Artech Life Spaces

Project Description

Artech Realtors, the leading real-estate builder in Trivandrum presents Artech Life Spaces – a luxurious apartment project near Infosys campus, Trivandrum.

This is Artech Realtor’s 65th project and it is all set to redefine luxury as you know it. Life Spaces is envisioned as one of ‘Kerala’s ultimate leisure lifestyle’ destination and will offer 2, 2+ Study, 3 and 4 BKH apartments just 5 minutes away from Technopark.

In addition to the well-appointed apartments, Artech Life Spaces will have a game room equipped with the latest gadgets to take the excitement to a new level. There will be an indoor badminton court and a virtual golf course to ensure that you stay healthy and fit. An exclusive beauty salon and a jacuzzi will help you relax or go in for a total makeover when you are stressed out.

Situated on the bypass, just 5 minutes away from Technopark, Artech Life Spaces is just a 15-minute drive from the Trivandrum International Airport.

Artech Life Spaces will bring you a new dimension of leisure living.

Categories: ,

Quick Enquire

Take your first few steps towards finding the ultimate happiness of the Perfect Home.


Amenities

  1. INDOOR BADMINTON COURT
  2. BANQUET HALL
  3. BEAUTY SALON
  4. AV ROOM
  5. LAUNDRY
  6. VIRTUAL GOLF
  7. GAMES ROOM
  8. MEETING ROOM
  9. BUSINESS CENTRE
  10. LIBRARY
  11. TUITION ROOM
  12. GUEST ROOMS
  13. GUEST SUITE
  14. CRECHE
  15. PLAY STATION
  16. SAUNA FOR GENTS AND LADIES
  17. JACUZZI FOR GENTS AND LADIES
  18. AIR-CONDITIONED UNISEX GYM
  19. SWIMMING POOL FOR ADULTS AND KIDS
  20. CHILDREN PLAY AREA
  21. ROOFTOP PARTY AREA
  22. FEATURE ARRIVAL COURT
  23. VERTICAL GREEN WALL
  24. SECURITY KIOSK
  25. TRELIS AT TOWER ENTRY
  26. SKATING RINK
  27. BUTTERFLY GARDEN
  28. PATHWAY/JOGGING TRACK
  29. YOGA COURT
  30. LAZY LAWNS
  31. LILY POND/REFLECTIVE POOL
  32. PODIUM MEETING PLAZA
  33. CHESS COURT
  34. SENIOR CITIZEN CORNER
  35. PRIVACY PLANTING
  36. INTERACTIVE COURT

Specification

Structure

  • Column footing complying with seismic 3 zone.
  • RCC frame structure with brickwork and or concrete block partitions. Concrete grade and Steel grade as per structural consultant’s advice.

 

Flooring, Tiling & Railings

  • Main entrance lobby, Lift lobby and Lift fascia (wall & floor) using composite marble / granite / vitrified tiles, as per the architect’s design.
  • Staircases using granite / vitrified tile flooring with hand railing using SS / MS / GI  with or without toughened glass as per architect’s design.
  • Car park Area: Grano flooring with grooves or exterior grade paving tiles.
  • Foyer / Living / Dining using 80cm X 80cm Premium Double charged vitrified tiles (Kajaria / Asian).
  • Kitchen: 60cm X 60cm premium double charged Vitrified tiles for the flooring (Kajaria / Asian / Somany).
  • All Bedrooms : 60cm X 60cm Premium Double Charged Vitrified tiles (Kajaria / Asian / Somany).
  • All Bed room Toilets : Designer ceramic tile concepts 30cm X 30cm for floor and 60cm X 30cm for walls up to ceiling height of 8’ 0.
  • Servants Toilet : Ceramic tile 30cm X 30cm for floor and 30cm X 45cm for walls upto 7’6″ height.
  • Utility Room : 30cm X 30cm for floor and 30cm X 45cm for (kitchen wall) walls at a height of 2’ above the counter if any (using any premium Indian brands).
  • Balconies / Open Terraces / Decks : Rustic / Antiskid / ceramic tiles 30cm X 30cm or (wood finished vitrified tiles) with SS / MS / GI  with or without toughened glass as per architect’s design upto 1.2m heights (using any premium Indian brands).  

 

Sanitary & Plumbing

  • Sanitary fittings: will be of KOHLER or ROCA.
  • All Sanitary wares shall be of white colour only.
  • Concealed cisterns (concealed flushing system) will be of GEBERIT from Switzerland or GROHE from Germany. Actuator plates shall be in CP Finish dual flushing system.
  • Faucets: for all the bed room toilets will be single lever concealed diverters CP finish, heavy body metal fittings of ROCA from Spain or GROHE from Germany or KOHLER. Provision for hot water connection shall be provided for overhead shower.
  • Wall mounted single lever faucet make ROCA from Spain or GROHE from Germany or KOHLER will be provided for the wash basins, Kitchen and utility area sink.
  • Plumbing: All water supply lines shall be in ISI marked CPVC pipes. Drainage lines and storm water drain pipes shall be in PVC, Cockroach traps make CHILLI shall be provided as gratings for all necessary locations, Health Faucet ROCA from Spain or GROHE  from Germany or KOHLER shall be provided near EWC in all the toilets.
  • Stainless Steel Sink multi bowl with drain board of make NIRALI / FRANKE shall be provided for the kitchen and stainless steel sink without drain board shall be provided for the utility areas.
  • Towel rods, towel ring, soap dish shall be provided inside the toilets.

 

Doors & Windows

  • Window shutters: Prefabricated colour anodised aluminum sliding shutters by (Hindalco). One pane of Insect screen also shall be provided in each window.
  • Door Frames: Main door frame and shutter shall be of seasoned teak wood. Outer and Inner face to be PU coated and finished as per the Architect’s design.
  • Door Shutters: All internal door frames shall be of seasoned hard wood with flush door shutters. All internal and external faces shall be melamine finish or Paint finish as per the Architects design.
  • Hardware: All hardware shall be in C.P Brass, tower bolts, doorstoppers, ball bearing hinges. Locks shall be mortise of DORSET / YALE make from USA or equivalent.
  • Entrance door shall have hardware such as, Magic Eye, Safety Chain, Door Stopper and a BIO Metric lock from HAFELE or YALE.

 

Electrical

  • Concealed copper wiring using FINOLEX / V-GUARD / HAVELLS make cables with modular plate switches, centralized cabling system for all electrical and communication requirements.
  • Wiring shall be done for lighting, 6 Amps, 16 Amps and AC points in the Apartment.
  • Switches: All switches shall be LEGRAND or SCHNEIDER.
  • Generator: Power backup will be provided for all common services and selected light and fan point in each living, bedrooms inside apartment and a refrigerator point, plus additional one 6 Amp plug point in the Kitchen, one light point in all the toilets, one 6 Amp plug point at Living for emergency charging of devices shall be provided (Air-conditioning and Geyser points and other 16 Amp points will not be considered for the power back up).
  • Light fixtures for the Common areas, external areas, apartment balconies and at entrance door of the individual apartments shall be provided.
  • All light fixtures shall be of PHILIPS / HAVELLS.
  • Adequate ELCB and MCB shall be provided in each apartments SIEMENS / HAVELLS.
  • Provision for the GEYSER points and fresh air fans shall be provided for all toilets.
  • Provision for telephone and Internet shall be provided in the living room and master bed room.
  • Provision for Cable TV / DTH shall be provided in the Living and Master Bed room.

 

Paint Finishes:

  • Premium emulsion paint shall be applied for the ceiling and interior walls of the apartments excluding Utility and Services.
  • Internal Walls: Acrylic / cement based Putty with Premium emulsion paint.
  • External Walls: Weather shield exterior grade emulsion / texture paint.

 

Elevator/s

  • Elevators: High Speed lift shall be provided as per the Govt. norms in each core with automatic doors & SS brush finish of KONE  / SCHINDLER or MITSUBISHI.
  • ARD (Automatic Rescue Device) shall be installed in the passenger lift as a premium feature.

 

Air Conditioning

  • Provision for Air-Conditioning in Living, Dining and all bed rooms.

 

Home Automation:

  • Multi level security systems for common areas and lobbies, Access control entry to the common entrance / foyers and gymnasium.
  • Light motion sensors for selected common areas.
  • Home security monitoring, gas leakage detectors, emergency panic intrusion alarm, visitor tracking.

 

Landscaping

  • Provision for sprinklers and a drip system shall be provided for necessary common area landscaping.
  • Interlock Pavers to be laid in driveways and walkways.
  • Hard and soft landscaping shall be provided as per the landscape consultant’s design.

Concept Images

Location map

Floor Plans

Progress

Work Schedule for the Month of July 2018 .

    • Rock breaking work at Tower D portion- 100% to be completed
    • Footing work – 100% to be completed
    • RCC for structure (Podium slab) – 95% to be completed
    • 1st floor Slab rcc work – 60% to be completed
    • Earth work excavation at Tower C portion- 100% to be completed
    • Rock breaking work at Tower C portion- 100% to be completed

Work status as on 05-06-2018, we have completed the following.

    • Earth work excavation at Tower D portion- 100% completed
    • Rock breaking work at Tower D portion- 95% completed
    • Footing work – 90% completed
    • 1st floor column steel work – started
    • Earth work excavation at Tower C portion- 65% completed
    • Rock breaking work at Tower C portion – 65% completed

As per the current work status from our site we are targeted to complete the following works by end of May 2018.

  • Earth work excavation at Tower D portion- 100% to be completed
  • Rock breaking work at Tower D portion- 100% to be completed
  • Footing work – 80% to be completed
  • Earth work excavation at Tower C portion- 100% completed
  • Rock breaking work at Tower C portion- 100% completed

Work status as on 05-05-2018, we have completed the following.

  • Earth work excavation at Tower D portion- 95% completed
  • Rock breaking work at Tower D portion- 95% completed
  • Footing work – 65% completed
  • RCC for structure – 20% completed
  • Earth work excavation at Tower C portion- 50% completed
  • Rock breaking work at Tower C portion- 35% completed

As per the current work status from our site we are targeted to complete the following works by end of April 2018

  • Earth work excavation at Tower D portion- 100% to be completed
  • Rock breaking work at Tower D portion- 100% to be completed
  • Footing work – 60% to be completed
  • Earth work excavation at Tower C portion- 100% completed
  • Rock breaking work at Tower C portion- 100% completed

Work status as on 1 9 -0 4-2018, we have completed.

  • Earth work excavation at Tower D portion- 95% completed
  • Rock breaking work at Tower D portion- 95% completed
  • Footing work – 40% completed
  • Earth work excavation at Tower C portion- 35% completed
  • Rock breaking work at Tower C portion- 30% completed

As per the current work status from our site we are targeted to complete the following works by end of March 2018

  • Earth work excavation at Tower D portion- 100% to be completed
  • Rock breaking work at Tower D portion- 100% to be completed
  • Footing work – 60% to be completed
  • Earth work excavation at Tower C portion- 100% completed
  • Rock breaking work at Tower C portion- 100% completed


Work status as on 1 3 -0 3 -2018, we have completed.

    • Earth work excavation at Tower D portion- 90% completed
    • Rock breaking work at Tower D portion- 90% completed
    • Footing work – 30% completed
    • Earth work excavation at Tower C portion- 30% completed
    • Rock breaking work at Tower C portion- 20% completed

BANK APPROVAL

Are you on the lookout for a home loan? We can help you. We have tie-ups with prominent banks for this project. It will help you make the loan application process easier.

The scenic capital of Kerala, Trivandrum is home to a rapidly expanding IT sector and is soon touted to become the country’s largest IT hub. This has also resulted in more and more people migrating into the city, with their housing needs going up. As majority of these IT companies are located off the city’s bypass-road, the population of apartments in Technopark/Infosys area is going up too, providing easily accessible homes for these people.

The good thing about living off the bypass-road is that you get access to lots of open spaces and areas that are free of pollution. And to top it all, those living in apartments in the Technopark/Infosys area can also enjoy amazing vistas of the sea from their homes! Living off the highway in no way hampers its inhabitants from accessing the central city areas as there are numerous roads entering into the city from this area. A number of good schools and multi-specialty hospitals are located within a few minutes driving distance from this location too.

What’s more, you can get to the Trivandrum International Airport within 15 minutes too. As most of the flats in Technopark/Infosys area cater to the savvy techies, premium home builders like Artech Realtors are crafting flats that come with a plethora of exclusive amenities, home automation as well as modern designs.

If you are looking for homes that redefine luxury and offer a new dimension of leisure living, head towards Artech flats in Technopark/Infosys area.