Artech Celestia

Project Description

K-RERA registration not required-Occupancy certificate received before 01/01/2020.
Artech Celestia offers luxurious apartments in a central location at Nanthancode, and lavish leisure amenities that will complement your sophisticated lifestyle. The project houses 3 BHK units in sizes ranging from 1800 sft to 2940 sft. Located in the vicinity of one of the most vibrant communities of Trivandrum, Artech Celestia assures easy accessibility to Malls, Convenience stores, Clubs and other utilities. The outstanding architecture of Artech Celestia sets it apart as an icon in its neighbourhood – thereby adding a further level of prestige to the address.

Quick Enquire

Take your first few steps towards finding the ultimate happiness of the Perfect Home.

Location

Artech Celestia, Nanthancode - Location

Layout

Specification

Structure

RCC framed structure designed for higher seismic consideration with pile foundation.

Flooring & Tiling
  • Foyer/Living/Dining – Premium quality vitrified tiles of size 80 x 80 cm.
  • Bedroom – Premium quality vitrified tiles of size 60 x 60 cm.
  • Master Bedroom – Laminated wooden flooring.
  • Master Bathroom and other Toilets – Designer ceramic tile concept of size 30 x 30 cm for the floor and 30 x 60 cm for walls up to 7’0”.
  • Servants Toilet – Ceramic tile 30 x 30 cm for floor and 30 cm x 45 cm for walls up to height of 7’0”.
  • Kitchen – 60 x 60 cm vitrified tile and 30 x 45 cm for walls up to 4’6” height or 2′ above the counter if any.
  • Utility Room – 30 x 30 cm for floor and 30 x 45 cm for walls up to 4’6” height or 2′ above the counter if any.
  • Balconies / Open Terraces / Decks – Rustic / Antiskid / Ceramic Tiles of size 30 x 40 cm.
Kitchen
  • Superior quality granite for couter top.
  • Single bowl stainless steel sink with single drain board in the kitchen and single bowl stainless steel sink in work area.
  • Provision for water purifier.
Sanitaryware and CP Fittings
  • Roca or equivalent sanitary wares.
  • Imported concealed cistern in all attached toilets.
  • Grohe or equivalent brand premium quality CP fittings and Grohe or equivalent brand diverters for master toilet.
  • Towel rods, towel rings, soap dish and health faucets shall be provided inside the toilets.
Doors and Windows
  • Elegant teakwood entrance door with hard wood frames and architrave with imported hardware and entrance door with number lock system.
  • All internal door frames shall be of hard wood with flush door shutters.
  • Powder coated aluminium heavy duty four track sliding windows with mosquito net, MS grill and glazed sliding door for balconies.
Painting
  • Polished front doors and internal doors.
  • Double coat plastic emulsion over putty for entire walls except toilets.
  • Double coats emulsion for ceiling
  • Two coat enamel paint for grills.
Electrical
  • Concealed wiring with superior quality PVC insulated copper cables and Clipsal neo c-metro equivalent modular type switches, adequate light and fan points.
  • Four 16A power plug points controlled by ELCB and MCB.
  • Independent energy meter for each apartment.
  • Provision for washing machine in work area.
  • Provision for Internet connection in any one bedroom.
Air Conditioner

Split AC provision including cabling for all bedrooms and living and dining.

Telephone

Provision for telephone in living room and all bedrooms.

Cable TV

Provision for Cable TV in living room, master bedroom.

Lift

High speed passenger and stretcher lift – Kone or equivalent

Generator

Generator back-up for lifts, common areas, pumps and eight designated points within the apartments with automatic change over.

Water Supply

Water supply through underground sump tank and overhead tank with sufficient storage capacity, treated drinking water with reverse osmosis filters.

Home Automation
  • Access control entry to the common entrance, foyer and gymnasium
  • Multi level security system for common areas and lobbies.
  • CCTV for parking and entrance lobby at ground floor.
  • Boom barriers at entry / exit of the complex.
  • Gas leakage detectors.

Amenities

  • Fully Equipped Air-Conditioned Unisex Gym
  • Toddlers Park
  • Guest Suite
  • Audio Visual Room
  • Multipurpose Hall
  • Rooftop Party Area
  • Drivers Restroom
  • Reticulated LPG Supply
  • Video Door Phone and Intercom Facilities

Progress

As per the current work status from our site we are targeted to complete the following works by end of July 2019

Tower 1

  • Inside painting work – 100% to be completed

Work status as on 06.07.2019, we have completed the following

Tower 1

  • RCC for Structure – 100% completed
  • Ceiling plastering work -100% completed
  • Block Masonry – 100% completed
  • Wall plastering work – 100% completed
  • External plastering work – 100% completed
  • Inside 1st coat putty – 100% completed
  • Inside 2nd coat putty – 100% completed
  • Inside painting work -95% completed
  • Outside painting work (1st coat) – 100% completed
  • Tiling work – 100% to be completed
  • Electrical HT work – 100% completed
  • Electrical LT work – 100% completed
  • Plumbing work- 100% completed
  • Reticulated gas work-100%completed
  • Fire Work-100%completed
  • Yard work – 100% completed

Tower 2

  • RCC for Structure – 100% completed
  • Ceiling Plastering work – 1st to 13th floor – 100% completed
  • Block/Brick masonry – 1st to 13th floor – 100% completed
  • Wall plastering work – 100% completed
  • Wire pulling work – 100% completed
  • External plastering work – 100% completed
  • Inside painting work – 100% completed
  • Outside painting work (2nd coat) – 100% completed
  • Plumbing work – 100% completed
  • Electrical HT work – 100% completed
  • Tiling work- 100% completed
  • Aluminium Windows and Ventilators – 100% completed
  • Yard work – 100% completed

As per the current work status from our site we are targeted to complete the following works by end of June 2019

Tower 1

  • Inside painting work – 90% to be completed

Work status as on 06.06.2019, we have completed the following

Tower 1

  • RCC for Structure – 100% completed
  • Ceiling plastering work -100% completed
  • Block Masonry – 100% completed
  • Wall plastering work – 100% completed
  • External plastering work – 100% completed
  • Inside 1st coat putty – 100% completed
  • Inside 2nd coat putty – 100% completed
  • Inside painting work -85% completed
  • Outside painting work (1st coat) – 100% completed
  • Tiling work – 100% to be completed
  • Electrical HT work – 100% completed
  • Electrical LT work – 100% completed
  • Plumbing work- 100% completed
  • Reticulated gas work-100%completed
  • Fire Work-100%completed
  • Yard work – 100% completed

Tower 2

  • RCC for Structure – 100% completed
  • Ceiling Plastering work – 1st to 13th floor – 100% completed
  • Block/Brick masonry – 1st to 13th floor – 100% completed
  • Wall plastering work – 100% completed
  • Wire pulling work – 100% completed
  • External plastering work – 100% completed
  • Inside painting work – 100% completed
  • Outside painting work (2nd coat) – 100% completed
  • Plumbing work – 100% completed
  • Electrical HT work – 100% completed
  • Tiling work- 100% completed
  • Aluminium Windows and Ventilators – 100% completed
  • Yard work – 100% completed

As per the current work status from our site we are targeted to complete the following works by end of May 2019

Tower 1

  • Inside painting work – 90% to be completed

Work status as on 06.05.2019, we have completed the following

Tower 1

  • RCC for Structure – 100% completed
  • Ceiling plastering work -100% completed
  • Block Masonry – 100% completed
  • Wall plastering work – 100% completed
  • External plastering work – 100% completed
  • Inside 1st coat putty – 100% completed
  • Inside 2nd coat putty – 100% completed
  • Inside painting work -85% completed
  • Outside painting work (1st coat) – 100% completed
  • Tiling work – 100% to be completed
  • Electrical HT work – 100% completed
  • Electrical LT work – 100% completed
  • Plumbing work- 100% completed
  • Reticulated gas work-100%completed
  • Fire Work-100%completed
  • Yard work – 100% completed

Tower 2

  • RCC for Structure – 100% completed
  • Ceiling Plastering work – 1st to 13th floor – 100% completed
  • Block/Brick masonry – 1st to 13th floor – 100% completed
  • Wall plastering work – 100% completed
  • Wire pulling work – 100% completed
  • External plastering work – 100% completed
  • Inside painting work – 100% completed
  • Outside painting work (2nd coat) – 100% completed
  • Plumbing work – 100% completed
  • Electrical HT work – 100% completed
  • Tiling work- 100% completed
  • Aluminium Windows and Ventilators – 100% completed
  • Yard work – 100% completed

As per the current work status from our site we are targeted to complete the following works by end of April 2019

Tower 1

  • Inside painting work – 90% to be completed

Work status as on 05.04.2019, we have completed the following

Tower 1

  • RCC for Structure – 100% completed
  • Ceiling plastering work -100% completed
  • Block Masonry – 100% completed
  • Wall plastering work – 100% completed
  • External plastering work – 100% completed
  • Inside 1st coat putty – 100% completed
  • Inside 2nd coat putty – 100% completed
  • Inside painting work -80% completed
  • Outside painting work (1st coat) – 100% completed
  • Tiling work – 100% to be completed
  • Electrical HT work – 100% completed
  • Electrical LT work – 100% completed
  • Plumbing work- 100% completed
  • Reticulated gas work-100%completed
  • Fire Work-100%completed
  • Yard work – 100% completed

Tower 2

  • RCC for Structure – 100% completed
  • Ceiling Plastering work – 1st to 13th floor – 100% completed
  • Block/Brick masonry – 1st to 13th floor – 100% completed
  • Wall plastering work – 100% completed
  • Wire pulling work – 100% completed
  • External plastering work – 100% completed
  • Inside painting work – 100% completed
  • Outside painting work (2nd coat) – 100% completed
  • Plumbing work – 100% completed
  • Electrical HT work – 100% completed
  • Tiling work- 100% completed
  • Aluminium Windows and Ventilators – 100% completed
  • Yard work – 100% completed

As per the current work status from our site we are targeted to complete the following works by end of March 2019

Tower 1

  • Inside painting work – 80% to be completed

Work status as on 06-03-2019, we have completed the following

Tower 1

  • RCC for Structure – 100% completed
  • Ceiling plastering work -100% completed
  • Block Masonry – 100% completed
  • Wall plastering work – 100% completed
  • External plastering work – 100% completed
  • Inside 1st coat putty – 100% completed
  • Inside 2nd coat putty – 100% completed
  • Inside painting work -70% completed
  • Outside painting work (1st coat) – 100% completed
  • Tiling work – 100% to be completed
  • Electrical HT work – 100% completed
  • Electrical LT work – 100% completed
  • Plumbing work- 100% completed
  • Reticulated gas work-100%completed
  • Firework-100%completed
  • Yard work – 100% completed

Tower 2

      • RCC for Structure – 100% completed
      • Ceiling Plastering work – 1st to 13th floor – 100% completed
      • Block/Brick masonry – 1st to 13th floor – 100% completed
      • Wall plastering work – 100% completed
      • Wire pulling work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work – 100% completed
      • Outside painting work (2nd coat) – 100% completed
      • Plumbing work – 100% completed
      • Electrical HT work – 100% completed
      • Tiling work- 100% completed
      • Aluminium Windows and Ventilators – 100% completed
      • Yard work – 100% completed

As per the current work status from our site we are targeted to complete the following works by end of February 2019

Tower 1

      • Inside painting work – 70% to be completed

Work status as on 05-02-2019, we have completed the following

Tower 1

      • RCC for Structure – 100% completed
      • Ceiling plastering work -100% completed
      • Block Masonry – 100% completed
      • Wall plastering work – 100% completed
      • External plastering work – 100% completed
      • Inside 1st coat putty – 100% completed
      • Inside 2nd coat putty – 100% completed
      • Inside painting work -50% completed
      • Outside painting work (1st coat) – 100% completed
      • Tiling work – 100% to be completed
      • Electrical HT work – 100% completed
      • Electrical LT work – 100% completed
      • Plumbing work- 100% completed
      • Reticulated gas work-100%completed
      • Fire Work-100%completed
      • Yard work – 100% completed

Tower 2

      • RCC for Structure – 100% completed
      • Ceiling Plastering work – 1st to 13th floor – 100% completed
      • Block/Brick masonry – 1st to 13th floor – 100% completed
      • Wall plastering work – 100% completed
      • Wire pulling work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work – 100% completed
      • Outside painting work (2nd coat) – 100% completed
      • Plumbing work – 100% completed
      • Electrical HT work – 100% completed
      • Tiling work- 100% completed
      • Aluminium Windows and Ventilators – 100% completed
      • Yard work – 100% completed

As per the current work status from our site we are targeted to complete the following works by end of January 2019

Tower 1

      • Inside painting work (2nd coat putty) -90% to be completed
      • Inside painting work – 50% to be completed
      • Tiling work – 100% to be completed

Work status as on 08-01-2019, we have completed the following

Tower 1

      • RCC for Structure – 100% completed
      • Ceiling plastering work -100% completed
      • Block Masonry – 100% completed
      • Wall plastering work – 100% completed
      • External plastering work – 100% completed
      • Inside 1st coat putty – 100% completed
      • Inside 2nd coat putty – 80% completed
      • Inside painting work – 40% completed
      • Outside painting work (1st coat) – 100% completed
      • Tiling work – 95% completed
      • Electrical HT work – 100% completed
      • Electrical LT work – 100% completed
      • Plumbing work- 100% completed
      • Reticulated gas work-100%completed
      • Fire Work-100%completed
      • Yard work – 100% completed

Tower 2

      • RCC for Structure – 100% completed
      • Ceiling Plastering work – 1st to 13th floor – 100% completed
      • Block/Brick masonry – 1st to 13th floor – 100% completed
      • Wall plastering work – 100% completed
      • Wire pulling work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work – 100% completed
      • Outside painting work (2nd coat) – 100% completed
      • Plumbing work – 100% completed
      • Electrical HT work – 100% completed
      • Tiling work- 100% completed
      • Aluminium Windows and Ventilators – 100% completed
      • Yard work – 100% completed

As per the current work status from our site we are targeted to complete the following works by end of December 2019
Tower 1

      • Inside painting work (2nd coat putty) -95% to be completed
      • Tiling work – 100% to be completed

Work status as on 06-12-2018, we have completed the following
Tower 1

      • RCC for Structure – 100% completed
      • Ceiling plastering work -100% completed
      • Block Masonry – 100% completed
      • Wall plastering work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work (1st coat putty) – 100% completed
      • Inside painting work (2nd coat putty) – 70% completed
      • Outside painting work (1st coat) – 100% completed
      • Tiling work – 95% completed
      • Electrical HT work – 100% completed
      • Electrical LT work – 100% completed
      • Plumbing work- 100% completed
      • Reticulated gas work-100%completed
      • Fire Work-100%completed
      • Yard work – 100% completed

Tower 2

      • RCC for Structure – 100% completed
      • Ceiling Plastering work – 1st to 13th floor – 100% completed
      • Block/Brick masonry – 1st to 13th floor – 100% completed
      • Wall plastering work – 100% completed
      • Wire pulling work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work – 100% completed
      • Outside painting work (2nd coat) – 100% completed
      • Plumbing work – 100% completed
      • Electrical HT work – 100% completed
      • Tiling work- 100% completed
      • Aluminium Windows and Ventilators – 100% completed
      • Yard work – 100% completed

As per the current work status from our site we are targeted to complete the following works by end of November 2018

      • Inside painting work (2nd coat putty) – 100% to be completed
      • Tiling work – 100% to be completed

Work status as on 16-11-2018, we have completed the following.

Tower 1

      • RCC for Structure – 100% completed
      • Ceiling plastering work -100% completed
      • Block Masonry – 100% completed
      • Wall plastering work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work (1st coat putty) – 100% completed
      • Inside painting work (2nd coat putty) – 60% completed
      • Outside painting work (1st coat) – 100% completed
      • Tiling work – 95% completed
      • Electrical HT work – 100% completed
      • Electrical LT work – 100% completed
      • Plumbing work- 100% completed
      • Yard work – 100% completed

Tower 2

      • RCC for Structure – 100% completed
      • Ceiling Plastering work – 1st to 13th floor – 100% completed
      • Block/Brick masonry – 1st to 13th floor – 100% completed
      • Wall plastering work – 100% completed
      • Wire pulling work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work – 100% completed
      • Outside painting work (2nd coat) – 100% completed
      • Plumbing work – 100% completed
      • Electrical HT work – 100% completed
      • Tiling work- 100% completed
      • Aluminium Windows and Ventilators – 100% completed
      • Yard work – 100% completed

Work status as on September 2018, we have completed the following.

Tower 1

      • RCC for Structure – 100% completed
      • Ceiling plastering work -100% completed
      • Block Masonry – 100% completed
      • Wall plastering work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work (1st coat putty) – 100% completed
      • Outside painting work (1st coat) – 100% completed
      • Tiling work -1st floor (60% completed); 2nd to 16th floor (100% completed); 17th floor (90% completed); 18th & 19th (90%completed); 20th & 21st floor – 80% completed
      • Electrical HT work – 95% completed
      • Electrical LT work – 95% completed
      • Plumbing work- 95% completed
      • Yard work – 95% completed

Tower 2

      • RCC for Structure – 100% completed
      • Ceiling Plastering work – 1st to 13th floor – 100% completed
      • Block/Brick masonry – 1st to 13th floor – 100% completed
      • Wall plastering work – 100% completed
      • Wire pulling work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work – 100% completed
      • Outside painting work ( 2nd coat) – 95% completed
      • Plumbing work – 100% completed
      • Electrical HT work – 100% completed
      • Tiling work- 100% completed
      • Aluminium Windows and Ventilators – 100% completed
      • Yard work – 95% completed

As per the current work status from our site we are targeted to complete the following works by end of September 2018

Tower 1

      • Tiling work – 100% to be completed
      • Electrical HT work – 100% to be completed
      • Electrical LT work – 100% to be completed
      • Yard work – 100% to be completed

Tower 2

      • Outside painting work -100% to be completed
      • Yard work- 100% to be completed

As per the current work status from our site we are targeted to complete the following works by end of  July 2018

Tower 1

      • Tiling work – 100% to be completed
      • Electrical HT work – 100% to be completed
      • Electrical LT work – 20th floor – 100% to be completed
      • Plumbing work – 100% to be completed
      • Yard work – 100% to be completed

Tower 2

      • Inside painting work -100% to be completed
      • Outside painting work -100% to be completed
      • Electrical HT work – 100% to be completed
      • Yard work- 100% to be completed

Work status as on 05-07-2018, we have completed the following.

Tower 1

      • RCC for Structure – 100% completed
      • Ceiling plastering work -100% completed
      • Block Masonry – 100% completed
      • Wall plastering work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work (1st coat putty) – 100% completed
      • Outside painting work (1st coat) – 100% completed
      • Tiling work -2nd to 16th floor (100% completed); 18th floor (completed)
      • Electrical LT work -1st to 19th floor (Wire pulling -100% completed)
      • Plumbing work- 1st to 21st floor (consealed line) – (100% completed), duct line completed
      • Yard work – 90% completed

Tower 2

      • RCC for Structure – 100% completed
      • Ceiling Plastering work – 1st to 13th floor – 100% completed
      • Wall plastering work – 100% completed
      • Wire pulling work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work – 100% completed
      • Outside painting work ( 2nd coat) – 95% completed
      • Plumbing work – 100% completed
      • Electrical HT work – 95% completed
      • Tiling work- 100% completed
      • Aluminium Windows and Ventilators – 100% completed
      • Yard work – 95% completed

Work status as on 05-06-2018, we have completed the following.

Tower 1

      • RCC for Structure – 100% completed
      • Ceiling plastering work -100% completed
      • Block Masonry – 100% completed
      • Wall plastering work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work (1st coat putty) – 100% completed
      • Outside painting work (1st coat) – 100% completed
      • Tiling work -2nd to 16th floor (100% completed); 18th floor (completed)
      • Electrical HT work – 85% completed
      • Electrical LT work -1st to 19th floor (Wire pulling -100% completed)
      • Plumbing work- 1st to 21st floor (consealed line) – (100% completed)
      • duct line completed
      • Yard work – 90% completed

Work status as on 05-06-2018, we have completed the following
Tower 2

      • RCC for Structure – 100% completed
      • Ceiling Plastering work – 1st to 13th floor – 100% completed
      • Block/Brick masonry – 1st to 13th floor – 100% completed
      • Wall plastering work – 100% completed
      • Wire pulling work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work – 100% completed
      • Outside painting work ( 2nd coat) – 95% completed
      • Plumbing work – 100% completed
      • Electrical HT work – 95% completed
      • Tiling work- 100% completed
      • Aluminum Windows and Ventilators – 100% completed
      • Yard work – 95% completed

Work Schedule for the Month of July 2018
Tower 1

      • Tiling work – 100% to be completed.
      • Electrical HT work – 100% to be completed
      • Electrical LT work – 20th floor – 100% to be completed
      • Plumbing work – 100% to be completed
      • Yard work – 100% to be completed

Work Schedule for the Month of July 2018
Tower 2

      • Inside painting work -100% to be completed
      • Outside painting work -100% to be completed
      • Electrical HT work – 100% to be completed
      • Yard work- 100% to be completed

As per the current work status from our site we are targeted to complete the following works by end of May 2018
Tower 1

      • Block Masonry – GF – 100% to be completed
      • Wall plastering work – 20th floor – 100% to be completed
      • Inside painting work (1st coat putty) -100% to be completed
      • Outside painting work (1st coat) – 100% to be completed
      • Tiling work- 100% to be completed
      • Electrical HT work – 100% to be completed
      • Electrical LT work -100% to be completed
      • Plumbing work – 100% to be completed
      • Yard work -100% to be completed

Tower 2

      • Inside painting work -100% to be completed
      • Outside painting work -100% to be completed
      • Electrical HT work – 100% to be completed
      • Yard work- 100% to be completed

Work status as on 05-05-2018, we have completed the following.
Tower 1

      • RCC for Structure – B2(100% completed); B1(100% completed); GF to 21st floor (100% completed); Terrace floor (100% completed)
      • Ceiling plastering work -100% completed
      • Block Masonry – B2,B1,1st to 20th floor(100% completed); GF(95% comlpleted);
      • Wall plastering work – B2, B1 (95% completed); GF to 19th floor (100% completed);21st floor (100% completed);20th floor (95% completed)
      • External plastering work – 1st to 19th floor(100% completed); 20th & 21st floor (100% completed)
      • Inside painting work (1st coat putty)- 90% completed
      • Outside painting work (1st coat) – 95% completed
      • Tiling work-2nd to 16th floor (95% completed);18th floor (95% completed); 19th floor (20% completed); 17th floor (hold- tile not supplied by client)
      • Electrical HT work – 70% completed
      • Electrical LT work -1st to 18th floor (Wire pulling -100% completed) ; 19th floor (50% completed)
      • Plumbing work- 1st to 21st floor – consealed line – (100% completed); duct line completed
      • Yard work -70% completed

Tower 2

      • RCC for Structure – 100% completed
      • Ceiling Plastering work – 1st to 13th floor – 100% completed
      • Block/Brick masonry – 1st to 13th floor – 100% completed
      • Wall plastering work – 100% completed
      • Wire pulling work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work -90% completed
      • Outside painting work -70% completed
      • Plumbing work – 100% completed
      • Electrical HT work – 90% completed
      • Tiling work- 100% completed
      • Aluminium Windows and Ventilators – 100% completed
      • Yard work- 90% completed

As per the current work status from our site we are targeted to complete the following works by end of April 2018

Tower 1

      • Block Masonry – GF – 100% to be completed
      • Wall plastering work – 100% to be completed
      • External plastering work – 100% to be completed
      • Inside painting work (1st coat putty) -100% to be completed
      • Outside painting work (1st coat) – 100% to be completed
      • Tiling work- 100% to be completed
      • Electrical HT work – 100% to be completed
      • Electrical LT work -100 % to be completed
      • Plumbing work – 100% to be completed
      • Aluminium Windows and Ventilators – 100% to be completed
      • Yard work -100% to be completed

Tower 2

      • Inside painting work -100% to be completed
      • Outside painting work -100% to be completed
      • Electrical HT work – 100% to be completed
      • Yard work- 100% to be completed

Work status as on 16-04-2018, we have completed the following.

Tower 1

      • Wall plastering work – B2, B1 (90% completed); GF to 19th floor (100% completed);21st floor (100% completed);20th floor (90% completed)
      • External plastering work – 1st to 19th floor(100% completed);20th & 21st floor (90% completed)
      • Inside painting work (1st coat putty)- 80% completed
      • Outside painting work (1st coat) – 40% completed
      • Tiling work-2nd to 13th floor (95% completed);14th & 15th floor (80% completed)
      • Electrical HT work -70% completed
      • Electrical LT work -1st to 16th floor(Wire pliling-100% completed) ;17th & 18th floor (90% completed)
      • Plumbing work- 1st to 16th floor (100% completed);17th floor (50% completed);18th & 19th floor(90% completed);20th & 21st floor (60% completed)
      • Aluminium Windows and Ventilators – 2nd to 6th floor(80% completed);12th floor (50% completed); 13th floor (80% completed)
      • Yard work -70% completed

Tower 2

      • Inside painting work -80% completed
      • Outside painting work -70% completed
      • Plumbing work – 100% completed
      • Electrical HT work – 80% completed
      • Tiling work- 100% completed
      • Aluminium Windows and Ventilators – 100% completed
      • Yard work- 90% completed

As per the current work status from our site we are targeted to complete the following works by end of March 2018

Tower 1

      • RCC for Structure -100% to be completed
      • Block Masonry – GF – 100% to be completed
      • Wall plastering work – 100% to be completed
      • Inside painting work -100% to be completed
      • External plastering work – 100% to be completed
      • Outside painting work -100% to be completed
      • Electrical HT work – 100% to be completed
      • Electrical LT work -100 % to be completed
      • Aluminium Windows and Ventilators – 100% to be completed
      • Tiling work- 100% to be completed
      • Plumbing work- 17th floor-100% to be completed
      • Yard work -100% to be completed

Tower 2

      • Yard work- 100% to be completed
      • Electrical HT work – 100% to be completed
      • Outside painting work -100% to be completed
      • Inside painting work -100% to be completed

Work status as on 10-03-2018, we have completed the following.

Tower 1

      • Aluminium Windows and Ventilators – 2nd to 6th floor(80% completed);12th floor A1 & 13th floor A1,A2(80% completed)
      • Tiling work-2nd to 13th floor (95% completed);14th floor (60% completed)
      • Plumbing work- 1st to 16th floor (100% completed);17th floor (50% completed);18th & 19th floor(90% completed);20th floor (20% completed)
      • Yard work -70% completed

Tower 2

      • Inside painting work -80% completed
      • External plastering work – 100% completed
      • Outside painting work -70% completed
      • Wire pulling work – 100% completed
      • Electrical HT work – 80% completed
      • Aluminium Windows and Ventilators – 100% completed
      • Tiling work- 100% completed
      • Plumbing work – 100% completed
      • Yard work- 90% completed

As per the current work status from our site we are targeted to complete the following works by end of February-2018

Tower 1

      • RCC for Structure -100% to be completed
      • Block Masonry – GF – 100% to be completed
      • Wall plastering work – 100% to be completed
      • External plastering work – 100% to be completed
      • Inside painting work -100% to be completed
      • Outside painting work -100% to be completed
      • Tiling work- 100% to be completed
      • Electrical HT work – 100% to be completed
      • Electrical LT work -100 % to be completed
      • Plumbing work- 17th floor-100% to be completed
      • Aluminium Windows and Ventilators – 100% to be completed
      • Yard work -100% to be completed

Tower 2

      • Inside painting work -100% to be completed
      • Outside painting work -100% to be completed
      • Electrical HT work – 100% to be completed
      • Yard work- 100% to be completed

Work status as on 10- 02-2018, we have completed the following.

Tower 1

      • Wall plastering work – B2, B1 (90% completed); GF to 19th(100% completed);21st floor (100% completed);20th floor (60% completed)
      • External plastering work – 1st to 9th floor(100% completed);10th to 19th floor(95% completed),20th & 21st floor (80% completed)
      • Inside painting work (1st coat putty)-70% completed
      • Outside painting work (primer) -70% completed
      • Tiling work-2nd to 13th floor (75% completed)
      • Electrical HT work -60% completed
      • Electrical LT work -1st to 16th floor(Wire pulling-100% completed) ;17th & 18th floor (60% completed)
      • Plumbing work- 1st to 16th floor (100% completed);17th floor (50% completed)
      • Aluminium Windows and Ventilators – 20% completed
      • Yard work -70% completed

Tower 2

      • Wire pulling work – 100% completed
      • External plastering work – 100% completed
      • Inside painting work -80% completed
      • Outside painting work -70% completed
      • Plumbing work – 100% completed
      • Electrical HT work – 80% completed
      • Tiling work- 100% completed
      • Aluminium Windows and Ventilators – 100% completed
      • Yard work- 90% completed

Work status as on 5-7-2017, we have completed

Tower 1

      • RCC for Structure – completed
      • Ceiling plastering work – progressing
      • Block Masonry – progressing
      • Wall plastering work – progressing

Tower 2

      • RCC for Structure – completed
      • Ceiling Plastering work – 1st to 13th floor – completed
      • Block/Brick masonry – 1st to 13th floor – completed
      • Wall plastering work – completed
      • Wire pulling work – progressing
      • External plastering work – progressing

Work status as on 9-5-2017, we have completed

Tower 1

      • RCC for Structure -progressing
      • Ceiling plastering work – progressing
      • Block Masonry – progressing
      • Wall plastering work – progressing
      • External plastering work – 1st to 18th floor -progressing

Tower 2

      • RCC for Structure – completed
      • Ceiling Plastering work – 1st to 13th floor – completed
      • Block/Brick masonry – 1st to 13th floor – completed
      • Wall plastering work – completed
      • Flooring work – 2nd to 11th floor -progressing
      • Wire pulling work – 1st floor -progressing

         

Work status as on 7-3-2017, we have completed:

Tower 1

      • RCC for Structure – progressing
      • Ceiling plastering work – progressing
      • External plastering work – progressing

Tower 2

      • RCC for Structure – 100% completed
      • Ceiling Plastering work – progressing
      • Block/Brick masonry – progressing
      • Wall plastering work – 100% completed

         

Work status as on 8-2-2017, we have completed:

Tower 1

      • RCC for Structure – B2(80% completed); B1(80% completed); 19th roof (100% completed)
      • Ceiling plastering work – B2(75%completed); 11th to 17th floor (90% completed); 18th floor (100% completed)
      • Block Masonry – 13th to 16th floor (90% completed); 17th floor (90% completed); 18th floor (90% completed)
      • Wall plastering work – 1st to 17th floor – 90% completed
      • External plastering work – 40% completed

Tower 2

      • RCC for Structure – 100% completed
      • Ceiling Plastering work – 1st to 13th floor – 100% completed
      • Block/Brick masonry – 1st to 13th floor – 100% completed
      • Wall plastering work – 100% completed
      • External plastering work – 90% completed

         

As per the current work status from our site we are targeted to complete the following works by end of February, 2017.

Tower 1

      • RCC for Structure – 20th roof – 100% to be completed
      • Ceiling plastering work – 19th floor – 100% to be completed
      • Block Masonry – 17th,18th & 19th floor – 100% to be completed
      • Wall plastering work – 18th floor – 100% to be completed

Tower 2

      • External plastering work – 100% to be completed

Work status as on 06-5-2016, we have completed:

Tower 1

      • RCC for Structure – 8th floor – completed

Tower 2

      • RCC for Structure – 100% completed

         

Construction progress as on 13th May 2015:

Tower-1

      • Pile Cap work is progressing

Tower 2

      • Slab RCC – 8th floor – 95% completed
      • Ceiling plastering work – 4th floor – completed
      • Block work – 2nd, 3rd and 4th floor – progressing

The following works are expected to be completed by end of May 2015.

Tower 2

      • Slab RCC – 9th floor – 100% to be completed
      • Ceiling plastering work – 5th & 6th floor – to be completed
      • Block work – 2nd, 3rd and 4th floor – 100% to be completed

         

Piling of Tower 2 and Piling set out of Tower 1 has been completed now.

Payment

Description / Stage of Construction%
At the time of Agreement30%
On Completion of Piling works5%
On Completion of Pile cap and Beams5%
On Completion of Ground Floor Roof Slab5%
On Completion of 3rd Floor Roof Slab5%
On Completion of 6th Floor Roof Slab5%
On Completion of 9th Floor Roof Slab5%
On Completion of 12th Floor Roof Slab5%
On Completion of 15th Floor Roof Slab5%
On Completion of 18th Floor Roof Slab5%
On Completion of 21st Floor Roof Slab5%
On Completion of Entire Structure5%
On Completion of internal Plastering of respective apartments5%
On Completion of External Plastering5%
On Completion of flooring of respective apartments2%
On Completion of Internal painting2%
On Handing Over of apartment1%
Total100%