ArtechMarvel

2 BHK Flats in Trivandrum , 3 BHK Flats in Trivandrum , Builders in Trivandrum , Luxury apartments in trivandrum , New Launch , Ongoing , Trivandrum
Pattom, Trivandrum

RERA Number: K‐RERA/PRJ/TVM/069/2023
rera.kerala.gov.in

Project Description

Experience the epitome of contemporary luxury at Artech Marvel, where timeless elegance meets modern sophistication in the heart of Pattom, Trivandrum. Our latest project showcases a collection of 2 and 3-BHK apartments that exude architectural excellence and impeccable craftsmanship. From stunning cityscape views to the seamless blend of modern and classic elements, Artech Marvel is a world of opulence and leisure. Each apartment has been thoughtfully designed with high-end finishes and ample natural light, striking the perfect balance between style and functionality.

Come and discover a new standard of living at Artech Marvel – an exquisite display of luxury living at its best.

QUICK
ENQUIRE

Take your first few steps towards finding the ultimate happiness of the Perfect Home.





    • Air-conditioned Multi-Purpose Hall for association and other activities.
    • Air Conditioned Unisex Gym
    • Air Conditioned state of the art AV Room
    • Guest Suite
    • Indoor Games Room
    • Rooftop Party Area
    • Children’s Play Area
    • Video door phone with intercom facility
    • Common toilet for supporting staff
    • Reticulated LPG supply
    • Gas leakage detector
    • Boom barrier
    • Access control system
    • Surveillance camera system
    • Common Electric car charging point
    • Efficient waste disposable system
    • Fire Suppression system
    • Car wash facility
    • Drivers Dormitory

    Are you on the lookout for a home loan? We can help you. We have tie-ups with prominent banks for this project. It will help you make the loan application process easier.

    • AXIS
    • SOUTH INDIAN BANK
    • BANK OF BARODA
    • HDFC
    • FEDERAL BANK
    • ICICI
    • UCO

    Work status as on 10-03-2025, we have completed the following.

    • Sub Structural Works – Earth work excavation for sump tank 110m3 Pile chipping 6 Rm Column RCC 26 cum,Beam & slab & Staircase (2nd flight) RCC 174 cum,Staircase (1st flight & landing) RCC 6cum,Shear wall RCC 7cum,Sump tank base 49cum, Beam & slab & Staircase (2nd flight) RCC-68cum completed,Staircase (1st flight & landing) RCC- 4 cum, Shear wall RCC-7 cum, Sump tank wall- 38.58cum,
    • BLOCK WORK – 8″Block work 76.57cum , 4″Block work 286.34 sqm
    • PLASTERING WORKS – Wall Plastering; 1157sqm completed out of 35000sqm Ceiling plastering: 664.94 sqm completed
    • Electrical works – Electrical Rope pulling 6th,7th floor completed,Electrical work – wall chasing & box fixing-1 flat completed

    As per the current work status from our site, we are targeted to complete the following works by the end of MARCH 2025.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-110 cum, Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-7cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed
    • BLOCK WORK – 8″ Block Work: 70m3 ,4″ Block Work-240 to be completed
    • PLASTERING WORKS – Wall Plastering-600 sqm, Ceiling plastering- 500 sqm to be completed

    Work status as on 13-02-2025, we have completed the following.

    • Sub Structural Works – Earth work excavation for sump tank 110m3 Pile chipping 6 Rm Column RCC 40 cum,Beam & slab & Staircase (2nd flight) RCC 174 cum,Staircase (1st flight & landing) RCC 6cum,Shear wall RCC 7cum,Sump tank base 49cum,
    • BLOCK WORK – 8″Block work 50 cum , 4″Block work 113 sqm
    • PLASTERING WORKS – Wall Plastering; 1157sqm completed out of 35000sqm Ceiling plastering: 331sqm completed
    • Electrical works- Electrical Rope pulling 5th floor completed

    As per the current work status from our site, we are targeted to complete the following works by the end of FEBRUARY 2025.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-110 cum, Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-7cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed
    • BLOCK WORK- 8″ Block Work: 70m3 ,4″ Block Work-240 to be completed
    • PLASTERING WORKS – Wall Plastering-600 sqm, Ceiling plastering- 500 sqm to be completed

    Work status as on 12-12-2024, we have completed the following.

    • Sub Structural Works – Pile concreting 111 nos. completed Pile integrity test – completed ,Pile chipping 101 nos: completed out of 111 Nos.Excavation of pile cap foundation – 1993 m3 completed out of 2660m3 PCC for pilecap – 105m3 completed out of 120 m3 , RCC for pile cap – 250m3 completed out of 275m3 RCC for plinth beam and raft slab – 235m3 completed out of 260m3 ,RCC retaining wall 125 m3 completed out of 195m3 Column RCC – 210m3 completed out of 800m3 Auger Pile RCC-11cum completed out of 11cum SLAB: Ground Floor Slab, First Floor Slab,2nd,3rd,4th 5th slab completed
    • BLOCK WORK – 8″ Block Work: 12 m3 completed out of 1750m3
    • PLASTERING WORKS – Wall Plastering; 407sqm completed out of 35000sqm Ceiling plastering: 2341 sqm completed out of 9000sqm

    As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2024.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-445.08cum, Pile chipping-15 Rm,Column RCC-44 cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-7cum ,Sunshade drop- 35.6 cum, Sump tank base-43 cum to be completed
    • BLOCK WORK – 8″ Block Work: 70m3to be completed
    • PLASTERING WORKS – Ceiling plastering- 500 sqm to be completed

    Work status as on 08-11-2024, we have completed the following.

    • Sub Structural Works – Pile concreting 111 nos. completed Pile integrity test – completed ,Pile chipping 101 nos: completed out of 111 Nos.Excavation of pile cap foundation – 1993 m3 completed out of 2660m3 PCC for pilecap – 105m3 completed out of 120 m3 , RCC for pile cap – 250m3 completed out of 275m3 RCC for plinth beam and raft slab – 235m3 completed out of 260m3 ,RCC retaining wall 125 m3 completed out of 195m3 Column RCC – 210m3 completed out of 800m3 Auger Pile RCC-11cum completed out of 11cum SLAB: Ground Floor Slab, First Floor Slab,2nd,3rd,4th 5th slab completed
    • BLOCK WORK – 8″ Block Work: 12 m3 completed out of 1750m3
    • PLASTERING WORKS – Wall Plastering; 407sqm completed out of 35000sqm Ceiling plastering: 2341 sqm completed out of 9000sqm

    As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2024.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-445.08cum, Pile chipping-15 Rm,Column RCC-44 cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-7cum ,Sunshade drop- 35.6 cum, Sump tank base-43 cum to be completed
    • BLOCK WORK – 8″ Block Work: 70m3to be completed
    • PLASTERING WORKS – Ceiling plastering- 500 sqm to be completed

    Work status as on 08-11-2024, we have completed the following.

    • Sub Structural Works – Pile concreting 111 nos. completed Pile integrity test – completed ,Pile chipping 101 nos: completed out of 111 Nos.Excavation of pile cap foundation – 1993 m3 completed out of 2660m3 PCC for pilecap – 105m3 completed out of 120 m3 RCC for pile cap – 250m3 completed out of 275m3 RCC for plinth beam and raft slab – 235m3 completed out of 260m3 ,RCC retaining wall 125 m3 completed out of 195m3 Column RCC – 143 m3 completed out of 800m3 Auger Pile RCC-11cum completed out of 11cum Ground Floor Slab:175cum out of 187cum completed First Floor Slab:160cum out of 160cum completed Second Floor Slab:172cum out of 172 cum completed
    • BLOCK WORK 8″ Block Work: 12 m3 completed out of 1750m3
    • PLASTERING WORKS – Wall Plastering; 164 sqm completed out of 35000sqm Ceiling plastering: 654sqm completed out of 9000sqm

    As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2024.

    • Sub Structural Works – Column rcc 60cum, Beam and slab rcc 300 cum ,Staircase 10cum ,Shear wall 10cum, Sunshade drop 100 sqm to be completed
    • BLOCK WORK 8″ Block Work: 30m3to be completed
    • PLASTERING WORKS – Inside Plastering; 500sqm to be completed

    Work status as on 14-10-2024, we have completed the following.

    • Sub structural works – Pile concreting 111 nos. completed Pile integrity test – completed ,Pile chipping 101 nos: completed out of 111 Nos.Excavation of pile cap foundation – 1970m3 completed out of 2100m3 PCC for pilecap – 120m3 completed out of 155m3 RCC for pile cap – 250m3 completed out of 275m3 RCC for plinth beam and raft slab – 235m3 completed out of 260m3 ,RCC retaining wall 130m3 completed out of 200m3 Column RCC – 165m3 completed out of 800m3 Auger Pile RCC-11cum completed out of 11cum Ground Floor Slab:192cum out of 220cum completed First Floor Slab:187cum out of 187cum completed Second Floor Slab:172cum out of 172 cum completed
    • BLOCK WORK- 8″ Block Work: 12m3 completed out of 1750m3
    • PLASTERING WORKS- Wall Plastering; 88sqm completed out of 350000sqm Ceiling plastering: 80sqm completed out of 9000sqm

    As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2024.

    • Sub Structural Works – Column rcc 60cum, Beam and slab rcc 300 cum ,Staircase 10cum ,Shear wall 10cum, Sunshade drop 100 sqm to be completed
    • BLOCK WORK8″ Block Work: 30m3to be completed
    • PLASTERING WORKS- Inside Plastering; 500sqm to be completed

    Work status as on 12-09-2024, we have completed the following.

    • Sub structural works – Pile concreting 111 nos. completed Pile integrity test – completed ,Pile chipping 101 nos: completed out of 111 Nos.Excavation of pile cap foundation – 1970m3 completed out of 2100m3 PCC for pilecap – 120m3 completed out of 155m3 ,RCC for pile cap – 250m3 completed out of 275m3 RCC for plinth beam and raft slab – 235m3 completed out of 260m3 ,RCC retaining wall 130m3 completed out of 200m3 Column RCC – 78m3 completed out of 800m3 Auger Pile RCC-11cum completed out of 11cum

    As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2024.

    • Sub Structural Works – Pile chipping – 10 more nos: to be completed, Excavation of pile cap foundation – to be completed, Column and shear wall RCC 20m3 to be completed, Retaining wall RCC – 42m3 to be completed, Basement floor Roof slab RCC – 85m3 to be completed, GF roof slab 75m3 to be completed

    Work status as on 13-08-2024, we have completed the following.

    • Sub structural works – Pile concreting 111 nos. completed,Pile integrity test – completed,Pile chipping 101 nos: completed out of 111 Nos.Excavation of pile cap foundation – 1680m3 completed out of 1800m3 ,PCC for pilecap – 221m3 completed out of 255m3 ,RCC for pile cap – 305m3 completed out of 325m3,RCC for plinth beam and raft slab – 349m3 completed out of 381m3 ,RCC retaining wall 83m3 completed out of 125m3,Column RCC – 27m3 completed out of 800m3,Auger Pile RCC-11cum completed out of 11cum.

    As per the current work status from our site, we are targeted to complete the following works by the end of AUGUST 2024.

    • Sub Structural Works – Pile chipping – 10 more nos: to be completed,Excavation of pile cap foundation – 120 cum to be completed,Column and shear wall RCC 20m3 to be completed,Retaining wall RCC – 42m3 to be completed,Basement floor Roof slab RCC – 85m3 to be completed,GF roof slab 75m3 to be completed

    Work status as on 09-07-2024, we have completed the following.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – completed , Pile chipping 89 nos: completed out of 111 Nos:, Excavation of pile cap foundation – 1665m3 completed out of 1800m3, PCC for pilecap – 221m3 completed out of 255m3, RCC for pile cap – 305m3 completed out of 325m3, RCC for plinth beam and raft slab – 349m3 completed out of 381m3, RCC retaining wall 83m3 completed out of 125m3, column RCC – 27m3 completed out of 800m3

    As per the current work status from our site, we are targeted to complete the following works by the end of JULY 2024.

    • Sub Structural Works – Earth back filling – 60m3 to be completed, pile chipping – 11 more nos: to be completed, pilecap RCC – 1m3 to be completed, Column and shear wall RCC 20m3 to be completed, retaining wall RCC – 20m3 to be completed, Basement floor Roof slab RCC – 85m3 to be completed, GF roof slab 75m3 to be completed

    Work status as on 11-06-2024, we have completed the following.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – completed , Pile chipping 89 nos: completed out of 111 Nos:, Excavation of pile cap foundation – 1516m3 completed out of 1800m3, PCC for pilecap – 108m3 completed out of 255m3, RCC for pile cap – 183m3 completed out of 325m3, RCC for plinth beam and raft slab – 135m3 completed out of 381m3, RCC retaining wall 33m3 completed out of 125m3, column RCC – 27m3 completed out of 800m3

    As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2024.

    • Sub Structural Works – Earth work – 250m3 to be completed, pile chipping – 11 more nos: to be completed, PCC work – 35m3 to be completed, pilecap RCC – 25m3 to be completed, plinth beam and raft slab – 30m3 to be completed, Column RCC – 25m3 to be completed, retaining wall RCC – 5m3 to be completed, Roof slab RCC – 90m3 to be completed

    Work status as on 09-05-2024, we have completed the following.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – completed , Pile chipping 76 nos: completed out of 111 Nos:, Excavation of pile cap foundation – 1386m3 completed out of 1800m3, PCC for pilecap – 105.4m3 completed out of 255m3, RCC for pile cap – 158.7m3 completed out of 325m3, RCC for plinth beam and raft slab – 135m3 completed out of 381m3, RCC retaining wall 33m3 completed out of 125m3, column RCC – 27m3 completed out of 800m3

    As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2024.

    • Sub Structural Works – Earth work – 245m3 to be completed, pile chipping – 14 more nos: to be completed, PCC work – 25m3 to be completed, pilecap RCC – 42m3 to be completed, plinth beam and raft slab – 70m3 to be completed, Column RCC – 10m3 to be completed, retaining wall RCC – 8m3 to be completed, Boundary wall RCC – 22m3 to be completed, Roof slab RCC – 95m3 to be completed

    We are pleased to inform you the current work progress at our site Artech “Marvel”, Pattom, Few snaps of the work progress is attached for your reference.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – completed , Pile chipping 62 nos: completed out of 111 Nos:, Excavation of pile cap foundation – 1041m3 completed out of 1300m3, PCC for pilecap – 88.6m3 completed out of 255m3, RCC for pile cap – 148.1m3 completed out of 325m3, RCC for plinth beam and raft slab – 131m3 completed out of 381m3, RCC retaining wall 33m3 completed out of 125m3, column RCC – 27m3 completed out of 800m3

    We are pleased to inform you the current work progress at our site Artech “Marvel”, Pattom, Few snaps of the work progress is attached for your reference.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – 36nos: completed out of 85nos: , Pile chipping 58 nos: completed out of 111 Nos:, Excavation of pile cap foundation – 836m3 completed out of 1300m3, PCC for pilecap – 66.5m3 completed out of 255m3, RCC for pile cap – 128.5m3 completed out of 325m3, RCC for plinth beam and raft slab – 109m3 completed out of 381m3, RCC retaining wall 14m3 completed out of 125m3, column RCC – 7m3 completed out of 800m3

    We are pleased to inform you the current work progress at our site Artech “Marvel”, Pattom, Few snaps of the work progress is attached for your reference.

    • Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – 36nos: completed out of 85nos: , Pile chipping 54 nos completed out of 111 Nos:, Excavation of pile cap foundation – 633m3 completed out of 1300m3, PCC for pilecap – 45.5m3 completed out of 255m3, RCC for pile cap – 128.5m3 completed out of 325m3, RCC for plinth beam and raft slab – 60m3 completed out of 381m3

    We are pleased to inform you the current work progress at our site Artech “Marvel”, Pattom, Few snaps of the work progress is attached for your reference.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – 36nos: completed out of 85nos: , Pile chipping 36 nos completed out of 111 Nos:, Excavation of pile cap foundation – 401m3 completed out of 1300m3, PCC for pilecap – 18.7m3 completed out of 255m3, RCC for pile cap – 62m3 completed out of 325m3, RCC for plinth beam and raft slab – 7m3 completed out of 381m3

    We are pleased to inform you the current work progress at our site Artech “Marvel”, Pattom, Few snaps of the work progress is attached for your reference.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile chipping 22 nos completed out of 111 Nos:, Excavation of pile cap foundation – 335m3 completed out of 1300m3, PCC for pilecap – 6.8m3 completed out of 255m3, RCC for pile cap – 43.3m3 completed out of 325m3, RCC for plinth beam and raft slab – 2m3 completed out of 381m3

    We are pleased to inform you the current work progress at our site Artech “Marvel”, Pattom, Few snaps of the work progress is attached for your reference.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile cap 5 Nos completed out of 57 Nos:, pile chipping 11 nos completed out of 111 Nos:

    Work status as on 06-11-2025, we have completed the following.

    • BLOCK WORK – Ground to 12th Floor – 100% completed;13th floor – 90 % Completed ; 14th Floor – 80 % Completed
    • PLASTERING WORKS – Inside wall Plastering work -Ground to 5th Floor – 100% completed, 6th Floor – 90 % Completed Ceiling plastering: Ground to 14th Floor – 100% completed, 15th floor – 70 % Completed.
    • Electrical works – Electrical Rope pulling -Basement to 15th Floor – 100 % Completed, ; Electrical work – Wall chasing & Box fixing-Ground 7th Floor – 100 % Completed ; 8th Floor – 20 % completed
    • Fire Fighting Works – 2nd Floor – 75 % Completed & , 3rd Floor – 25 % Completed
    • Plumbing Works (Concealed works) – Mockup & sample & Amenities area concealed works completed ; 3rd Floor & 4th Floor – 50 % Completed
    • Internal Finishes – Painting -Primer -Ground Floor – 50 % Completed,1st Floor – 80 % Completed, 2nd Floor – 75 % Completed, 3rd Floor to 4th Floor – 100 % Completed; Putty work – 2nd Floor – 75 % completed, 3rd Floor to 4th Floor – 100 % completed
    • Tiling work – Sample & Mockup Flat & Amenities Area – 90 % completed
    • Waterproofing work – 2nd Floor – 40 % completed & 3rd Floor – 70 % completed ; 4th Floor – 50 % completed ; 5th Floor – 50 % completed

    As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2025

    • BLOCK WORK – 13th to 16th floor to be complete
    • PLASTERING WORKS – Inside wall Plastering work – 6th Floor – 100 % to be completed,7th Floor & 8th – 100 % to be completed ; Ceiling plastering: 15th Floor & 16th Floor to be complete
    • Electrical works – Electrical Rope pulling – 16th Floor – 100 % to be Completed; Electrical work – Wall chasing & Box fixing- 7th Floor & 8th Floor – 100 % to be complete,
    • Fire Fighting Works
    • Plumbing Works (Concealed works) – Concealed works: 3rd floor & 4th Floor – 100 % to be complete
    • Internal Finishes – Painting -Primer – 5th Floor & 6th floor – 100 % to be Complete ; Putty work- 5th & 6th Floor – 50 % to be complete
    • Tiling work – Mockup , Sample, Amenities Area – 100 % to be completed
    • Waterproofing work-3rd Floor – 100 % to be completed , 4th Floor & 5th Floor- 100% to be completed

    Work status as on 07-10-2025 we have completed the following.

    • BLOCK WORK: Ground to 10th Floor – 100% completed;11th floor – 90 % Completed ; 12th Floor – 50 % Completed
    • PLASTERING WORKS: Inside wall Plastering work -Ground to 4th Floor – 100% completed, 5th Floor – 70 % Completed , 6th Floor – 40 % completed ; Ceiling plastering: Ground to 13th Floor – 100% completed, 14th floor – 80 % Completed.
    • Electrical works: Electrical Rope pulling -Basement to 14th Floor – 100 % Completed; Electrical work – Wall chasing & Box fixing-Ground to 6th Floor – 100 % completed,7th Floor – 50 % completed
    • Fire Fighting Works- 2nd Floor – 75 % Completed & , 3rd Floor – 25 % Completed
    • Fire Fighting Works- 2nd Floor – 75 % Completed & , 3rd Floor – 25 % Completed
    • Plumbing Works- Mockup & sample & Amenities area concealed works completed
    • Internal Finishes- Painting -Primer -Ground Floor – 50 % Completed,1st Floor – 80 % Completed, 2nd Floor – 75 % Completed, 3rd Floor – 90 % Completed; Putty work- 2nd Floor – 75 % completed, 3rd Floor – 75 % completed
    • Tiling work- Sample & Mockup Flat & Amenities Area – 90 % completed
    • Waterproofing work- 2nd Floor – 30 % completed & 3rd Floor – 70 % completed ; 4th Floor – 50 % completed ; 5th Floor – 30 % completed

    As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2025

    • CIVIL WORKS- Boundary wall works-15 % work to be Completed;Columns & Shear wall-,16th floor column work to be completed ;Slabs & Beam-Terrace Floor slab to be completed
    • BLOCK WORK- 11th to 13th floor to be completed
    • PLASTERING WORKS- Inside wall Plastering work – 5th Floor – 100 % to be completed,6th Floor – 100 % to be completed ; Ceiling plastering: 14th Floor & 15th Floor to be completed
    • Electrical works- Electrical Rope pulling – 15th Floor – 100 % to be Completed; Electrical work – Wall chasing & Box fixing- 7th Floor & 8th Floor – 100 % to be completed,
    • Plumbing Works – Concealed works: 3rd floor to be complete
    • Internal Finishes- Painting -Primer -3rd Floor & 4th floor – 100 % to be Completed; Putty work- 3rd Floor – 100% to be completed ; 4th Floor – 50 % to be completed
    • Tiling work – Mockup , Sample, Amenities Area – 100 % to be completed
    • Waterproofing work – 3rd Floor – 100 % to be completed , 4th Floor & 5th Floor- 100% to be completed

     

    Work status as on 09-09-2025, we have completed the following.

    • Sub Structural Works Piling Work-100 % completed
    • CIVIL WORKS Pile Cap , Plinth beam, Base slab- 100 % completed; Sump tank-100 % completed;Boundary wall works-85 % work Completed;Columns & Shear wall-Basement to 15th Floor column work – 100% work completed;Slabs & Beam-Ground to 16th floor – 100 % completed,Terrace Floor slab work ongoing
    • BLOCK WORK Ground to 8th Floor – 100% completed;9th floor – 90 % Completed ; 10th Floor – 20 % Completed
    • PLASTERING WORKS Inside wall Plastering work -Ground to 4th Floor – 100% completed, 5th Floor – 50 % Completed , 6th Floor – Started only ; Ceiling plastering: Ground to 11th Floor – 100% completed, 12th floor – 80 % Completed , 13th Floor – Started only
    • Electrical works Electrical Rope pulling -Basement to 12th Floor – 100 % Completed; Electrical work – Wall chasing & Box fixing-Ground to 6th Floor – 100 % completed,7th Floor – Started only
    • Fire Fighting Works 2nd Floor – 75 % Completed & , 3rd Floor – 25 % Completed
    • Plumbing Works Mockup & sample & Amenities area concealed works completed
    • Internal Finishes Painting -Primer -Ground Floor – 50 % Completed,1st Floor – 80 % Completed, 2nd Floor – 75 % Completed, 3rd Floor – 50 % Completed; Putty work- 2nd Floor – 75 % completed, 3rd Floor – 50 % completed
    • Tiling work Sample & Mockup Flat & Amenities Area – 50 % completed
    • Waterproofing work 2nd Floor – 30 % completed & 3rd Floor – 70 % completed ; 4th Floor – 50 % completed

    As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2025

    • CIVIL WORKS Boundary wall works-15 % work to be Completed;Columns & Shear wall-,16th floor column work to be completed ;Slabs & Beam-Terrace Floor slab to be completed
    • BLOCK WORK 9th to 11th floor to be completed
    • PLASTERING WORKS- Inside wall Plastering work – 5th Floor – 100 % to be completed,6th Floor – 100 % to be completed ; Ceiling plastering: 12th floor & 13th Floor & 14th Floor to be completed
    • Electrical works- Electrical Rope pulling – 13th Floor & 14th Floor – 100 % to be Completed; Electrical work – Wall chasing & Box fixing- 7th Floor & 8th Floor – 100 % to be completed,
    • Fire Fighting Works 3rd Floor – 100 % to be Completed
    • Plumbing Works Concealed works: 3rd floor to be complete
    • Internal Finishes Painting -Primer -3rd Floor – 50 % to be Completed; Putty work- 3rd Floor – 50 % to be completed
    • Tiling work Mockup , Sample, Amenities Area – 100 % to be completed
    • Waterproofing work 3rd Floor – 100 % to be completed , 4th Floor – 100% to be completed

    Work status as on 06-08-2025, we have completed the following.

    • Sub Structural Works Piling Work-100 % completed
    • CIVIL WORKS Pile Cap , Plinth beam, Base slab- 100 % completed; Sump tank-100 % completed;Boundary wall works-85 % work Completed;Columns & Shear wall-Basement to 13th Floor – 100 % Completed,14th Floor column work – 90% work completed;Slabs & Beam-Ground to 14th floor – 100 % completed,15th Floor slab work ongoing
    • BLOCK WORK Ground to 8th Floor – 100% completed;9th floor – started only
    • PLASTERING WORKS Inside wall Plastering work -Ground to 3rd Floor – 100% completed,4th floor – 90 % completed, 5th Floor – started only; Ceiling plastering: Ground to 10th Floor – 100% completed, 11th floor – started only
    • Electrical works Electrical Rope pulling -Basement to 11th Floor – 100 % Completed; Electrical work – Wall chasing & Box fixing-Ground to 5th Floor – 100 % completed,6th Floor – 90 % completed,
    • Fire Fighting Works 2 no.of Flat completed
    • Plumbing Works Mockup & sample & Amenities area concealed works completed
    • Internal Finishes Painting -Primer -Ground Floor – 50 % Completed,1st Floor – 80 % Completed, 2nd Floor – 75 % Completed, 3rd Floor – 50 % Completed; Putty work- 2nd Floor – 75 % completed, 3rd Floor – 50 % completed
    • Tiling work Amenities area started only
    • Waterproofing work 2nd Floor – 30 % completed & 3rd Floor – 40 % completed

    As per the current work status from our site, we are targeted to complete the following works by the end of AUGUST 2025.

    • CIVIL WORKS Boundary wall works-15 % work to be Completed;Columns & Shear wall-,14th Floor & 15th floor column work to be completed ;Slabs & Beam-15th Floor slab & 16th Floor slab to be completed
    • BLOCK WORK 9th floor to be completed
    • PLASTERING WORKS- Inside wall Plastering work -4th floor – 10 % to be completed, 5th Floor – 100 % to be completed,6th Floor – 50 % to be completed ; Ceiling plastering: 11th floor & 12th Floor to be completed
    • Electrical works- Electrical Rope pulling – 12th Floor & 13th Floor – 100 % to be Completed; Electrical work – Wall chasing & Box fixing-Ground to 6th Floor – 10 %to be completed,7th Floor – 100 % to be completed,
    • Fire Fighting Works
    • Plumbing Works Concealed works: 3rd floor to be complete
    • Internal Finishes Painting -Primer -3rd Floor – 50 % to be Completed; Putty work- 3rd Floor – 50 % to be completed
    • Tiling work Mockup , Sample, Amenities Area – 100 % to be completed
    • Waterproofing work 3rd Floor – 60 % to be completed , 4th Floor – 50% to be completed

    Work status as on 09-06-2025, we have completed the following.

    • Sub Structural Works – Column RCC-28 cum, Beam & slab & Staircase RCC-174 cum, Staircase RCC – 4 cum, Shear wall RCC -4 cum, Sump tank cover slab- 39cum
    • BLOCK WORK – 8″Block work-57.48 cum,4″Block work- 175.78 sqm,
    • PLASTERING WORKS – Wall Plastering; 395 Sqm Ceiling plastering: 440 sqm completed
    • Electrical works – Electrical Rope pulling 6th,7th floor completed,Electrical work – wall chasing & box fixing-1 flat completed
    • Waterproofing Works – Waterproofing work- 135 sqft, Waterproofing work – Apartments- 154 sqm, Core cutting-2flat
    • Internal Finishes – Painting -primer – Painting -primer -3A-450 sqft ,Handrail work – Main Staircase- 35Rm

    As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2025.

    • Sub Structural Works – Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-8cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed ,Parapet wall-16 cum, Boundary wall base- 22.4 cum, Boundary Retaining wall-
    • BLOCK WORK – 8″ Block Work: 130m3 ,4″ Block Work- 350 sqm to be completed
    • PLASTERING WORKS – Wall Plastering-1035 sqm, Ceiling plastering- 890 sqm to be completed
    • Electrical works – Electrical Rope pulling -3 floors to be completed, Wall chasing & box fixing- 5 apartments to be completed, Electrical wire pulling-2 flats
    • Waterproofing Works – Waterproofing work- Retaining Wall- 420 sqft to be completed, Core cutting- 4 flats to be completed, Waterproofing work – Apartments- 141.4 sqm to be completed, Door Frame fixing – 8apartments to be completed
    • Internal Finishes – Painting -primer 900 sqft to be completed, Plumbing- 2 Flats to be completed, Tiling work-230sqm

    Work status as on 09-05-2025, we have completed the following.

    • Sub Structural Works – Column RCC-28cum, Beam & slab & Staircase (2nd flight) RCC-174 cum, Staircase (1st flight & landing) RCC – 4cum, Shear wall RCC -4 cum, Sump tank cover slab- 39cum
    • BLOCK WORK – 8″Block work-63.03 cum,4″Block work- 215.11 sqm,
    • PLASTERING WORKS – Wall Plastering; 517 Sqm Ceiling plastering: 664.94 sqm completed
    • Electrical works – Electrical Rope pulling 6th,7th floor completed,Electrical work – wall chasing & box fixing-1 flat completed
    • Waterproofing Works – Waterproofing work- 700 sq ft, Waterproofing work – Apartments- 154 sqm, Core cutting-1 flat
    • Internal Finishes – Painting -primer -2A-450 sqft

    As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2025.

    • Sub Structural Works – Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-8cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed ,Parapet wall-16 cum,
    • BLOCK WORK – 8″ Block Work: 120m3 ,4″ Block Work- 450 sqm to be completed
    • PLASTERING WORKS – Wall Plastering-600 sqm, Ceiling plastering- 800 sqm to be completed
    • Electrical works – Electrical Rope pulling -2 floors to be completed, Wall chasing & box fixing- 7 apartments to be completed,
    • Waterproofing Works – Waterproofing work- Retaining Wall- 420 sqft to be completed, Core cutting- 5 flats to be completed, Waterproofing work – Apartments- 141.4 sqm to be completed, Door Frame fixing – 14 apartments to be completed
    • Internal Finishes – Painting -primer 900 sqft to be completed, Plumbing- 2 Flats to be completed

    Work status as on 10-04-2025, we have completed the following.

    • Sub Structural Works – Column RCC-28cum, Beam & slab & Staircase (2nd flight) RCC-174 cum, Staircase (1st flight & landing) RCC – 4cum, Shear wall RCC -4 cum, Sump tank cover slab- 28 cum, Earth work excavation- 45 cum
    • BLOCK WORK – 8″Block work-63.03 cum,4″Block work- 215.11 sqm,
    • PLASTERING WORKS – Wall Plastering; 219.48 Sqm Ceiling plastering: 664.94 sqm completed
    • Electrical works – Electrical Rope pulling 6th,7th floor completed,Electrical work – wall chasing & box fixing-1 flat completed
    • Waterproofing work- 1211 sqft, Waterproofing work – Apartments- 154 sqm, Core cutting-1 flat

    As per the current work status from our site, we are targeted to complete the following works by the end of APRIL 2025.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-110 cum, Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-8cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed ,Parapet wall-16 cum,
    • BLOCK WORK – 8″ Block Work: 132m3 ,4″ Block Work- 416 to be completed
    • PLASTERING WORKS – Wall Plastering-600 sqm, Ceiling plastering- 900 sqm to be completed
    • Electrical Rope pulling -2 floors to be completed, Wall chasing & box fixing- 7 apartments to be completed,
    • Waterproofing work- Retaining Wall- 420 sqft to be completed, Core cutting- 5 flats to be completed, Waterproofing work – Apartments- 141.4 sqm to be completed, Door Frame fixing – 7 apartments to be completed

    Work status as on 10-03-2025, we have completed the following.

    • Sub Structural Works – Earth work excavation for sump tank 110m3 Pile chipping 6 Rm Column RCC 26 cum,Beam & slab & Staircase (2nd flight) RCC 174 cum,Staircase (1st flight & landing) RCC 6cum,Shear wall RCC 7cum,Sump tank base 49cum, Beam & slab & Staircase (2nd flight) RCC-68cum completed,Staircase (1st flight & landing) RCC- 4 cum, Shear wall RCC-7 cum, Sump tank wall- 38.58cum,
    • BLOCK WORK – 8″Block work 76.57cum , 4″Block work 286.34 sqm
    • PLASTERING WORKS – Wall Plastering; 1157sqm completed out of 35000sqm Ceiling plastering: 664.94 sqm completed
    • Electrical works – Electrical Rope pulling 6th,7th floor completed,Electrical work – wall chasing & box fixing-1 flat completed

    As per the current work status from our site, we are targeted to complete the following works by the end of MARCH 2025.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-110 cum, Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-7cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed
    • BLOCK WORK – 8″ Block Work: 70m3 ,4″ Block Work-240 to be completed
    • PLASTERING WORKS – Wall Plastering-600 sqm, Ceiling plastering- 500 sqm to be completed

    Work status as on 13-02-2025, we have completed the following.

    • Sub Structural Works – Earth work excavation for sump tank 110m3 Pile chipping 6 Rm Column RCC 40 cum,Beam & slab & Staircase (2nd flight) RCC 174 cum,Staircase (1st flight & landing) RCC 6cum,Shear wall RCC 7cum,Sump tank base 49cum,
    • BLOCK WORK – 8″Block work 50 cum , 4″Block work 113 sqm
    • PLASTERING WORKS – Wall Plastering; 1157sqm completed out of 35000sqm Ceiling plastering: 331sqm completed
    • Electrical works- Electrical Rope pulling 5th floor completed

    As per the current work status from our site, we are targeted to complete the following works by the end of FEBRUARY 2025.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-110 cum, Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-7cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed
    • BLOCK WORK- 8″ Block Work: 70m3 ,4″ Block Work-240 to be completed
    • PLASTERING WORKS – Wall Plastering-600 sqm, Ceiling plastering- 500 sqm to be completed

    • Air-conditioned Multi-Purpose Hall for association and other activities.
    • Air Conditioned Unisex Gym
    • Air Conditioned state of the art AV Room
    • Guest Suite
    • Indoor Games Room
    • Rooftop Party Area
    • Children’s Play Area

    • Video door phone with intercom facility
    • Common toilet for supporting staff
    • Reticulated LPG supply
    • Gas leakage detector
    • Boom barrier
    • Access control system
    • Surveillance camera system
    • Common Electric car charging point
    • Efficient waste disposable system
    • Fire Suppression system
    • Car wash facility
    • Drivers Dormitory

    Are you on the lookout for a home loan? We can help you. We have tie-ups with prominent banks for this project. It will help you make the loan application process easier.

    • AXIS
    • SOUTH INDIAN BANK
    • BANK OF BARODA
    • HDFC
    • FEDERAL BANK
    • ICICI
    • UCO

    Work status as on 10-03-2025, we have completed the following.

    • Sub Structural Works – Earth work excavation for sump tank 110m3 Pile chipping 6 Rm Column RCC 26 cum,Beam & slab & Staircase (2nd flight) RCC 174 cum,Staircase (1st flight & landing) RCC 6cum,Shear wall RCC 7cum,Sump tank base 49cum, Beam & slab & Staircase (2nd flight) RCC-68cum completed,Staircase (1st flight & landing) RCC- 4 cum, Shear wall RCC-7 cum, Sump tank wall- 38.58cum,
    • BLOCK WORK – 8″Block work 76.57cum , 4″Block work 286.34 sqm
    • PLASTERING WORKS – Wall Plastering; 1157sqm completed out of 35000sqm Ceiling plastering: 664.94 sqm completed
    • Electrical works – Electrical Rope pulling 6th,7th floor completed,Electrical work – wall chasing & box fixing-1 flat completed

    As per the current work status from our site, we are targeted to complete the following works by the end of MARCH 2025.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-110 cum, Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-7cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed
    • BLOCK WORK – 8″ Block Work: 70m3 ,4″ Block Work-240 to be completed
    • PLASTERING WORKS – Wall Plastering-600 sqm, Ceiling plastering- 500 sqm to be completed

    Work status as on 13-02-2025, we have completed the following.

    • Sub Structural Works – Earth work excavation for sump tank 110m3 Pile chipping 6 Rm Column RCC 40 cum,Beam & slab & Staircase (2nd flight) RCC 174 cum,Staircase (1st flight & landing) RCC 6cum,Shear wall RCC 7cum,Sump tank base 49cum,
    • BLOCK WORK – 8″Block work 50 cum , 4″Block work 113 sqm
    • PLASTERING WORKS – Wall Plastering; 1157sqm completed out of 35000sqm Ceiling plastering: 331sqm completed
    • Electrical works- Electrical Rope pulling 5th floor completed

    As per the current work status from our site, we are targeted to complete the following works by the end of FEBRUARY 2025.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-110 cum, Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-7cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed
    • BLOCK WORK- 8″ Block Work: 70m3 ,4″ Block Work-240 to be completed
    • PLASTERING WORKS – Wall Plastering-600 sqm, Ceiling plastering- 500 sqm to be completed

    Work status as on 12-12-2024, we have completed the following.

    • Sub Structural Works – Pile concreting 111 nos. completed Pile integrity test – completed ,Pile chipping 101 nos: completed out of 111 Nos.Excavation of pile cap foundation – 1993 m3 completed out of 2660m3 PCC for pilecap – 105m3 completed out of 120 m3 , RCC for pile cap – 250m3 completed out of 275m3 RCC for plinth beam and raft slab – 235m3 completed out of 260m3 ,RCC retaining wall 125 m3 completed out of 195m3 Column RCC – 210m3 completed out of 800m3 Auger Pile RCC-11cum completed out of 11cum SLAB: Ground Floor Slab, First Floor Slab,2nd,3rd,4th 5th slab completed
    • BLOCK WORK – 8″ Block Work: 12 m3 completed out of 1750m3
    • PLASTERING WORKS – Wall Plastering; 407sqm completed out of 35000sqm Ceiling plastering: 2341 sqm completed out of 9000sqm

    As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2024.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-445.08cum, Pile chipping-15 Rm,Column RCC-44 cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-7cum ,Sunshade drop- 35.6 cum, Sump tank base-43 cum to be completed
    • BLOCK WORK – 8″ Block Work: 70m3to be completed
    • PLASTERING WORKS – Ceiling plastering- 500 sqm to be completed

    Work status as on 08-11-2024, we have completed the following.

    • Sub Structural Works – Pile concreting 111 nos. completed Pile integrity test – completed ,Pile chipping 101 nos: completed out of 111 Nos.Excavation of pile cap foundation – 1993 m3 completed out of 2660m3 PCC for pilecap – 105m3 completed out of 120 m3 , RCC for pile cap – 250m3 completed out of 275m3 RCC for plinth beam and raft slab – 235m3 completed out of 260m3 ,RCC retaining wall 125 m3 completed out of 195m3 Column RCC – 210m3 completed out of 800m3 Auger Pile RCC-11cum completed out of 11cum SLAB: Ground Floor Slab, First Floor Slab,2nd,3rd,4th 5th slab completed
    • BLOCK WORK – 8″ Block Work: 12 m3 completed out of 1750m3
    • PLASTERING WORKS – Wall Plastering; 407sqm completed out of 35000sqm Ceiling plastering: 2341 sqm completed out of 9000sqm

    As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2024.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-445.08cum, Pile chipping-15 Rm,Column RCC-44 cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-7cum ,Sunshade drop- 35.6 cum, Sump tank base-43 cum to be completed
    • BLOCK WORK – 8″ Block Work: 70m3to be completed
    • PLASTERING WORKS – Ceiling plastering- 500 sqm to be completed

    Work status as on 08-11-2024, we have completed the following.

    • Sub Structural Works – Pile concreting 111 nos. completed Pile integrity test – completed ,Pile chipping 101 nos: completed out of 111 Nos.Excavation of pile cap foundation – 1993 m3 completed out of 2660m3 PCC for pilecap – 105m3 completed out of 120 m3 RCC for pile cap – 250m3 completed out of 275m3 RCC for plinth beam and raft slab – 235m3 completed out of 260m3 ,RCC retaining wall 125 m3 completed out of 195m3 Column RCC – 143 m3 completed out of 800m3 Auger Pile RCC-11cum completed out of 11cum Ground Floor Slab:175cum out of 187cum completed First Floor Slab:160cum out of 160cum completed Second Floor Slab:172cum out of 172 cum completed
    • BLOCK WORK 8″ Block Work: 12 m3 completed out of 1750m3
    • PLASTERING WORKS – Wall Plastering; 164 sqm completed out of 35000sqm Ceiling plastering: 654sqm completed out of 9000sqm

    As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2024.

    • Sub Structural Works – Column rcc 60cum, Beam and slab rcc 300 cum ,Staircase 10cum ,Shear wall 10cum, Sunshade drop 100 sqm to be completed
    • BLOCK WORK 8″ Block Work: 30m3to be completed
    • PLASTERING WORKS – Inside Plastering; 500sqm to be completed

    Work status as on 14-10-2024, we have completed the following.

    • Sub structural works – Pile concreting 111 nos. completed Pile integrity test – completed ,Pile chipping 101 nos: completed out of 111 Nos.Excavation of pile cap foundation – 1970m3 completed out of 2100m3 PCC for pilecap – 120m3 completed out of 155m3 RCC for pile cap – 250m3 completed out of 275m3 RCC for plinth beam and raft slab – 235m3 completed out of 260m3 ,RCC retaining wall 130m3 completed out of 200m3 Column RCC – 165m3 completed out of 800m3 Auger Pile RCC-11cum completed out of 11cum Ground Floor Slab:192cum out of 220cum completed First Floor Slab:187cum out of 187cum completed Second Floor Slab:172cum out of 172 cum completed
    • BLOCK WORK- 8″ Block Work: 12m3 completed out of 1750m3
    • PLASTERING WORKS- Wall Plastering; 88sqm completed out of 350000sqm Ceiling plastering: 80sqm completed out of 9000sqm

    As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2024.

    • Sub Structural Works – Column rcc 60cum, Beam and slab rcc 300 cum ,Staircase 10cum ,Shear wall 10cum, Sunshade drop 100 sqm to be completed
    • BLOCK WORK8″ Block Work: 30m3to be completed
    • PLASTERING WORKS- Inside Plastering; 500sqm to be completed

    Work status as on 12-09-2024, we have completed the following.

    • Sub structural works – Pile concreting 111 nos. completed Pile integrity test – completed ,Pile chipping 101 nos: completed out of 111 Nos.Excavation of pile cap foundation – 1970m3 completed out of 2100m3 PCC for pilecap – 120m3 completed out of 155m3 ,RCC for pile cap – 250m3 completed out of 275m3 RCC for plinth beam and raft slab – 235m3 completed out of 260m3 ,RCC retaining wall 130m3 completed out of 200m3 Column RCC – 78m3 completed out of 800m3 Auger Pile RCC-11cum completed out of 11cum

    As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2024.

    • Sub Structural Works – Pile chipping – 10 more nos: to be completed, Excavation of pile cap foundation – to be completed, Column and shear wall RCC 20m3 to be completed, Retaining wall RCC – 42m3 to be completed, Basement floor Roof slab RCC – 85m3 to be completed, GF roof slab 75m3 to be completed

    Work status as on 13-08-2024, we have completed the following.

    • Sub structural works – Pile concreting 111 nos. completed,Pile integrity test – completed,Pile chipping 101 nos: completed out of 111 Nos.Excavation of pile cap foundation – 1680m3 completed out of 1800m3 ,PCC for pilecap – 221m3 completed out of 255m3 ,RCC for pile cap – 305m3 completed out of 325m3,RCC for plinth beam and raft slab – 349m3 completed out of 381m3 ,RCC retaining wall 83m3 completed out of 125m3,Column RCC – 27m3 completed out of 800m3,Auger Pile RCC-11cum completed out of 11cum.

    As per the current work status from our site, we are targeted to complete the following works by the end of AUGUST 2024.

    • Sub Structural Works – Pile chipping – 10 more nos: to be completed,Excavation of pile cap foundation – 120 cum to be completed,Column and shear wall RCC 20m3 to be completed,Retaining wall RCC – 42m3 to be completed,Basement floor Roof slab RCC – 85m3 to be completed,GF roof slab 75m3 to be completed

    Work status as on 09-07-2024, we have completed the following.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – completed , Pile chipping 89 nos: completed out of 111 Nos:, Excavation of pile cap foundation – 1665m3 completed out of 1800m3, PCC for pilecap – 221m3 completed out of 255m3, RCC for pile cap – 305m3 completed out of 325m3, RCC for plinth beam and raft slab – 349m3 completed out of 381m3, RCC retaining wall 83m3 completed out of 125m3, column RCC – 27m3 completed out of 800m3

    As per the current work status from our site, we are targeted to complete the following works by the end of JULY 2024.

    • Sub Structural Works – Earth back filling – 60m3 to be completed, pile chipping – 11 more nos: to be completed, pilecap RCC – 1m3 to be completed, Column and shear wall RCC 20m3 to be completed, retaining wall RCC – 20m3 to be completed, Basement floor Roof slab RCC – 85m3 to be completed, GF roof slab 75m3 to be completed

    Work status as on 11-06-2024, we have completed the following.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – completed , Pile chipping 89 nos: completed out of 111 Nos:, Excavation of pile cap foundation – 1516m3 completed out of 1800m3, PCC for pilecap – 108m3 completed out of 255m3, RCC for pile cap – 183m3 completed out of 325m3, RCC for plinth beam and raft slab – 135m3 completed out of 381m3, RCC retaining wall 33m3 completed out of 125m3, column RCC – 27m3 completed out of 800m3

    As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2024.

    • Sub Structural Works – Earth work – 250m3 to be completed, pile chipping – 11 more nos: to be completed, PCC work – 35m3 to be completed, pilecap RCC – 25m3 to be completed, plinth beam and raft slab – 30m3 to be completed, Column RCC – 25m3 to be completed, retaining wall RCC – 5m3 to be completed, Roof slab RCC – 90m3 to be completed

    Work status as on 09-05-2024, we have completed the following.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – completed , Pile chipping 76 nos: completed out of 111 Nos:, Excavation of pile cap foundation – 1386m3 completed out of 1800m3, PCC for pilecap – 105.4m3 completed out of 255m3, RCC for pile cap – 158.7m3 completed out of 325m3, RCC for plinth beam and raft slab – 135m3 completed out of 381m3, RCC retaining wall 33m3 completed out of 125m3, column RCC – 27m3 completed out of 800m3

    As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2024.

    • Sub Structural Works – Earth work – 245m3 to be completed, pile chipping – 14 more nos: to be completed, PCC work – 25m3 to be completed, pilecap RCC – 42m3 to be completed, plinth beam and raft slab – 70m3 to be completed, Column RCC – 10m3 to be completed, retaining wall RCC – 8m3 to be completed, Boundary wall RCC – 22m3 to be completed, Roof slab RCC – 95m3 to be completed

    We are pleased to inform you the current work progress at our site Artech “Marvel”, Pattom, Few snaps of the work progress is attached for your reference.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – completed , Pile chipping 62 nos: completed out of 111 Nos:, Excavation of pile cap foundation – 1041m3 completed out of 1300m3, PCC for pilecap – 88.6m3 completed out of 255m3, RCC for pile cap – 148.1m3 completed out of 325m3, RCC for plinth beam and raft slab – 131m3 completed out of 381m3, RCC retaining wall 33m3 completed out of 125m3, column RCC – 27m3 completed out of 800m3

    We are pleased to inform you the current work progress at our site Artech “Marvel”, Pattom, Few snaps of the work progress is attached for your reference.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – 36nos: completed out of 85nos: , Pile chipping 58 nos: completed out of 111 Nos:, Excavation of pile cap foundation – 836m3 completed out of 1300m3, PCC for pilecap – 66.5m3 completed out of 255m3, RCC for pile cap – 128.5m3 completed out of 325m3, RCC for plinth beam and raft slab – 109m3 completed out of 381m3, RCC retaining wall 14m3 completed out of 125m3, column RCC – 7m3 completed out of 800m3

    We are pleased to inform you the current work progress at our site Artech “Marvel”, Pattom, Few snaps of the work progress is attached for your reference.

    • Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – 36nos: completed out of 85nos: , Pile chipping 54 nos completed out of 111 Nos:, Excavation of pile cap foundation – 633m3 completed out of 1300m3, PCC for pilecap – 45.5m3 completed out of 255m3, RCC for pile cap – 128.5m3 completed out of 325m3, RCC for plinth beam and raft slab – 60m3 completed out of 381m3

    We are pleased to inform you the current work progress at our site Artech “Marvel”, Pattom, Few snaps of the work progress is attached for your reference.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile integrity test – 36nos: completed out of 85nos: , Pile chipping 36 nos completed out of 111 Nos:, Excavation of pile cap foundation – 401m3 completed out of 1300m3, PCC for pilecap – 18.7m3 completed out of 255m3, RCC for pile cap – 62m3 completed out of 325m3, RCC for plinth beam and raft slab – 7m3 completed out of 381m3

    We are pleased to inform you the current work progress at our site Artech “Marvel”, Pattom, Few snaps of the work progress is attached for your reference.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile chipping 22 nos completed out of 111 Nos:, Excavation of pile cap foundation – 335m3 completed out of 1300m3, PCC for pilecap – 6.8m3 completed out of 255m3, RCC for pile cap – 43.3m3 completed out of 325m3, RCC for plinth beam and raft slab – 2m3 completed out of 381m3

    We are pleased to inform you the current work progress at our site Artech “Marvel”, Pattom, Few snaps of the work progress is attached for your reference.

    • Sub Structural Works – Sub structural works – Pile concreting 111 Nos: completed, Pile cap 5 Nos completed out of 57 Nos:, pile chipping 11 nos completed out of 111 Nos:

    Work status as on 06-11-2025, we have completed the following.

    • BLOCK WORK – Ground to 12th Floor – 100% completed;13th floor – 90 % Completed ; 14th Floor – 80 % Completed
    • PLASTERING WORKS – Inside wall Plastering work -Ground to 5th Floor – 100% completed, 6th Floor – 90 % Completed Ceiling plastering: Ground to 14th Floor – 100% completed, 15th floor – 70 % Completed.
    • Electrical works – Electrical Rope pulling -Basement to 15th Floor – 100 % Completed, ; Electrical work – Wall chasing & Box fixing-Ground 7th Floor – 100 % Completed ; 8th Floor – 20 % completed
    • Fire Fighting Works – 2nd Floor – 75 % Completed & , 3rd Floor – 25 % Completed
    • Plumbing Works (Concealed works) – Mockup & sample & Amenities area concealed works completed ; 3rd Floor & 4th Floor – 50 % Completed
    • Internal Finishes – Painting -Primer -Ground Floor – 50 % Completed,1st Floor – 80 % Completed, 2nd Floor – 75 % Completed, 3rd Floor to 4th Floor – 100 % Completed; Putty work – 2nd Floor – 75 % completed, 3rd Floor to 4th Floor – 100 % completed
    • Tiling work – Sample & Mockup Flat & Amenities Area – 90 % completed
    • Waterproofing work – 2nd Floor – 40 % completed & 3rd Floor – 70 % completed ; 4th Floor – 50 % completed ; 5th Floor – 50 % completed

    As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2025

    • BLOCK WORK – 13th to 16th floor to be complete
    • PLASTERING WORKS – Inside wall Plastering work – 6th Floor – 100 % to be completed,7th Floor & 8th – 100 % to be completed ; Ceiling plastering: 15th Floor & 16th Floor to be complete
    • Electrical works – Electrical Rope pulling – 16th Floor – 100 % to be Completed; Electrical work – Wall chasing & Box fixing- 7th Floor & 8th Floor – 100 % to be complete,
    • Fire Fighting Works
    • Plumbing Works (Concealed works) – Concealed works: 3rd floor & 4th Floor – 100 % to be complete
    • Internal Finishes – Painting -Primer – 5th Floor & 6th floor – 100 % to be Complete ; Putty work- 5th & 6th Floor – 50 % to be complete
    • Tiling work – Mockup , Sample, Amenities Area – 100 % to be completed
    • Waterproofing work-3rd Floor – 100 % to be completed , 4th Floor & 5th Floor- 100% to be completed

    Work status as on 07-10-2025 we have completed the following.

    • BLOCK WORK: Ground to 10th Floor – 100% completed;11th floor – 90 % Completed ; 12th Floor – 50 % Completed
    • PLASTERING WORKS: Inside wall Plastering work -Ground to 4th Floor – 100% completed, 5th Floor – 70 % Completed , 6th Floor – 40 % completed ; Ceiling plastering: Ground to 13th Floor – 100% completed, 14th floor – 80 % Completed.
    • Electrical works: Electrical Rope pulling -Basement to 14th Floor – 100 % Completed; Electrical work – Wall chasing & Box fixing-Ground to 6th Floor – 100 % completed,7th Floor – 50 % completed
    • Fire Fighting Works- 2nd Floor – 75 % Completed & , 3rd Floor – 25 % Completed
    • Fire Fighting Works- 2nd Floor – 75 % Completed & , 3rd Floor – 25 % Completed
    • Plumbing Works- Mockup & sample & Amenities area concealed works completed
    • Internal Finishes- Painting -Primer -Ground Floor – 50 % Completed,1st Floor – 80 % Completed, 2nd Floor – 75 % Completed, 3rd Floor – 90 % Completed; Putty work- 2nd Floor – 75 % completed, 3rd Floor – 75 % completed
    • Tiling work- Sample & Mockup Flat & Amenities Area – 90 % completed
    • Waterproofing work- 2nd Floor – 30 % completed & 3rd Floor – 70 % completed ; 4th Floor – 50 % completed ; 5th Floor – 30 % completed

    As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2025

    • CIVIL WORKS- Boundary wall works-15 % work to be Completed;Columns & Shear wall-,16th floor column work to be completed ;Slabs & Beam-Terrace Floor slab to be completed
    • BLOCK WORK- 11th to 13th floor to be completed
    • PLASTERING WORKS- Inside wall Plastering work – 5th Floor – 100 % to be completed,6th Floor – 100 % to be completed ; Ceiling plastering: 14th Floor & 15th Floor to be completed
    • Electrical works- Electrical Rope pulling – 15th Floor – 100 % to be Completed; Electrical work – Wall chasing & Box fixing- 7th Floor & 8th Floor – 100 % to be completed,
    • Plumbing Works – Concealed works: 3rd floor to be complete
    • Internal Finishes- Painting -Primer -3rd Floor & 4th floor – 100 % to be Completed; Putty work- 3rd Floor – 100% to be completed ; 4th Floor – 50 % to be completed
    • Tiling work – Mockup , Sample, Amenities Area – 100 % to be completed
    • Waterproofing work – 3rd Floor – 100 % to be completed , 4th Floor & 5th Floor- 100% to be completed

     

    Work status as on 09-09-2025, we have completed the following.

    • Sub Structural Works Piling Work-100 % completed
    • CIVIL WORKS Pile Cap , Plinth beam, Base slab- 100 % completed; Sump tank-100 % completed;Boundary wall works-85 % work Completed;Columns & Shear wall-Basement to 15th Floor column work – 100% work completed;Slabs & Beam-Ground to 16th floor – 100 % completed,Terrace Floor slab work ongoing
    • BLOCK WORK Ground to 8th Floor – 100% completed;9th floor – 90 % Completed ; 10th Floor – 20 % Completed
    • PLASTERING WORKS Inside wall Plastering work -Ground to 4th Floor – 100% completed, 5th Floor – 50 % Completed , 6th Floor – Started only ; Ceiling plastering: Ground to 11th Floor – 100% completed, 12th floor – 80 % Completed , 13th Floor – Started only
    • Electrical works Electrical Rope pulling -Basement to 12th Floor – 100 % Completed; Electrical work – Wall chasing & Box fixing-Ground to 6th Floor – 100 % completed,7th Floor – Started only
    • Fire Fighting Works 2nd Floor – 75 % Completed & , 3rd Floor – 25 % Completed
    • Plumbing Works Mockup & sample & Amenities area concealed works completed
    • Internal Finishes Painting -Primer -Ground Floor – 50 % Completed,1st Floor – 80 % Completed, 2nd Floor – 75 % Completed, 3rd Floor – 50 % Completed; Putty work- 2nd Floor – 75 % completed, 3rd Floor – 50 % completed
    • Tiling work Sample & Mockup Flat & Amenities Area – 50 % completed
    • Waterproofing work 2nd Floor – 30 % completed & 3rd Floor – 70 % completed ; 4th Floor – 50 % completed

    As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2025

    • CIVIL WORKS Boundary wall works-15 % work to be Completed;Columns & Shear wall-,16th floor column work to be completed ;Slabs & Beam-Terrace Floor slab to be completed
    • BLOCK WORK 9th to 11th floor to be completed
    • PLASTERING WORKS- Inside wall Plastering work – 5th Floor – 100 % to be completed,6th Floor – 100 % to be completed ; Ceiling plastering: 12th floor & 13th Floor & 14th Floor to be completed
    • Electrical works- Electrical Rope pulling – 13th Floor & 14th Floor – 100 % to be Completed; Electrical work – Wall chasing & Box fixing- 7th Floor & 8th Floor – 100 % to be completed,
    • Fire Fighting Works 3rd Floor – 100 % to be Completed
    • Plumbing Works Concealed works: 3rd floor to be complete
    • Internal Finishes Painting -Primer -3rd Floor – 50 % to be Completed; Putty work- 3rd Floor – 50 % to be completed
    • Tiling work Mockup , Sample, Amenities Area – 100 % to be completed
    • Waterproofing work 3rd Floor – 100 % to be completed , 4th Floor – 100% to be completed

    Work status as on 06-08-2025, we have completed the following.

    • Sub Structural Works Piling Work-100 % completed
    • CIVIL WORKS Pile Cap , Plinth beam, Base slab- 100 % completed; Sump tank-100 % completed;Boundary wall works-85 % work Completed;Columns & Shear wall-Basement to 13th Floor – 100 % Completed,14th Floor column work – 90% work completed;Slabs & Beam-Ground to 14th floor – 100 % completed,15th Floor slab work ongoing
    • BLOCK WORK Ground to 8th Floor – 100% completed;9th floor – started only
    • PLASTERING WORKS Inside wall Plastering work -Ground to 3rd Floor – 100% completed,4th floor – 90 % completed, 5th Floor – started only; Ceiling plastering: Ground to 10th Floor – 100% completed, 11th floor – started only
    • Electrical works Electrical Rope pulling -Basement to 11th Floor – 100 % Completed; Electrical work – Wall chasing & Box fixing-Ground to 5th Floor – 100 % completed,6th Floor – 90 % completed,
    • Fire Fighting Works 2 no.of Flat completed
    • Plumbing Works Mockup & sample & Amenities area concealed works completed
    • Internal Finishes Painting -Primer -Ground Floor – 50 % Completed,1st Floor – 80 % Completed, 2nd Floor – 75 % Completed, 3rd Floor – 50 % Completed; Putty work- 2nd Floor – 75 % completed, 3rd Floor – 50 % completed
    • Tiling work Amenities area started only
    • Waterproofing work 2nd Floor – 30 % completed & 3rd Floor – 40 % completed

    As per the current work status from our site, we are targeted to complete the following works by the end of AUGUST 2025.

    • CIVIL WORKS Boundary wall works-15 % work to be Completed;Columns & Shear wall-,14th Floor & 15th floor column work to be completed ;Slabs & Beam-15th Floor slab & 16th Floor slab to be completed
    • BLOCK WORK 9th floor to be completed
    • PLASTERING WORKS- Inside wall Plastering work -4th floor – 10 % to be completed, 5th Floor – 100 % to be completed,6th Floor – 50 % to be completed ; Ceiling plastering: 11th floor & 12th Floor to be completed
    • Electrical works- Electrical Rope pulling – 12th Floor & 13th Floor – 100 % to be Completed; Electrical work – Wall chasing & Box fixing-Ground to 6th Floor – 10 %to be completed,7th Floor – 100 % to be completed,
    • Fire Fighting Works
    • Plumbing Works Concealed works: 3rd floor to be complete
    • Internal Finishes Painting -Primer -3rd Floor – 50 % to be Completed; Putty work- 3rd Floor – 50 % to be completed
    • Tiling work Mockup , Sample, Amenities Area – 100 % to be completed
    • Waterproofing work 3rd Floor – 60 % to be completed , 4th Floor – 50% to be completed

    Work status as on 09-06-2025, we have completed the following.

    • Sub Structural Works – Column RCC-28 cum, Beam & slab & Staircase RCC-174 cum, Staircase RCC – 4 cum, Shear wall RCC -4 cum, Sump tank cover slab- 39cum
    • BLOCK WORK – 8″Block work-57.48 cum,4″Block work- 175.78 sqm,
    • PLASTERING WORKS – Wall Plastering; 395 Sqm Ceiling plastering: 440 sqm completed
    • Electrical works – Electrical Rope pulling 6th,7th floor completed,Electrical work – wall chasing & box fixing-1 flat completed
    • Waterproofing Works – Waterproofing work- 135 sqft, Waterproofing work – Apartments- 154 sqm, Core cutting-2flat
    • Internal Finishes – Painting -primer – Painting -primer -3A-450 sqft ,Handrail work – Main Staircase- 35Rm

    As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2025.

    • Sub Structural Works – Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-8cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed ,Parapet wall-16 cum, Boundary wall base- 22.4 cum, Boundary Retaining wall-
    • BLOCK WORK – 8″ Block Work: 130m3 ,4″ Block Work- 350 sqm to be completed
    • PLASTERING WORKS – Wall Plastering-1035 sqm, Ceiling plastering- 890 sqm to be completed
    • Electrical works – Electrical Rope pulling -3 floors to be completed, Wall chasing & box fixing- 5 apartments to be completed, Electrical wire pulling-2 flats
    • Waterproofing Works – Waterproofing work- Retaining Wall- 420 sqft to be completed, Core cutting- 4 flats to be completed, Waterproofing work – Apartments- 141.4 sqm to be completed, Door Frame fixing – 8apartments to be completed
    • Internal Finishes – Painting -primer 900 sqft to be completed, Plumbing- 2 Flats to be completed, Tiling work-230sqm

    Work status as on 09-05-2025, we have completed the following.

    • Sub Structural Works – Column RCC-28cum, Beam & slab & Staircase (2nd flight) RCC-174 cum, Staircase (1st flight & landing) RCC – 4cum, Shear wall RCC -4 cum, Sump tank cover slab- 39cum
    • BLOCK WORK – 8″Block work-63.03 cum,4″Block work- 215.11 sqm,
    • PLASTERING WORKS – Wall Plastering; 517 Sqm Ceiling plastering: 664.94 sqm completed
    • Electrical works – Electrical Rope pulling 6th,7th floor completed,Electrical work – wall chasing & box fixing-1 flat completed
    • Waterproofing Works – Waterproofing work- 700 sq ft, Waterproofing work – Apartments- 154 sqm, Core cutting-1 flat
    • Internal Finishes – Painting -primer -2A-450 sqft

    As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2025.

    • Sub Structural Works – Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-8cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed ,Parapet wall-16 cum,
    • BLOCK WORK – 8″ Block Work: 120m3 ,4″ Block Work- 450 sqm to be completed
    • PLASTERING WORKS – Wall Plastering-600 sqm, Ceiling plastering- 800 sqm to be completed
    • Electrical works – Electrical Rope pulling -2 floors to be completed, Wall chasing & box fixing- 7 apartments to be completed,
    • Waterproofing Works – Waterproofing work- Retaining Wall- 420 sqft to be completed, Core cutting- 5 flats to be completed, Waterproofing work – Apartments- 141.4 sqm to be completed, Door Frame fixing – 14 apartments to be completed
    • Internal Finishes – Painting -primer 900 sqft to be completed, Plumbing- 2 Flats to be completed

    Work status as on 10-04-2025, we have completed the following.

    • Sub Structural Works – Column RCC-28cum, Beam & slab & Staircase (2nd flight) RCC-174 cum, Staircase (1st flight & landing) RCC – 4cum, Shear wall RCC -4 cum, Sump tank cover slab- 28 cum, Earth work excavation- 45 cum
    • BLOCK WORK – 8″Block work-63.03 cum,4″Block work- 215.11 sqm,
    • PLASTERING WORKS – Wall Plastering; 219.48 Sqm Ceiling plastering: 664.94 sqm completed
    • Electrical works – Electrical Rope pulling 6th,7th floor completed,Electrical work – wall chasing & box fixing-1 flat completed
    • Waterproofing work- 1211 sqft, Waterproofing work – Apartments- 154 sqm, Core cutting-1 flat

    As per the current work status from our site, we are targeted to complete the following works by the end of APRIL 2025.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-110 cum, Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-8cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed ,Parapet wall-16 cum,
    • BLOCK WORK – 8″ Block Work: 132m3 ,4″ Block Work- 416 to be completed
    • PLASTERING WORKS – Wall Plastering-600 sqm, Ceiling plastering- 900 sqm to be completed
    • Electrical Rope pulling -2 floors to be completed, Wall chasing & box fixing- 7 apartments to be completed,
    • Waterproofing work- Retaining Wall- 420 sqft to be completed, Core cutting- 5 flats to be completed, Waterproofing work – Apartments- 141.4 sqm to be completed, Door Frame fixing – 7 apartments to be completed

    Work status as on 10-03-2025, we have completed the following.

    • Sub Structural Works – Earth work excavation for sump tank 110m3 Pile chipping 6 Rm Column RCC 26 cum,Beam & slab & Staircase (2nd flight) RCC 174 cum,Staircase (1st flight & landing) RCC 6cum,Shear wall RCC 7cum,Sump tank base 49cum, Beam & slab & Staircase (2nd flight) RCC-68cum completed,Staircase (1st flight & landing) RCC- 4 cum, Shear wall RCC-7 cum, Sump tank wall- 38.58cum,
    • BLOCK WORK – 8″Block work 76.57cum , 4″Block work 286.34 sqm
    • PLASTERING WORKS – Wall Plastering; 1157sqm completed out of 35000sqm Ceiling plastering: 664.94 sqm completed
    • Electrical works – Electrical Rope pulling 6th,7th floor completed,Electrical work – wall chasing & box fixing-1 flat completed

    As per the current work status from our site, we are targeted to complete the following works by the end of MARCH 2025.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-110 cum, Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-7cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed
    • BLOCK WORK – 8″ Block Work: 70m3 ,4″ Block Work-240 to be completed
    • PLASTERING WORKS – Wall Plastering-600 sqm, Ceiling plastering- 500 sqm to be completed

    Work status as on 13-02-2025, we have completed the following.

    • Sub Structural Works – Earth work excavation for sump tank 110m3 Pile chipping 6 Rm Column RCC 40 cum,Beam & slab & Staircase (2nd flight) RCC 174 cum,Staircase (1st flight & landing) RCC 6cum,Shear wall RCC 7cum,Sump tank base 49cum,
    • BLOCK WORK – 8″Block work 50 cum , 4″Block work 113 sqm
    • PLASTERING WORKS – Wall Plastering; 1157sqm completed out of 35000sqm Ceiling plastering: 331sqm completed
    • Electrical works- Electrical Rope pulling 5th floor completed

    As per the current work status from our site, we are targeted to complete the following works by the end of FEBRUARY 2025.

    • Sub Structural Works – Earth levelling and back filling-300 cum, Earth work excavation for sump tank-110 cum, Pile chipping-8 Rm,Column RCC-60cum,Beam and slab RCC- 242 cum, Staircase RCC- 10 cum,Shear wall RCC-7cum ,Sunshade drop- 35.6 cum, Sump tank base-40 cum to be completed
    • BLOCK WORK- 8″ Block Work: 70m3 ,4″ Block Work-240 to be completed
    • PLASTERING WORKS – Wall Plastering-600 sqm, Ceiling plastering- 500 sqm to be completed

    Luxury Apartments in Pattom, Trivandrum

    Trivandrum city is like no other when it comes to buying a home and setting up roots. Here, you will find that there is no paucity of natural tourism spots, cultural grandeur, premier educational institutes, medical tourism or well-developed infrastructure. And for those looking to buy new flats in Trivandrum, one of the best neighborhoods to invest in is Pattom. As this locality offers well-maintained roads and easily accessible essential services to enhance the livability factor of this area, the demand for flats in Pattom is understandably very high too.

    Some of the best builders have premium apartments for sale in Pattom, including Artech Realtors. And ‘Artech Marvel’ is their ode to luxury contemporary apartment living in the city, where timeless elegance meets modern sophistication in the heart of Pattom. Each apartment is designed with impeccable finishing, a seamless blend of modern and classic elements and ample lighting, thus creating the perfect balance between style and functionality.

    Along with the value-added facilities and lifestyle-enhancing amenities, what you get with Artech Marvel are some of the best luxury apartments in Pattom. What’s more, these apartments come in convenient sizes to suit every family’s space needs. With Artech Marvel featuring thoughtfully-designed 2 and 3 BHK apartments in Pattom that exude architectural excellence and spacious designs, you won’t ever have to worry again about finding premium homes crafted by renowned builders!

    For those looking to buy flats in Trivandrum, Pattom is a prime neighborhood that offers both convenience and comfort. Known for its well-maintained roads, excellent infrastructure, and easy access to essential services, Pattom is a sought-after location for anyone wanting to set roots in the city. Artech Realtors offers some of the best premium apartments for sale in Pattom. These apartments provide a perfect blend of timeless elegance and modern living, with designs that cater to every family’s needs. With spacious 2 and 3 BHK units, Artech Marvel promises an ideal setting for those who seek luxury, functionality, and a prime location when buying a home in Trivandrum.

    For anyone seeking to invest in flats for sale in Trivandrum, Pattom stands as a beacon of convenience and luxury, offering a perfect blend of modern living with a rich heritage that enhances its value.

    Come, discover Artech Marvel, where every apartment sets a new standard in living and an exquisite display of luxury living at its best.

    RELATED PROJECTS









        DISCLAIMER

        The information provided on this website is meant for general guidance. Though we have taken utmost care on the accuracy of the contents, the customer should make an autonomous assessment of the contents. However, the prospective buyers should rely upon the terms and conditions of the sale and construction agreement between the Builder and the Client.

        The visuals of the projects symbolize artistic impression only. The information contained herein including the fittings, finishes, features, floor size and color etc. in the visuals are subject to change. However, the plans & specifications indicated in the Builder and Client agreements are final and we have not authorized anyone to make any oral commitments or promises on our behalf in regard to the plans and specifications of the apartments/projects.

        For any clarification please feel free to call +91 9847 600 600 or walk into our offices. Our representatives will always be at your service.