Artech Avantika

Project Description

Artech Avantika – a private Eden set in the midst of the quiet charm of Vellayambalam, provides a modern, contemporary and luxurious lifestyle nestled in the warm embrace of nature’s many delights. Located at Udarashiromani Road on the Vellayambalam – Vazhuthacaud stretch in Trivandrum, Artech Avantika brings to you 2 and 3 BHK apartments designed to let in an abundance of natural light. The project is equipped with multiple leisure amenities like a Fully Air-Conditioned Unisex Gym, Badminton Court, Toddlers park, Guest Suites, Amphitheatre, Rooftop Party Area, etc.

 

Quick Enquire

Take your first few steps towards finding the ultimate happiness of the Perfect Home.


Location

Artech Avantika is located at Udarashiromani Road on the Vellayambalam – Vazhuthacaud stretch in Trivandrum. It can also be accessed via Palottukonam road on Vazhuthacaud – Edapazhinji stretch.The location is well packed with all the facilities within easy reach and is therefore the perfect location for the residential abode. Trivandrum central railway station and International airport are in close proximity to the location, only 3 km & 9 km respectively.

Artech Avantika, Vellayambalam - Location

Layout

Specification

A grand entrance lobby, stately corridors & elevators, multiple leisure amenities, and an overall plush campus…these are only a few of the wonders that awaits you at Artech Avantika. Inside your private living space, an air of sophistication surrounds you. The living, dining and bedrooms are specially designed to let in an abundance of natural light, creating a sprightly, effervescent and spacious living sanctuary. Neither expense nor attention has been spared to ensure that the interiors are furnished with elegant designer fittings. These exquisite details put the finishing touches on your perfect home.
With spacious planning in 2 & 3 BHK variants ranging from 1150 – 1850 Sq.ft. to choose from, you are certain to find a perfect space suiting your needs at Artech Avantika to call your own.

Structure

RCC framed structure designed for higher seismic consideration with pile foundation.

Flooring & Tiling
  • Foyer/ Living/ Dining – Premium quality vitrified tiles of size 80 x 80 cm.
  • Bedroom – Premium quality vitrified tiles of size 60 x 60 cm.
  • Master Bedroom laminate wooden flooring.
  • Master Bathroom and other Toilets – Designer ceramic tile concept of size 30 x 30 cm for floor and 30 x 60 cm for walls up to 7’0″.
  • Kitchen – 60 x 60 cm vitrified tile and 30 x 45 cm for walls up to 4’6″ height or 2′ above the counter if any.
  • Balconies/ Open Terraces/ Decks – Rustic/ Antiskid/ Ceramic tiles of size 30 x 30 cm.
Kitchen
  • Superior quality granite for counter top.
  • Single bowl stainless steel sink with single drain board in the kitchen and single bowl stainless steel sink in work area.
  • Provision for water purifier.
Sanitaryware and CP Fittings
  • Roca or equivalent sanitary wares.
  • Imported concealed cistern in all attached toilets.
  • Grohe or equivalent brand diverters for master toilet.
  • Towel rods, towel rings, soap dish and health faucets shall be provided inside the toilets.
Doors and Windows
  • Elegant teakwood entrance door with hardwood frames and architrave with imported hardware and entrance door with number lock system.<l/i>
  • All internal door frames shall be of hardwood with flush door shutters.
  • Powder coated aluminium heavy duty four track sliding window with mosquito net, MS grill and glazed sliding door for balconies.
Painting
  • Polished front doors and internal doors.
  • Double coat plastic emulsion over putty for entire walls except toilets.
  • Double coats emulsion for ceiling
  • Two coat enamel paint for grills.
Electrical
  • Concealed wiring with superior quality PVC insulated copper cables and Clipsal neo
  • c-metro equivalent modular type switches, adequate light and fan points.
  • Four 16A power plug points controlled by ELCB and MCB.
  • Independent energy meter for each apartment.
  • Provision for geyser connection in all attached toilets.
  • Provision for washing machine in work area.
  • Provision for Internet connection in any one bedroom.
Air Conditioner
  • Split AC provision including cabling for all bedrooms and living and dining.
Telephone
  • Provision for telephone in living room and all bed rooms.
Cable TV
  • Provision for Cable TV in living room, master bedroom.
Lift
  • High speed passenger and stretcher lift – Kone or equivalent.
Generator
  • Generator back-up for lifts, common areas, pumps and eight designated points within the apartments with automatic change over.
Water Supply
  • Water supply through underground sump tank and overhead tank with sufficient storage capacity, treated drinking water with reverse osmosis filters.
Home Automation
  • Access control entry to the common entrance, foyer and gymnasium.
  • Multi level security system for common areas and lobbies.
  • CCTV for parking and entrance lobby at ground floor.
  • Boom barriers at entry/ exit of the complex.
  • Gas leakage detectors.

Amenities

Artech Avantika empowers you with all the lifestyle needs right at home, the sprawling landscape and the plush environs whistle inviting welcomes every time you come home. Engaging you with facilities from a gymnasium to Indoor games, whether fulfilling individual pursuit or bridging relationships with your loved ones, every wish is easily transformed into reality.

Some of the amenities include:
  • Fully equipped Air-Conditioned Unisex Gym
  • Badminton Court
  • Amphi-theatre
  • Toddlers Park
  • Guest Suite
  • Audio Visual Room
  • Multipurpose Hall
  • Rooftop Party Area
  • Drivers Restroom
  • Reticulated LPG Supply

Progress

As per the current work status from our site we are targeted to complete the following works by end of April 2018

  • Internal wall plastering work – 100% to be completed
  • Inside painting work (1st coat) -100% to be completed
  • Inside painting work (2nd coat) -100% to be completed
  • External wall plastering work – 100% to be completed
  • External painting work- 100% to be completed
  • Electrical work – 100% to be completed
  • Electrical HT work – 100% to be completed
  • Inside putty work – GF -100% to be completed
  • Plumbing work – 100% to be completed
  • CP sanitary fixing work – 100% to be completed
  • Door shutter fixing- 100% to be completed

Work status as on ​16-04-2018, we have completed the following.

  • Internal wall plastering work – GF (95% completed);1st to Terrace floor (100% completed)
  • Inside painting work (1st coat) -1st to 16th floor(100% completed)
  • Inside painting work (2nd coat) -1st floor(50% completed);2nd floor(25% completed);5th floor(50% completed);6th,7th,8th,10th & 12th floor(25% completed)
  • External wall plastering work – GF (100% completed);1st to Terrace floor (100% completed); Carparking area (90% completed)
  • External painting work- 1st floor(85% completed); 2nd floor(95% completed); 3rd floor to Terrace floor(90% completed)
  • Electrical LT work – GF (80% completed);1st to Terrace floor (100% completed)
  • Electrical HT work – 95% completed
  • Inside putty work – GF (95% completed); 1st to Terrace floor (100% completed)
  • Tiling work- 1st to 16th floor-100% completed
  • Plumbing work – GF (90% completed); 1st to Terrace floor (100% completed)
  • CP sanitary fixing work – 1st floor (50% completed); 2nd floor (25% completed);5th floor(50% completed); 7th,8th,10th & 12th floor(25% completed)
  • Aluminium Windows and Ventilators – 1st floor to 16th floor (100% completed)
  • Door shutter fixing- 1st floor to 15th floor(100% completed); 16th floor(90% completed);
  • Water Proofing work – 1st to terrace floor -100% completed
  • Yard work- 95% completed

​​As per the current work status from our site we are targeted to complete the following works by end of March 2018

  • Internal wall plastering work – 100% to be completed
  • Inside painting work(1st coat) -100% to be completed
  • External wall plastering work – 100% to be completed
  • Putty work – GF -100% to be completed
  • Electrical work – GF -100% to be completed
  • Electrical HT work – 100% to be completed
  • Aluminium Windows and Ventilators – 100% to be completed
  • Door shutter fixing- 100% to be completed
  • Plumbing work – 100% to be completed
  • CP sanitary fixing work – 1st & 2nd floor 100% to be completed
  • Yard work- 100% to be completed

​Work status as on ​10-03-2018, we have completed the following.

  • Internal wall plastering work – GF (90% completed);1st to Terrace floor (100% completed)
  • Inside painting work(1st coat) -1st to 16th floor(100% completed)
  • External wall plastering work – GF (80% completed);1st to Terrace floor (100% completed); Carparking area (75% completed)
  • Putty work – GF (90% completed); 1st to Terrace floor (100% completed)
  • Electrical LT work – GF (60% completed);1st to Terrace floor (100% completed)
  • Electrical HT work – 85% completed
  • Aluminium Windows and Ventilators – 1st floor(100% completed);2nd floor(95% completed);3rd & 4th(90% completed);5th floor(80% completed);6th floor(95% completed);7th,8th & 9th floor(100% completed);10th to 16th floor(95% completed)
  • Door shutter fixing- 1st floor(90% completed);2nd to 13th floor(100% completed);14th & 16th floor(90% completed);15th floor(100% completed)
  • Tiling work- 1st to 16th floor-100% completed
  • Water Proofing work – 1st to terrace floor -100% completed
  • Plumbing work – GF (85% completed); 1st to Terrace floor (100% completed)
  • CP sanitary fixing work – 1st(50% completed); 2nd floor (25% completed);5th,7th,8th &12th floor(25% completed)
  • Yard work- 90% completed

As per the current work status from our site we are targeted to complete the following works by end of February-2018

  • Internal wall plastering work – 100% to be completed
  • Inside painting work(1st coat) -100% to be completed
  • Electrical work – GF -100% to be completed
  • Electrical HT work – 100% to be completed
  • Putty work – GF -100% to be completed
  • External wall plastering work – 100% to be completed
  • Plumbing work – 100% to be completed
  • CP sanitary fixing work – 1st & 2nd floor 100% to be completed
  • Aluminium Windows and Ventilators – 100% to be completed
  • Door shutter fixing- 100% to be completed
  • Yard work- 100% to be completed

Work status as on 10-​​02-2018, we have completed.

  • Internal wall plastering work – GF (90% completed);1st to Terrace floor (100% completed)
  • Inside painting work(1st coat) -1st to 16th floor(100% completed)
  • Electrical LT work – GF (60% completed);1st to Terrace floor (100% completed)
  • Electrical HT work – 85% completed
  • Putty work – GF (90% completed); 1st to Terrace floor (100% completed)
  • External wall plastering work – GF (80% completed);1st to Terrace floor (100% completed); Carparking area (75% completed)
  • Tiling work- 1st to 16th floor-100% completed
  • Plumbing work – GF (85% completed); 1st to Terrace floor (100% completed)
  • CP sanitary fixing work – 1st(50% completed); 2nd floor (25% completed)
  • Aluminium Windows and Ventilators – 1st,9th floor(100% completed);2nd,6th to 8th & 10th to 13th floor(95% completed);3rd,4th(90% completed); 5th floor(80% completed)14th floor(75% completed);15th floor(50% completed);16th floor(25% completed)
  • Door shutter fixing- 1st floor(90% completed);2nd to 12th floor(100% completed);13th,14th & 16th floor(90% completed);15th floor(100% completed)
  • Water Proofing work – 1st to terrace floor -100% completed
  • Yard work- 90% completed

As per the current work status from our site we are targeted to complete the following works by end of ​December, 2017

  • Internal wall plastering work – 100% to be completed
  • Inside panting work(1st coat) -100% to be completed
  • Electrical work – GF -100% to be completed
  • Putty work – GF -100% to be completed
  • External wall plastering work – 100% to be completed
  • Tiling work-15th & 16th floor-100% to be completed
  • Plumbing work – 100% to be completed
  • CP sanitary fixing work – 1st & 2nd floor 100% to be completed
  • Alumnium Windows and Ventilators – 100% to be completed
  • Yard work- 100% to be completed

Work status as on 10-12-2017, we have completed

  • Internal wall plastering work – GF (90% completed);1st to Terrace floor (100% completed)
  • Inside panting work(1st coat) -1st to 16th floor(100% completed)
  • Electrical work – GF (50% completed);1st to 16th floor (100% completed)
  • Putty work – GF (90% completed); 1st to Terrace floor (100% completed)
  • External wall plastering work – GF (80% completed);1st to Terrace floor (100% completed); Carparking area (75% completed)
  • Tiling work- 1st to 14th floor(100% completed);15th & 16th floor(95% completed)
  • Plumbing work – GF (85% completed); 1st to Terrace floor (100% completed)
  • CP sanitary fixing work – 1st & 2nd floor (25% completed)
  • Alumnium Windows and Ventilators – 1st &5th floor(80% completed);2nd & 7th floor(95% completed);3rd,4th &6th floor(90% completed);8th floor(85% completed);9th floor(100% completed);10th,11th & 12th floor(75% completed)
  • Yard work- 75% completed

Work status as on 9-8-2017, we have completed

  • RCC for Structure – completed
  • Car parking roof concreting work – completed
  • Ceiling plastering work – completed
  • Block/Brick masonry – completed
  • Internal wall plastering work – completed
  • Putty work – progressing
  • External wall plastering work -progressing

Work status as on 10-7-2017, we have completed

  • RCC for Structure – completed
  • Car parking roof concreting work – completed
  • Ceiling plastering work – completed
  • Block/Brick masonry – completed
  • Block/Brick masonry – completed
  • Putty work – GF balnce; progressing
  • External wall plastering work – progressing

Work status as on 10-6-2017, we have completed

  • RCC for Structure – completed
  • Car parking roof concreting work – completed
  • Ceiling plastering work – completed
  • Block/Brick masonry – completed
  • External wall plastering work – progressing

Work status as on 9-5-2017, we have completed

  • RCC for Structure – completed
  • Car parking roof concreting work – completed
  • Ceiling plastering work – completed
  • Block/Brick masonry – completed
  • Putty work – GF balnce; 13th floor – progressing

Work status as on 7-3-2017, we have completed

  • RCC for Structure – completed
  • Car parking roof concreting work – completed
  • Ceiling plastering work – completed
  • Block/Brick masonry – completed
  • External wall plastering work – progressing

Construction status as on June 2015

  • 5th floor roof slab (half portion) RCC work – 100% completed
  • 5th to 6th floor roof column – 8nos completed (out of 37)
  • Lift wall steel work – completed.
  • Ceiling plastering work – 4th floor – progressing
  • Block work – 1st, 2nd and 3rd floor – progressing
  • Wire pulling work – 3rd floor – progressing

Following works are expected to be completed by end of June 2015.

  • 5th & 6th floor roof slab RCC work – 100% completion
  • 5th to 6th floor roof column – 100% to be completed
  • Ceiling plastering work – 4th & 5th floor – 100% completion
  • Block work – 3rd and 4th floor – 100% completion
  • Wire pulling work – 3rd & 4th floor – 100% to be completed

As on 6-3-2015, we are progressing 3rd floor -Slab shuttering & Steel works.

The 3rd & 4th floor slab RCC works are expected to be completed by next month.

Mock Apartment Images

 

BANK APPROVAL

Are you on the lookout for a home loan? We can help you. We have tie-ups with prominent banks for this project. It will help you make the loan application process easier.

Everyone reaches a point in their life when paying rent just doesn’t make sense and you want to buy your own home. If you have reached that stage, then look for flats in Vellayambalam as this area is one of the best places to live in, with its wide roads, good infrastructure, lots of trees and lower pollution. It’s unbelievable that such a place actually exists in the heart of the city and provides peaceful addresses for residential homes.

Vellayambalam Junction is uniquely placed too as it is located on the Rajapatha (royal path) that exists between Kowdiar and East Fort. The junction hosts a statue of Ayyankali, the freedom fighter and serves as a memorial for him. The junction also connects major locations like Kowdiar, Sasthamangalam, Thycaud and Thampanoor. The area is home to a good number of government offices and parastatals, good schools as well as entertainment venues like Kanakakunnu Palace, the museum and zoo complex, movie halls, etc. Buying apartments in Vellayambalam would also mean being able to access all these places in a jiffy while being able to live in the serenest of locations.

Aside from the location of the apartment, the builder also matters a lot. After all, nobody wants to invest large sums of money with fly-by-night operators who can easily swindle you. Go with big brands that have loads of experience to back them, like Artech Realtors. They have a number of apartments in Vellayambalam that you can look into.