscape structure work – 50% completed
  • Civil Works Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 99% completed, Ground floor – completed, GF duct brick work – completed, Inside plastering – Basement 2 inside wall plastering completed, water tank plastering completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 85% completed, GF landscape area – 40% completed, wall tiling – 72 apartments completed, flooring – 72 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 70% completed, parapet GI railing – 50% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 81 nos: completed, Centralised gas piping system – 58 apartments completed, fire fighting work – 1st to 12th floor – 100% completed, Electrical LT work – wire pulling – 79 apartments completed, HT work – 72 apartments completed, HVAC work – 19 apartments completed
  • Final Finishes – Door shutters & ironmongery – sample flat, 6G completed, Plumbing and Sanitary wares – sample flat, 6G, 2D completed, Electrical final fixtures – sample flat, 6G, 2D completed
  • External Finishes – Windows and sliding doors – 75% completed, duct door – 66% completed, External plastering – B2 & B1 floor – 60% completed. External painting – primer 95% completed
  • Mockup Completed.

As per the current work status from our site, we are targeted to complete the following works by the end of JANUARY 2024.

  • Structural Works – Ground floor Landscape structure work – 75% to be completed
  • Civil Works Masonry – Block/Brick – basement 2 floor – 100% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, GF landscape area 60% to be completed, Flooring – 2 more apartments to be completed, Wall tiling – 2 more apartments to be completed, Balcony handrail – 80% to be completed, Main stair handrail – 100% to be completed, parapet GI railing – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 1 no more to be completed, Centralised gas piping system – 60 apartments to be completed, Electrical LT work – wire pulling 2 more apartments to be completed
  • External Finishes – Windows and sliding doors – 85% to be completed, Duct door – 75% to be completed, External plastering B2 & B1 floor – 80% to be completed, Painting – primer 100% to be completed

Work status as on 08-12-2023, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet -completed, Ground floor parapet – completed, GF Landscape structure work – 50% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 99% completed, Ground floor – completed, GF duct brick work – 20% completed, Inside plastering – Basement 2 inside wall plastering completed, water tank plastering completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 85% completed, wall tiling – 72 apartments completed, flooring – 72 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 60% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 79 nos: completed, Centralised gas piping system – 46 apartments completed, fire fighting work – 1st to 11th floor – 100% completed, Electrical LT work – wire pulling – 79 apartments completed, HT work – 72 apartments completed, HVAC work – 14 apartments completed
  • Final Finishes – Door shutters & ironmongery – sample flat, 6G completed, Plumbing and Sanitary wares – sample flat, 6G, 2D completed, Electrical final fixtures – sample flat, 6G, 2D completed
  • External Finishes – Windows and sliding doors – 75% completed, duct door – 66% completed, External plastering – B2 & B1 floor – 40% completed. External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2023.

  • Structural Works – Ground floor Landscape structure work – 75% to be completed
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed, GF duct brick work – 100% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, Flooring – 2 more apartments to be completed, Wall tiling – 2 more apartments to be completed, Balcony handrail – 75% to be completed, Main stair handrail – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 2 nos more to be completed, Centralised gas piping system – 60 apartments to be completed, fire fighting work – 12th floor to be completed, Electrical LT work – wire pulling 2 more apartments to be completed
  • External Finishes – Windows and sliding doors – 85% to be completed, Duct door – 75% to be completed, External plastering B2 & B1 floor – 80% to be completed, Painting – primer 100% to be completed

Work status as on 10-11-2023, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet – 100% completed, Ground floor parapet – completed, GF Landscape structure work – 25% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 99% completed, Ground floor – completed, Basement 2 inside wall plastering completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 85% completed, wall tiling – 63 apartments completed, flooring – 62 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Main stair handrail – 60% completed, Balcony handrails – 40% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 76 nos: completed, , Centralised gas piping system – 17 apartments completed, fire fighting work – 1st to 11th floor – 100% completed, Electrical LT work – wire pulling – 68 apartments completed, HT work – 72 apartments completed, HVAC work – 14 apartments completed
  • External Finishes – Windows and sliding doors – 65% completed, duct door – 66% completed, External plastering – B2 & B1 floor – 40% completed. External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2023.

  • Structural Works – Ground floor Landscape structure work – 75% to be completed
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed.
  • Internal Finishes – Waterproofing – terrace 100% to be completed, Flooring – 2 more apartments to be completed, Wall tiling – 2 more apartments to be completed, Balcony handrail – 60% to be completed. Main stair handrail – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 4 nos more to be completed, fire fighting work – 12th floor to be completed, Electrical LT work – wire pulling 2 more apartments to be completed
  • External Finishes – Windows and sliding doors – 75% to be completed, Duct door – 75% to be completed, External plastering B2 & B1 floor – 60% to be completed. Painting – primer 100% to be completed

Work status as on 10-10-2023, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet – 100% completed, Ground floor parapet – 75% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 95% completed, Ground floor – completed, water tank plastering – 100% completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 85% completed, Sump tank – completed, OHT – Completed, wall tiling – 62 apartments completed, flooring – 62 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Balcony handrails – 40% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 76 nos: completed, Corridor handrail works – 95% completed, Centralised gas piping system – mockup only, fire fighting work – 1st to 11th floor – 100% completed, Electrical LT work – wire pulling – 68 apartments completed, HT work – 72 apartments completed, HVAC work – 14 apartments completed
  • External Finishes – Windows and sliding doors – 65% completed, duct door – 66% completed, External plastering – B2 & B1 floor – 25% completed. External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2023.

  • Structural Works – Ground floor parapet – 100% to be completed
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed. Basement 2 inside wall plastering 100% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, Flooring – 4 more apartments to be completed, Wall tiling – 4 more apartments to be completed, Balcony handrail – 60% to be completed. Main stair handrail – 100% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 4 nos more to be completed, Corridor handrail works – 100% to be completed, fire fighting work – 12th floor to be completed, Electrical LT work – wire pulling 5 more apartments to be completed
  • External Finishes – Windows and sliding doors – 75% to be completed, Duct door – 75% to be completed, External plastering B2 & B1 floor – 50% to be completed. Painting – primer 100% to be completed

Work status as on 13-09-2023, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet – 99% completed, Ground floor parapet – 50% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 85% completed, Ground floor – completed, water tank plastering – 100% completed
  • Internal Finishes – Main door – 82 apartments completed, Waterproofing – terrace – 85% completed, Sump tank – completed, OHT – Completed, wall tiling – 57 apartments completed, flooring – 56 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Balcony handrails – 25% completed
  • Electrical, Plumbing & Firefighting works – Main door – 82 apartments completed, Waterproofing – terrace – 85% completed, Sump tank – completed, OHT – Completed, wall tiling – 57 apartments completed, flooring – 56 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Balcony handrails – 25% completed
  • External Finishes – Windows and sliding doors – 50% completed, duct door – 66% completed, External plastering – 95% completed, External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2023.

  • Structural Works – basement 2 level parapet – 100% to be completed, Ground floor parapet – 75% to be completed
  • Civil Works – basement 2 level parapet – 100% to be completed, Ground floor parapet – 75% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, Flooring – 4 more apartments to be completed, Wall tiling – 4 more apartments to be completed, Balcony handrail – 35% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 6 nos: more to be completed, Corridor handrail works – 100% to be completed, fire fighting work – 12th floor to be completed, Electrical LT work – wire pulling 7 more apartments to be completed, HVAC work – 7 more apartments to be completed
  • External Finishes – Concealed plumbing works – 6 nos: more to be completed, Corridor handrail works – 100% to be completed, fire fighting work – 12th floor to be completed, Electrical LT work – wire pulling 7 more apartments to be completed, HVAC work – 7 more apartments to be completed

Work status as on 12-08-2023, we have completed the following.

  • Structural Works – Swimming pool wall – completed, basement 2 level parapet – 95% completed, Ground floor parapet – 35% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 75% completed, Ground floor – 95% completed, water tank plastering – 100% completed
  • Internal Finishes – Main door – 80 apartments completed, Waterproofing – terrace – 85% completed, Sump tank – completed, OHT – Completed, wall tiling – 53 apartments completed, flooring – 51 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed, Balcony handrails – 15% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 72 nos: completed, Corridor handrail works – 95% completed, Centralised gas piping system – mockup only, fire fighting work – 1st to 10th floor – 100% completed, Electrical LT work – wire pulling – 60 apartments completed, HT work – 66 apartments completed, HVAC work – 14 apartments completed
  • External Finishes – Windows and sliding doors – 40% completed, duct door – 65% completed, External plastering – 95% completed, External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of AUGUST 2023.

  • Structural Works – basement 2 level parapet – 100% to be completed, Ground floor parapet – 50% to be completed
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed, Ground floor – 100% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, Flooring – 4 more apartments to be completed, Wall tiling – 4 more apartments to be completed, Balcony handrail – 25% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 6 nos: more to be completed, Corridor handrail works – 100% to be completed, fire fighting work – 11th floor to be completed, Electrical LT work – wire pulling 7 more apartments to be completed, HVAC work – 7 more apartments to be completed
  • External Finishes – Windows and sliding doors – 50% to be completed, Duct door – 75% to be completedExternal plastering – 100% to be completed, Painting – primer 100% to be completed

Work status as on 12-07-2023, we have completed the following.

  • Structural Works – Swimming pool wall – 100% completed, basement 2 level parapet – 90% completed, Ground floor – completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 75% completed, Ground floor – 90% completed
  • Internal Finishes – Main door – 80 apartments completed, Waterproofing – terrace – 85% completed, Sump tank – 100% completed, OHT – Completed, wall tiling – 43 apartments completed, flooring – 40 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 72 nos: completed, Corridor handrail works – 95% completed, Centralised gas piping system – mockup only, fire fighting work – 2nd to 10th floor – 100% completed, Electrical LT work – wire pulling – 47 apartments completed, HT work – 34 apartments completed, HVAC work – 4th floor completed
  • External Finishes – Windows and sliding doors – mockup only, duct door – 50% completed, External plastering – 95% completed, External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of JULY 2023.

  • Structural Works – basement 2 level parapet – 100% to be completed
  • Civil Works – Masonry – Masonry – Block/Brick – basement 2 floor – 100% to be completed, Ground floor – 100% to be completed
  • Internal Finishes – Waterproofing – terrace 100% to be completed, Flooring – 5 more apartments to be completed, Wall tiling – 7 more apartments to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 6 nos: more to be completed, Corridor handrail works – 100% to be completed, fire fighting work – 11th floor to be completed, Electrical LT work – wire pulling 7 more apartments to be completed, HVAC work – 5th floor to be completed
  • External Finishes – Duct door – 75% to be completedExternal plastering – 100% to be completed, Painting – primer 100% to be completed

Work status as on 06-06-2023, we have completed the following.

  • Structural Works – Swimming pool wall – 100% completed, basement 2 level parapet – 90% completed, Ground floor – completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 75% completed, Ground floor – 90% completed
  • Internal Finishes – Main door – 80 apartments completed, Waterproofing – terrace – 75% completed, Sump tank – 100% completed, OHT – 75% Completed, wall tiling – 43 apartments completed, flooring – 40 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 72 nos: completed, Corridor handrail works – 95% completed, Centralised gas piping system – mockup only, fire fighting work – 2nd to 10th floor – 100% completed, Electrical LT work – wire pulling – 45 apartments completed, HT work – cable tray work started
  • External Finishes – Windows and sliding doors – mockup only, External plastering – 95% completed, External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2023.

  • Structural Works – basement 2 level parapet – 100% to be completed,
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed, Ground floor – 100% to be completed
  • Internal Finishes – Maindoor – 3 more numbers to be fixed, Waterproofing – OHT Tank – 100% to be completed, terrace 85% to be completed, Flooring – 5 more apartments to be completed, Wall tiling – 7 more apartments to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 6 nos: more to be completed, Corridor handrail works – 100% to be completed, Electrical LT work – wire pulling 7 more apartments to be completed
  • External Finishes – External plastering – 100% to be completed, Painting – primer 100% to be completed

 

Work status as on 05-05-2023, we have completed the following.

  • Structural Works – Swimming pool wall – 100% completed, basement 2 level parapet – 90% completed, Ground floor – 90% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 75% completed, Ground floor – 80% completed
  • Internal Finishes – Main door – 63 apartments completed, Waterproofing – terrace – 40% completed, Sump tank – 100% completed, wall tiling – 43 apartments completed, flooring – 37 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 72 nos: completed, Corridor handrail works – 95% completed, Centralised gas piping system – mockup only, fire fighting work – 2nd to 10th floor – 100% completed, Electrical LT work – wire pulling – 40 apartments completed, HT work – cable tray work started
  • External Finishes – Windows and sliding doors – mockup only, External plastering – 95% completed, External painting – primer 95% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2023.

  • Structural Works – basement 2 level parapet – 100% to be completed, Ground floor – 100% to be completed
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed, Ground floor – 100% to be completed
  • Internal Finishes – Maindoor – 11 more numbers to be fixed, Waterproofing – OHT Tank – 75% to be completed, terrace 75% to be completed, Flooring – 5 more apartments to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 6 nos: more to be completed, Electrical LT work – wire pulling 7 more apartments to be completed
  • External Finishes – External plastering – 100% to be completed, Painting – primer 100% to be completed

Work status as on 08-04-2023, we have completed the following.

  • Structural Works – Swimming pool wall – 100% completed, basement 2 level parapet – 90% completed, Ground floor – 90% completed
  • Civil Works – Ceiling and wall plastering 85% completed, Masonry – Block/ brick- Basement 1 floor 100% completed, basement 2 floor – 75% completed, Ground floor – 75% completed
  • Internal Finishes – Main door – 56 apartments completed, Waterproofing – 15th floor – 75% completed, terrace – 40% completed, Sump tank – 75% completed, wall tiling – 43 apartments completed, flooring – 35 apartments completed, putty works – 100% completed, Door frame fixtures- 100% completed, Handrails – fire stair handrail – 100% Completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 72 nos: completed, Corridor handrail works – 95% completed, Centralised gas piping system – mockup only, fire fighting work – 2nd to 10th floor – 100% completed, Electrical LT work – wire pulling – 35 apartments completed, HT work – cable tray work started
  • External Finishes – Windows and sliding doors – mockup only, External plastering – 95% completed, External painting – primer 90% completed
  • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer 100% completed, HVAC -100% completed, Flooring – 100% completed, balcony handrail – 100% completed, duct door – 100% completed.

As per the current work status from our site, we are targeted to complete the following works by the end of APRIL 2023.

  • Structural Works – basement 2 level parapet – 100% to be completed, Ground floor – 100% to be completed
  • Civil Works – Masonry – Block/Brick – basement 2 floor – 100% to be completed, Ground floor – 100% to be completed
  • Internal Finishes – Maindoor – 18 more numbers to be fixed, Waterproofing – sump tank – 100% to be completed, terrace 75% to be completed, Flooring – 5 more apartments to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 6nos: more to be completed, Electrical LT work – wire pulling 7 more apartments to be completed
  • External Finishes – External plastering – 100% to be completed, Painting – primer 95% to be completed

Click here to see the previous work progress updates.

Structure
  • Deep pile foundation complying with seismic 3 zone
  • RCC frame structure with brickwork and or concrete block partitions.
  • Concrete grade and Steel grade as per structural consultant’s advice.
Flooring, Tiling & Railings
  • Main entrance lobby, Lift lobby and Lift fascia (wall & floor) using composite
    marble / granite / vitrified tiles, as per the architect’s design.
  • Staircases using granite / vitrified tile flooring with hand railing using matt finished SS / MS with or without toughened glass as per architect’s design.
  • Car Park Area: Grano flooring with grooves or exterior grade paving tiles.
  • Foyer / Living / Dining using 80cm X 80cm Premium Double charged vitrified tiles. [Kajaria / Asian or equivalent).
  • Kitchen: 60cm X 60cm premium double charged Vitrified tiles for the flooring (Kajaria/ Asian or equivalent)
  • Master Bed Room: Laminated wooden flooring AC4 Grade. All other bed rooms 60cmx60cm Premium Double Charged Vitrified tiles.
  • All Bed room Toilets: Designer ceramic tile concepts 30cm X 30cm for floor and 60cm X 30cm for walls up to ceiling height of 8’ 0.
  • Servants Toilet : Ceramic tile 30cm X 30cm for floor and 30cm X 45cm for walls upto 8’0” height.
  • Utility Room: 30cm X 30cm for floor and 30cm X 45cm for (kitchen wall) walls upto 4’6” height and 2’ above the counter if any. (using any premium Indian brands).
  • Balconies / Open Terraces / Decks : Rustic / antiskid / ceramic tiles 30cm X 30cm or (wood finished vitrified tiles) with MS / SS / Toughened Glass railings upto 1.2M heights. (using any premium Indian brands)
Sanitary & Plumbing
  • Sanitary fittings: will be of KOHLER, ROCCA or equivalent.
  • All Sanitary wares shall be of white colour only.
  • Concealed cisterns (concealed flushing system) will be of GEBERIT from Switzerland or GROHE from Germany or equivalent make. Actuator plates shall be in CP Finish dual flushing system
  • Faucets: for all the bed room toilets will be single lever concealed diverters CP finish, heavy body metal fittings of ROCA from Spain or GROHE from Germany or equivalent make.
  • Provision for hot water connection shall be provided for overhead shower (30cm X 30cm over head rain shower for master bed toilet and multi function over head shower in other toilets, normal shower for servant toilet).
  • Wall mounted single lever faucet make ROCA from Spain or GROHE from Germany will be provided for the wash basins, Kitchen and utility area sink.
  • Plumbing: All water supply lines shall be in ISI marked CPVC pipes. Drainage lines and storm water drain pipes shall be in PVC, Cockroach traps make CHILLI shall be provided as gratings for all necessary locations, Health Faucet ROCA from Spain or GROHE from Germany shall be provided near EWC in all the toilets.
  • Stainless Steel Sink multi bowl with drain board of make NIRALI / FRANKE or equivalent make shall be provided for the kitchen and stainless steel sink without drain board shall be provided for the utility areas
  • Towel rods, towel ring, soap dish shall be provided inside the toilets.
Doors & Windows
  • Window shutters: Prefabricated colour Anodised aluminum sliding shutters .One pane of Insect screen also shall be provided in each window.
  • Door Frames: Main door frame and shutter shall be of seasoned teak wood. Outer and Inner face to be PU coated and finished as per the Architects design.
  • Door Shutters: All internal door frames shall be of seasoned hard wood with flush door shutters. All internal and external faces shall be melamine finish or Paint finish as per the Architects design.
  • Hardware: All hardware shall be in C.P Brass, tower bolts, doorstoppers, ball bearing hinges. Locks shall be mortise of DORSET / YALE make from USA or equivalent.
  • Entrance door shall have hardware such as, Magic Eye, Safety Chain, Door Stopper and a BIO Metric lock from SAMSUNG or equivalent.
Electrical
  • Concealed copper wiring using FINOLEX / V-GUARD / HAVELLS make cables with modular plate switches, centralized cabling system for all electrical and communication requirements.
  • Wiring shall be done for lighting, 5Amps, 15 Amps and AC points in the Apartment.
  • Switches: All switches shall be LEGRAND – ARTEOR make or equivalent.
  • Generator: Power backup will be provided for all common services and selected light and fan point in each living, bedrooms inside apartment and a refrigerator point, plus additional one 5Amp plug point in the Kitchen, one light point in all the toilets, one 5Amp plug point at Living for emergency charging of devices shall be provided (Air-conditioning and Geyser points and other 15Amp points will not be considered for the power back up).
  • Exhaust Fan in toilets.
  • Light fixtures for the Common areas, external areas, apartment balconies and at entrance door of the individual apartments shall be provided.
  • All light fixtures shall be of PHILIPS / HAVELLS or equivalent.
  • Adequate ELCB and MCB shall be provided in each apartments SIEMENS /HAVELLS or equivalent.
  • Provision for the GEYSER points and fresh air fans shall be provided for all toilets.
  • Provision for telephone and Internet shall be provided in the living room and master bed room.
  • Provision for Cable TV / DTH shall be provided in the Living and Master Bed room.
Paint Finishes
  • Premium emulsion paint shall be applied for the ceiling and interior walls of the apartments excluding Utility and Services.
  • Internal Walls: Acrylic / cement based Putty with Premium emulsion paint.
  • External Walls: Weather shield exterior grade emulsion / texture paint.
Elevator/s
  • Elevators: High Speed lift shall be provided as per the Govt. norms in each core with automatic doors & SS brush finish of KONE / SCHINDLER or reputed make.
  • ARD (Automatic Rescue Device) shall be installed in the passenger lift as a premium feature.
Air Conditioning
  • Ductable Air-Conditioning in Living/Dining room.
  • Split Air -Conditioning for Bedrooms
Home Automation
  • Multi level security systems for common areas and lobbies, Access control entry to the
    common entrance / foyers and gymnasium
  • Light motion sensors for selected common areas
  • Home security monitoring, gas leakage detectors, emergency panic intrusion alarm,
    visitor tracking
Landscaping
  • Provision for sprinklers and a drip system shall be provided for necessary common area landscaping.
  • Interlock Pavers to be laid in driveways and walkways.
  • Hard and soft landscaping shall be provided as per the landscape consultant’s design.

Disclaimer: Artech Realtors PVT LTD, reserves the right to change / alter /delete the brands specified above, subject to its availability to an equivalent and competitive product.

Are you on the lookout for a home loan? We can help you. We have tie-ups with prominent banks for this project. It will help you make the loan application process easier.

Luxury Flats in Jawahar Nagar, Trivandrum

Imagine living in a luxury home that’s surrounded by greenery all year round, a home that offers verdant green views every time you step out, even if it’s onto the balcony of an apartment! In a joint venture with B’ Canti, Artech Realtors have made this dream into a reality with Kerala’s Greenest dream apartment project appropriately named ‘Artech Rainforest’.

These 78 luxury apartments in Jawahar Nagar are considered to be located in one of the most prestigious areas in Trivandrum, the neighborhood where the ‘crème de la crème’ of the city reside. You have never seen anything like these apartments in Jawahar Nagar before, with their amazing collection of lifestyle-enhancing amenities that include sauna/steam bath, swimming pool, spa, health club, fully-furnished guest suites for overnight guests, reticulated gas service, etc.

With Trivandrum city expanding rapidly along with the briskly-growing IT hub as well as the upcoming Vizhinjam international port, the demand for flats in Trivandrum has also been going up accordingly – especially as this capital city is unlike other capital cities as it is comparatively more peaceful, crime-free, pollution-free and rich in culture, natural beauty as well as civic and social infrastructure. For those on the lookout, there are multiple flats for sale in Jawahar Nagar, including the exquisitely designed Artech Rainforest flats that are located in a well-connected area in this safe neighborhood. What’s more, these homes come in thoughtful variants as 3 and 4 BHK apartments in Jawahar Nagar, so that there is an option available for all family sizes!

RELATED PROJECTS

DISCLAIMER

The information provided on this website is meant for general guidance. Though we have taken utmost care on the accuracy of the contents, the customer should make an autonomous assessment of the contents. However, the prospective buyers should rely upon the terms and conditions of the sale and construction agreement between the Builder and the Client.

The visuals of the projects symbolize artistic impression only. The information contained herein including the fittings, finishes, features, floor size and color etc. in the visuals are subject to change. However, the plans & specifications indicated in the Builder and Client agreements are final and we have not authorized anyone to make any oral commitments or promises on our behalf in regard to the plans and specifications of the apartments/projects.

For any clarification please feel free to call +91 9847 600 600 or walk into our offices. Our representatives will always be at your service.