ArtechKaazhcha

Ongoing , Residential , Thiruvalla
Thiruvalla

RERA Number: K-RERA/PRJ/056/2020

}

Project Description

Artech Kaazhcha as the name suggests is truly a wonderful sight located in the heart of Thiruvalla. A joint initiative with the renowned director Blessy, it is a 2 & 3 BHK apartment project fitted with world-class elder-friendly amenities that exude luxury and comfort.

QUICK
ENQUIRE

Take your first few steps towards finding the ultimate happiness of the Perfect Home.
  • AV Room
  • Indoor Games Room
  • Air-Conditioned Unisex Gym
  • Swimming pool for Adults and Kids
  • Children’s play area
  • Roof top Party area
  • Guest Suite
  • Consultation room and Doctor’s on call
  • Landscaped balcony with drip irrigation
  • Driver’s Dormitory
  • Elder friendly corner – Yoga + Meditation
  • Multi Purpose Hall
  • Common Area Surveillance
  • Access control & Key less entry (card & biometric) to each flat
  • Lobby Surveillance
  • Vehicle RFID systems & boom barriers
  • IP based video door phone
  • Lift access control
  • Mobile app for online surveillance for working couples
  • Sensor Lighting

Work status as on 08-11-2024, we have completed the following

  • Structural Works – Pile cap – completed, slab – completed, retaining wall – completed, compound wall – completed (110m)
  • Civil Works Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 90% completed, Ground floor – completed, Masonry – Block/ brick – completed (till Terrace floor Completed), Internal plaster -completed (till Terrace floor completed)
  • Internal Finishes – Main door -100% completed Wall tiling 80% completed Flooring 90% completed Passage floor tiling BF to 19th floor -100% completed, Lift cladding – p3 lift completed GF Interlock – 85% completed, Putty works & Painting Putty – 98% completed ,1st to 19th floor -2 coat putty & 2 coat primer completed,Ground Floor -95% 2 coat putty and primer completed ,Painting 1st coat -80% completed (70 flats),Water proofing – 100% completed ,Door frame – 100% completed Stair Handrails -100% completed (firestair handrail completed) Main stair -100% completed, Balcony handrail- 97% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 95% completed (till 19th floor completed CP Sanitary – 12 flats completed,Corecutting – till 19th floor – 96% completed Centralised Gas piping system- 70% completed Firefighting final fixtures – Horizontal pipe line till 19th floor completed, Vertical pipe line work – 98% completed Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed, 13- 30% completed 14-30% completed ,15 -20% completed Switch fixing – 27 flats completed
  • External Finishes – Windows & Sliding doors – 68 %completed, External Plastering – 98% completed External Painting – 95% completed (1st coat) External Infrastructure and MEP services – 30% completed
  • Final Finishes – Door shutters & ironmongery – 50% Completed, Final painting 13% completed, Plumbing and Sanitary wares – 30% completed, Electrical final fixtures – 30% completed, Firefighting final fixtures -55% completed

As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2024.

  • Internal Finishes – Balcony handrail -100% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing work – 100% ,plumbing duct work100% to be completed
  • External Finishes – Windows & Sliding doors – 100% to be completed, External Plastering – 100% to be completed, External Painting – 100% to be completed
  • Final Finishes – Door shutter fixing 70%,Eletrical wire pulling 70% to be completed

Work status as on 14-10-2024, we have completed the following..

  • Civil Works -Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 90% completed, Ground floor – completed, Masonry – Block/ brick – completed (till Terrace floor Completed), Internal plaster -completed (till Terrace floor completed)
  • Internal Finishes – Main door -100% completed Wall tiling 80% completed Flooring 90% completed Passage floor tiling BF to 19th floor -100% completed, Lift cladding – p3 lift completed GF Interlock – 70% completed, Putty works & Painting Putty – 98% completed ,1st to 19th floor -2 coat putty & 2 coat primer completed,Ground Floor -95% 2 coat putty and primer completed ,Painting 1st coat -80% completed (70 flats),Water proofing – 100% completed ,Door frame – 100% completed Stair Handrails -100% completed (firestair handrail completed) Main stair -100% completed, Balcony handrail- 97% completed
  • Electrical, Plumbing & Firefighting works- Concealed plumbing works – 95% completed (till 19th floor completed CP Sanitary – 10 flats completed,Corecutting – till 19th floor – 95% completed Centralised Gas piping system- 70% completed Firefighting final fixtures – Horizontal pipe line till GF -19th floor completed, Vertical pipe line work – 98% completed Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed, 13 30% completed 14 ,15 -in progress Switch fixing – 27 flats completed
  • External Finishes- Windows & Sliding doors – 65 %completed,External Plastering – 98% completed External Painting – 95% completed External Infrastructure and MEP services – 25% completed
  • Final Finishes -Door shutters & ironmongery – 50% Completed, Final painting 13% completed, Plumbing and Sanitary wares – 30% completed, Electrical final fixtures – 30% completed, Firefighting final fixtures -55% completed

As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2024.

  • Internal Finishes- Balcony handrail -100% to be completed
  • Electrical, Plumbing & Firefighting works- Concealed plumbing work – 100% ,plumbing duct work100% to be completed
  • External Finishes- Windows & Sliding doors – 100% to be completed, External Plastering – 100% to be completed, External Painting – 100% to be completed
  • Final Finishes – Door shutter fixing 70%,Eletrical wire pulling 70% to be completed

Work status as on 12-09-2024, we have completed the following.

  • Structural Works -Pile cap – completed, slab – completed, retaining wall – completed, compound wall – completed (110m)
  • Civil Works -Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 90% completed, Ground floor – completed, Masonry – Block/ brick – completed (till Terrace floor Completed), Internal plaster -completed (till Terrace floor completed)
  • Internal Finishes – Main door -100% completed Wall tiling 80% completed Flooring 90% completed Passage floor tiling BF to 19th floor -100% completed, Lift cladding – p3 lift completed GF Interlock – 70% completed, Putty works & Painting Putty – 95% completed ,1st to 19th floor -2 coat putty & 2 coat primer completed,Ground Floor -95% 2 coat putty and primer completed ,Painting 1st coat -80% completed (70 flats),Water proofing – 80% completed ,Door frame – 100% completed Stair Handrails -100% completed (firestair handrail completed) Main stair -100% completed, Balcony handrail- 80% completed (3rd – 12th floor – completed)
  • Electrical, Plumbing & Firefighting works- Concealed plumbing works – 95% completed (till 19th floor completed CP Sanitary – 10 flats completed,Corecutting – till 19th floor – 95% completed,Centralised Gas piping system- 70% completed Firefighting final fixtures – Horizontal pipe line till GF -19th floor completed, Vertical pipe line work – 98% completed Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed, 13 30% completed 14 ,15 -in progress Switch fixing – 27 flats completed
  • External Finishes- Windows & Sliding doors – 65 %completed,External Plastering – 96% completed External Painting – 95% completed
  • Mockup – Completed

As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2024.

  • Internal Finishes- Balcony handrail – 13th floor – 19th floor- 100% to be completed
  • Electrical, Plumbing & Firefighting works- CP Sanitary – 15 more flats to be completed, Electrical wire pulling – 10 flats to be completed, switch fixing – 10 more flats to be completed
  • External Finishes- Windows & Sliding doors – 100% to be completed, External Plastering – 100% to be completed, External Painting – 100% to be completed

Work status as on 11-06-2024, we have completed the following.

  • Internal Finishes – Main door – completed, Wall tiling – 3rd to 14th floor (toilets) – 90% completed, 15th,18th floor – 40% completed, 17th floor – 60% completed, Flooring – 3rd,4th ,5th , 6th , 7th floor completed, 2nd floor – 80% completed, 1st floor – 60%, 8th to 18th floor – 80% completed, passage floor tiling – BF to 19th floor – 100% completed, lift cladding – p3 lift completed, GF Interlock – 20% completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, painting 1st coat – 70% completed (70 flats), Water proofing – 3rd to 19th floor 98% completed, OHT- 80% completed, open terrace – 70% completed, Sump tank – 40% completed, GF – 50% Completed, Door frame fixtures – completed, Handrails – 60% completed (firestair handrail completed, Main stair – completed, balcony handrail – 60% completed (2nd – 12th floor – 90% completed)
  • Electrical, Plumbing & Firefighting works- Concealed plumbing works – 90% completed (till 19th floor completed, CP Sanitary – 4 flats completed, Corecutting – till 19th floor – 95% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till GF -19th floor completed, vertical pipe line work – 98% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed, switch fixing – 27 flats completed
  • External Finishes- Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th,6th,7th floor – 75% completed, 8th, to 19th – 60% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, B,C,D,E -one coat paint completed, plumbing duct line completed

As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2024.

  • Internal Finishes- Water proofing – open terrace – 90% to be completed, GF – 90% to be completed, Handrail – 1st to 12th Floor – 90% to be completed, balcony handrail – 12th floor – 19th floor- 90% to be completed
  • Electrical, Plumbing & Firefighting works- CP Sanitary – 10 flats to be completed, Electrical wire pulling – 10 flats to be completed, switch fixing – 10 more flats to be completed
  • External Finishes- Windows & Sliding doors – 8th to 19th floor – 80% to be completed

Work status as on 09-05-2024, we have completed the following.

  • Internal Finishes – Main door – completed, Wall tiling – 3rd to 14th floor (toilets) – 90% completed, 15th,18th floor – 40% completed, 17th floor – 60% completed, Flooring – 3rd,4th ,5th , 6th , 7th floor completed, 2nd floor – 80% completed, 1st floor – 40%, 8th to 15th floor – 80% completed, 16th – 60%, 17th floor – 40%, 18th floor – 20% completed, passage floor tiling – BF to 19th floor – 100% completed, lift cladding – p3 lift completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, painting 1st coat – 65% completed (50 flats), Water proofing – 3rd to 19th floor 98% completed, OHT- 80% completed, open terrace – 60% completed, Sump tank – 40% completed, GF – 30% COMPLETED, Door frame fixtures – completed, Handrails – 60% completed (firestair handrail completed, Main stair – completed, balcony handrail – 60% completed)
  • Electrical, Plumbing & Firefighting works- Concealed plumbing works – 90% completed (till 15th floor completed, 16th, 17th,18th, 19th floor – 90% completed), Corecutting – till 19th floor – 95% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till GF -19th floor completed, vertical pipe line work – 98% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed, switch fixing – 17 flats completed
  • External Finishes- Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th,6th,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, B,C,D,E -one coat paint completed, plumbing duct line completed
  • Mockup-Completed.

As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2024.

    • Internal Finishes- Flooring – 8th to 15th 100% 100% to be completed, Handrail – 1st to 12th Floor – 90% to be completed
    • Electrical, Plumbing & Firefighting works-Concealed plumbing works – till 19th floor 100% to be completed, CP Sanitary – 5 flats to be completed, Electrical wire pulling – 10 flats to be completed, switch fixing – 10 more flats to be completed.
    • External Finishes- Windows & Sliding doors – 11th to 18th floor – 70% to be completed

Work status as on 12-04-2024, we have completed the following.

      • Internal Finishes Main door – completed, Wall tiling – 3rd to 12th floor (toilets) – 90% completed, 13th floor – 60% completed, 14th,15th,18th floor – 40% completed, 17th floor – 60% completed, Flooring – 3rd,4th ,5th floor completed, 2nd floor – 80% completed, 6th floor – 95% , 7th – 12th floor – 80% completed, 15th floor- 40%, 13th floor – 80% completed, 14th – 60%, 16th – 60%, 17th floor – 40%, 18th floor – 20% completed, passage floor tiling – 1st to 14th floor – 100% completed, lift cladding – p3 lift completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, painting 1st coat – 30% completed (25 flats), Water proofing – 3rd to 19th floor 98% completed, OHT- 80% completed, open terrace – 60% completed, Sump tank – 30% completed, Door frame fixtures – completed, Handrails – 60% completed (firestair handrail completed, Main stair – completed, balcony handrail – 60% completed)
      • Electrical, Plumbing & Firefighting works Concealed plumbing works – 90% completed (till 15th floor completed, 16th, 17th,18th, 19th floor – 90% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till GF -19th floor completed, vertical pipe line work – 98% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed, switch fixing – 12 flats completed
      • External Finishes Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th,6th,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, B,C,D,E -one coat paint completed, plumbing duct line – 2nd to 14th floor – 90% completed

As per the current work status from our site, we are targeted to complete the following works by the end of APRIL 2024.

      • Internal Finishes wall tiling up to 14th floor 90% to be completed, Flooring – up to 17th floor 100% to be completed, passage floor tiling – 15th,16th, 17th,18th, GF floor 100% to be completed, Handrail – 80% to be completed
      • Electrical, Plumbing & Firefighting works Concealed plumbing works – till 19th floor 100% to be completed, CP Sanitary – 5 flats to be completed, Electrical wire pulling – 10 flats to be completed, switch fixing – 10 more flats to be completed
      • External Finishes Windows & Sliding doors – 11th to 18th floor – 70% to be completed, plumbing duct line – up to 19th floor 100% to be completed

Work status as on 12-03-2024, we have completed the following.

      • Internal Finishes – Main door – 84 nos: out of 92 nos:completed, Wall tiling – 3rd to 12th floor (toilets) – 90% completed, 13th floor – 40% completed, 14th,15th,18th floor – 40% completed, 17th floor – 60% completed, Flooring – 3rd floor completed, 2nd floor – 70% completed, 4th – 12th floor – 80% completed,15th floor- 40%, 13th floor – 80% completed, 14th – 40%,16th – 60%, 17th floor – 30%,18th floor – 20% completed, passage floor tiling – 1st to 12th floor – 95% completed, lift cladding – p3 lift completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, Water proofing – 3rd to 19th floor 98% completed, OHT- 80%completed, open terrace – 40% completed, Door frame fixtures – completed, Handrails – 60% completed (firestair handrail completed, Main stair – completed, balcony handrail – 60% completed).
      • Electrical, Plumbing & Firefighting works Concealed plumbing works – 95% completed (till 15th floor completed, 16th, 17th,18th, 19th floor – 90% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till GF -19th floor completed, vertical pipe line work – 98% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed
      • External Finishes Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, B,C,D,E -one coat paint completed, plumbing duct line – 2nd to 14th floor – 90% completed

As per the current work status from our site, we are targeted to complete the following works by the end of MARCH 2024.

      • Internal Finishes Main door – 100% to be completed, wall tiling up to 14th floor 90% to be completed, Flooring – up to 15th floor 80% to be completed, passage floor tiling – up to 15th floor 95% to be completed, water proofing works – OHT – 100% to be completed, open terrace – 80% to be completed, Handrail – 80% to be completed
      • Electrical, Plumbing & Firefighting works Concealed plumbing works – till 19th floor 100% to be completed, Firefighting final fixtures – 17th – 19th floor 100% to be completed, Electrical wire pulling – up to 15th floor – 90% to be completed
      • External Finishes Windows & Sliding doors – 11th to 18th floor – 70% to be completed, plumbing duct line – up to 19th floor 100% to be completed

Work status as on 10-02-2024, we have completed the following.

      • Structural Works – Pile cap – completed, slab – 95% completed, retaining wall – 70% completed, compound wall – 80% completed (110m), GF, BF floor slab – 70% completed
      • Civil Works Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – completed, Masonry – Block/ brick – completed (till Terrace floor Completed), Internal plaster -completed (till Terrace floor completed)
      • Internal Finishes – Main door – 84 nos: out of 92 nos:completed, Wall tiling – 3rd to 12th floor (toilets) – 90% completed, 13th floor – 40% completed, 14th,15th,18th floor – 20% completed, 17th floor – 40% completed, Flooring – 3rd floor completed, 4th – 12th floor – 80% completed,15th floor- 40%, 13th floor – 40% completed, 14th,16th,18th floor – 20% completed, passage floor tiling – 1st to 12th floor – 95% completed, lift cladding – p3 lift completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, Water proofing – 3rd to 19th floor 98% completed, OHT- 80%completed, open terrace – 40% completed, Door frame fixtures – completed, Handrails – 60% completed (firestair handrail completed, Main stair – completed, balcony handrail – 60% completed)
      • Electrical, Plumbing & Firefighting works Concealed plumbing works – 95% completed (till 15th floor completed, 16th, 17th,18th, 19th floor – 90% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till GF -19th floor completed, vertical pipe line work – 90% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, B,C,D,E -one coat paint completed, plumbing duct line – 2nd to 14th floor – 90% completed
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of FEBRUARY 2024.

      • Structural Works – Ground floor slab – 80% to be completed, Raft slab – 80% to be completed, BF column 1 more No: to be completed
      • Internal Finishes – Main door – 100% to be completed, wall tiling up to 14th floor 90% to be completed, Flooring – up to 15th floor 80% to be completed, passage floor tiling – up to 15th floor 95% to be completed, water proofing works – OHT – 100% to be completed, open terrace – 80% to be completed, Handrail – 80% to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 19th floor 100% to be completed, Firefighting final fixtures – 17th – 19th floor 100% to be completed, Electrical wire pulling – up to 15th floor – 90% to be completed
      • External Finishes – Windows & Sliding doors – 11th to 18th floor – 70% to be completed, plumbing duct line – up to 19th floor 100% to be completed

Work status as on 13-01-2024, we have completed the following.

      • Structural Works – Pile cap – completed, slab – 95% completed, retaining wall – 70% completed, compound wall – 80% completed (110m), GF, BF floor slab – 70% completed
      • Civil Works Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – completed, Masonry – Block/ brick – completed (till Terrace floor Completed), Internal plaster -completed (till Terrace floor completed)
      • Internal Finishes – Main door – 84 nos: out of 92 nos:completed, Wall tiling – 3rd to 11th floor (toilets) – 90% completed, 13th floor – 40% completed, 14th,15th,18th floor – 20% completed, 17th floor – 40% completed, Flooring – 3rd floor completed, 4th – 11th floor – 80% completed,15th floor- 40%, 13th floor – 40% completed, 14th,16th,18th floor – 20% completed, passage floor tiling – 1st to 6th floor – 95% completed, lift cladding – p3 lift completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, Water proofing – 3rd to 19th floor 95% completed, OHT- 80%completed, open terrace – 30% completed, Door frame fixtures – completed, Handrails – 60% completed (firestair handrail completed, Main stair – completed, balcony handrail – 60% completed)
      • Electrical, Plumbing & Firefighting works Concealed plumbing works – 95% completed (till 15th floor completed, 16th, 17th,18th, 19th floor – 90% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till GF -19th floor 90% completed, vertical pipe line work – 90% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 11th floor – 90% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, B,C,D,E -one coat paint completed, plumbing duct line – 2nd to 14th floor – 90% completed
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JANUARY 2024.

      • Structural Works – Ground floor slab – 80% to be completed, Raft slab – 80% to be completed, BF column 1 more No: to be completed
      • Internal Finishes – Main door – 100% to be completed, wall tiling up to 14th floor 90% to be completed, Flooring – up to 15th floor 80% to be completed, passage floor tiling – up to 15th floor 95% to be completed, water proofing works – OHT – 100% to be completed, open terrace – 80% to be completed, Handrail – 80% to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 19th floor 100% to be completed, Firefighting final fixtures – 17th – 19th floor 100% to be completed, Electrical wire pulling – up to 15th floor – 90% to be completed
      • External Finishes – Windows & Sliding doors – 11th to 18th floor – 70% to be completed, plumbing duct line – up to 19th floor 100% to be completed

Work status as on 08-12-2023, we have completed the following.

      • Structural Works Pile cap – completed, slab – 95% completed, retaining wall – 45% completed, compound wall – 60% completed (42m), GF, BF floor slab – 50% completed
      • Civil Works Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – completed, Masonry – Block/ brick – completed (till Terrace floor Completed), Internal plaster -completed (till Terrace floor completed)
      • Internal Finishes – Main door – 84 nos: out of 92 nos:completed, Wall tiling – 3rd to 10th floor (toilets) – 90% completed, 13th floor – 20% completed, 14th,15th,18th floor – 20% completed, Flooring – 3rd floor completed, 4th floor – 80%, 5th floor – 80%, 6th floor – 80%, 7th floor – 80%, 8th floor – 80%, 9th floor – 80% completed, 10th floor – 80%, 11th floor – 80% completed 15th floor- 40%, 13th,14th,16th,18th floor – 20% completed, passage floor tiling – 2nd floor – 95% completed putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, Water proofing – 3rd to 16th floor 98% completed, 17 to 19th floor – 70% completed, terrace water tank completed, Door frame fixtures – completed, Handrails – 20% completed (firestair handrail completed, Main stair – completed, balcony handrail – frameonly – 70% completed)
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 95% completed (till 15th floor completed, 16th, 17th,18th, 19th floor – 90% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till 19th floor completed, vertical pipe line work – 90% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 9th floor – 90% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, plumbing duct line – 2nd to 14th floor – 60% completed
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2023.

      • Structural Works – Ground floor slab – 50% more to be completed, Raft slab – 80% to be completed, BF column 12 Nos: to be completed
      • Internal Finishes – Main door – 100% to be completed, wall tiling 11th,12th, 13th floor to be completed, Flooring – 12th,13th,14th floor to be completed,passage floor tiling – 1st,3rd,4th,5th floor 95% to be completed, water proofing works – balcony and toilets – 3rd to 19th floors 95% to be completed,
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 19th floor 100% to be completed, Firefighting final fixtures – 17th – 19th floor 100% to be completed, Electrical wire pulling – 10th,11th,12th floor – 100% to be completed
      • External Finishes – Windows & Sliding doors – 11th to 18th floor – 70% to be completed, plumbing duct line – 2nd to 14th floor 90% to be completed

Work status as on 10-11-2023, we have completed the following.

      • Structural Works – Pile cap – completed, slab – 95% completed, retaining wall – 45% completed, compound wall – 60% completed (42m)
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – completed, Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster -Ground floor – completed, 98% completed (till 19th floor completed)
      • Internal Finishes – Main door – 84 nos: out of 92 nos:completed, Wall tiling – 3rd to 10th floor (toilets) – 90% completed, 13th floor – 20% completed, 14th,15th,18th floor – 20% completed, Flooring – 3rd floor completed, 4th floor – 80%, 5th floor – 80%, 6th floor – 80%, 7th floor – 80%, 8th floor – 80%, 9th floor – 80% completed, 10th floor – 70%, 15th floor- 40%, 13th,14th,16th,18th floor – 20% completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 70% one coat putty and primer completed, Water proofing – 3rd to 13th floor 98% completed, 14 to 17th floor – 70% completed, terrace water tank 98% completed, Door frame fixtures – completed, Handrails – 20% completed (firestair handrail completed, Main stair – 95% completed, balcony handrail – frameonly – 70% completed)
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 90% completed (till 15th floor completed, 16th, 17th,18th floor – 40% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 40% completed, Firefighting final fixtures – horizontal pipe line till 16th floor completed, 17th floor – 60% completed, vertical pipe line work – 90% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 9th floor – 70% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D outside area – 2 coat damp proof, 2 coat putty, one coat primer completed , E, A – 2 coat damp proof completed, 2 coat putty, one coat primer work – 80% completed, plumbing duct line – 2nd to 14th floor – 60% completed
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2023.

      • Inside plastering – 19th floor 100% to be completed
      • Internal Finishes – Main door – 100% to be completed, wall tiling -up to 10th floor 100% to be completed, 11th ,12th – 80% to be completed, Flooring – 4th to 10th floor 100% to be completed, 11th ,12th – 50% to be completed, water proofing works – balcony and toilets – 3rd to 19th floors 100% to be completed, Handrails – balcony handrail 40% including glass portion to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 19th floor 100% to be completed, Gas piping system- 50% to be completed, Firefighting final fixtures – 17th – 19th floor 100% to be completed, Electrical wire pulling – 4th to 9th floor – 100% to be completed
      • External Finishes – Windows & Sliding doors – 11th to 18th floor – 50% to be completed, External Plastering – 100% to be completed, External painting – E,A – 2 coat putty and one coat primer 100% to be completed, plumbing duct line – 2nd to 14th floor 90% to be completed

Work status as on 10-10-2023, we have completed the following.

      • Structural Works – Pile cap – completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall completed, ramp completed, retaining wall – 45% completed, compound wall – 60% completed (42m), LMR Base slab, roof completed, main and fire stair head room completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – completed, Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster -Ground floor – completed, 98% completed (till 19th floor completed)
      • Internal Finishes – Main door -1st to 3rd floor completed, Wall tiling – 3rd to 8th floor (toilets) – 90% completed, 9th floor – 80% completed, 13th floor – 20% completed, 14th,15th,18th floor – 20% completed, Flooring – 3rd floor completed, 4th floor – 80%, 5th – 80%, 6th – 80%, 7th – 80%, 8th – 50%, 9th floor – 50% completed, 13th,14th,16th,18th floor – 20% completed, putty works & Painting – putty 50% completed 1st to 19th floor 2 coat putty & 2 coat primer 90% completed, Water proofing – 40% completed (till 16th floor bathrooms only, balcony – upto 16th floor 100% completed), Door frame fixtures – completed, Handrails – 20% completed (firestair handrail completed, Main stair – GF to 2nd floor, 1st to 19th floor completed, balcony handrail – frameonly – 70% completed)
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 90% completed (till 15th floor completed,16th, 17th,18th floor – 40% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 10% completed, Firefighting final fixtures – horizontal pipe line till 16th floor completed, vertical pipe line work – 80% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 9th floor – 40% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D outside area – 2 coat damp proof, 2 coat putty, one coat primer completed , E, A – 2 coat damp proof completed, 2 coat putty, one coat primer work – 50% completed, plumbing duct line – 40% completed
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2023.

      • Civil Works – Inside plastering – 19th floor 100% to be completed
      • Internal Finishes – Main door – 100% to be completed, wall tiling -up to 10th floor 80% to be completed, Flooring – 4th to 10th floor 100% to be completed, Water proofing – 11th,12th – 50% to be completed, water proofing works – balcony and toilets – till 19th floors 100% to be completed, Handrails – balcony handrail 40% including glass portion to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 19th floor 100% to be completed, Gas piping system- 50% to be completed, Firefighting final fixtures – 100% to be completed, Electrical wire pulling – 4th to 9th floor – 100% to be completed
      • External Finishes – Windows & Sliding doors – 11th to 18th floor – 50% to be completed, External Plastering – 100% to be completed, External painting – E,A – 2 coat putty and one coat primer 100% to be completed, plumbing duct line – 80% to be completed

Work status as on 13-09-2023, we have completed the following.

      • Structural Works – Pile cap – completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall completed, ramp completed, retaining wall – 40% completed, compound wall – 60% completed (42m), LMR Base slab, roof completed, main and fire stair head room completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – 70% completed, Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster – 1st floor – completed, 94% completed (till 18th floor completed)
      • Internal Finishes – Main door -sample flat only, Wall tiling – 3rd to 8th floor (toilets) – 90% completed, Flooring – 3rd floor completed, 4th, 5th, 6th, 7th, 8th, 9th floor (45% completed), putty works & Painting – putty 50% completed (till 11th floor 2 coat putty – completed, 10th to 16th floor one coat putty 90% completed, 17th floor – 90% completed, 18th floor – 80% completed, 1st Floor – 15% completed (2 coat primer, 2 coat putty), primer up to 18th floor completed, primer after two coat putty till 9th floor completed, Water proofing – 39% completed (till 12th floor bathrooms only, balcony – upto 12th floor 100% completed), Door frame fixtures – completed, Handrails – 20% completed (firestair handrail completed, Main stair – GF to 2nd floor, 17th to 19th floor completed, balcony handrail – frameonly – 70% completed)
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 90% completed (till 15th floor completed,16th, 17th,18th floor – 40% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- mock up only, Firefighting final fixtures – horizontal pipe line till 16th floor completed, vertical pipe line work – 60% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 9th floor – 40% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D outside area – 2 coat damp proof, 2 coat putty, one coat primer completed , E, A – 2 coat damp proof completed), plumbing duct line – 3rd to 9th floor floor completed
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2023.

      • Civil Works – Block work – Ground floor to be completed, Inside plastering – 19th floor 100% to be completed, GF to be completed
      • Internal Finishes – Main door – 50% to be completed, wall tiling – 3rd to 13th floor 100% to be completed, Flooring – 4th to 10th floor 100% to be completed, Water proofing – 11th,12th – 50% to be completed, putty and painting – 10th to 16 th floor 2nd coat putty – 80% to be completed, primer after two coat putty till 14th floor to be completed, water proofing works – balcony and toilets – till 18th floors 100% to be completed, Handrails – Main stair 100% to be completed, balcony handrail 40% including glass portion to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 19th floor 100% to be completed, Firefighting final fixtures – 100% to be completed, Electrical wire pulling – 4th to 9th floor – 100% to be completed
      • External Finishes – Windows & Sliding doors – 11th to 18th floor – 50% to be completed, External Plastering – 100% to be completed, External painting – E,A – 2 coat putty and one coat primer to be completed, plumbing duct line – till 19th floor to be completed

Work status as on 12-08-2023, we have completed the following.

      • Structural Works – Pile cap – 82% completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall completed, ramp completed, retaining wall – 40% completed, compound wall – 60% completed (42m), LMR Base slab completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – 70% completed, Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster – 1st floor – completed, 94% completed (till 18th floor completed)
      • Internal Finishes – Main door -sample flat only, Wall tiling – 3rd to 8th floor (toilets) – 60% completed, Flooring – 3rd floor (A,B,C,D,E – 82% completed), 4th, 5th, 6th, 7th, 8th, 9th floor (25% completed), putty works & Painting – putty 50% completed (till 9th floor 2 coat putty – completed, 10th to 16th floor one coat putty 90% completed, 17th floor – 90% completed, 18th floor – 80% completed, 1st Floor – 15% completed (2 coat primer, 2 coat putty), primer up to 18th floor completed, Water proofing – 39% completed (till 12th floor bathrooms only, balcony – upto 12th floor 100% completed), Door frame fixtures -completed, Handrails – 20% completed (firestair handrail GF to 14th floor completed, Main stair – GF to 2nd floor, 17th to 19th floor completed, balcony handrail – frameonly – 70% completed)
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 90% completed (till 12th floor, 13th floor – 60% completed , 14th,15th,16th floor – 20% completed, Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- mock up only, Firefighting final fixtures – horizontal pipe line till 16th floor completed, vertical pipe line work – 50% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 9th floor – 20% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – primer – 60% completed, damp proof – 70% completed, one putty – 30% completed, 2nd coat – 15% completed)
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of AUGUST 2023.

      • Structural Works – LMR roof to be completed, main and fire stair head room to be completed
      • Civil Works – Block work – Ground floor to be completed, Inside plastering – 19th floor 100% to be completed, GF to be completed
      • Internal Finishes – Main door – 50% to be completed, wall tiling – 3rd to 13th floor 100% to be completed, Flooring – 3rd to 10th floor 100% to be completed, Water proofing – 11th,12th – 50% to be completed, putty and painting – 10th to 18 th floor 2nd coat putty – 80% to be completed, water proofing works – balcony and toilets – till 18th floors 100% to be completed, Haindrails – Main stair and Fire stair 100% to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 17th floor – 100% to be completed, Firefighting final fixtures – 100% to be completed, Electrical wire pulling – 4th to 9th floor – 50% to be completed
      • External Finishes – External Plastering – 100% to be completed, External painting – Damp proof – 90% to be completed, one putty – 50% to be completed, 2nd coat – 50% to be completed, plumbing duct line – 50% to be completed

Work status as on 12-07-2023, we have completed the following.

      • Structural Works – Pile cap – 82% completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall – 60% completed, ramp completed, retaining wall – 30% completed, compound wall – 40% completed (42m), LMR – 30% Completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – 50% completed, Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster – 1st floor – 96% completed, 94% completed (till 18th floor completed)
      • Internal Finishes – Main door -sample flat only, Wall tiling – 3rd to 8th floor (toilets) – 15% completed, Flooring – 3rd floor (A,B,C,D,E – 82% completed), 4th, 5th, 6th, 7th, 8th, 9th floor (25% completed), putty works & Painting – putty 50% completed (till 9th floor 2 coat putty – completed, 10th to 16th floor one coat putty 90% completed, 17th floor – 90% completed, 18th floor – 80% completed, 1st Floor – 15% completed (2 coat primer, 2 coat putty), 3rd,4th,5th floor 2nd coat putty completed, primer up to 18th floor completed, Water proofing – 39% completed (till 12th floor bathrooms only, balcony – upto 10th floor 75% completed), Door frame fixtures – 97% completed (18th floor – completed), Handrails – 20% completed (firestair handrail GF to 14th floor completed, balcony handrail – frameonly – 70% completed)
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 58% completed (till 12th floor, 13th floor – 25% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- mock up only, Firefighting final fixtures – horizontal pipe line till 16th floor completed, vertical pipe line work – 20% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – primer – 60% completed, damp proof – 50% completed)
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JULY 2023.

      • Structural Works – Amenities : Swimming pool wall – 80% to be completed, childrens play area, SHR, LMR to be completed
      • Civil Works – Block work – Ground floor to be completed, Inside plastering – 1st floor – 100% to be completed, 19th floor 100% to be completed
      • Internal Finishes – Water proofing – 11th,12th – 50% to be completed

Work status as on 06-06-2023, we have completed the following.

      • Structural Works – Pile cap – 82% completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall – 60% completed, ramp completed, retaining wall – 25% completed, compound wall – 40% completed (42m), LMR – 30% Completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 70% completed, Ground floor – 25% completed, Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster – 1st floor – 96% completed, 94% completed (till 18th floor completed)
      • Internal Finishes – Main door -sample flat only, Wall tiling – 3rd to 7th floor (toilets) – 15% completed, Flooring – 3rd floor (A,B,C,D,E – 82% completed), 4th, 5th, 6th, 7th, 8th, 9th floor (23% completed), putty works & Painting – putty 50% completed (till 9th floor 2 coat putty – completed, 10th to 16th floor one coat putty 90% completed, 17th floor – 80% completed, 18th floor – 50% completed, 1st Floor – 15% completed (2 coat primer, 2 coat putty), 3rd,4th,5th floor 2nd coat putty completed, primer up to 18th floor completed, Water proofing – 39% completed (till 12th floor bathrooms only, balcony – upto 10th floor 75% completed), Door frame fixtures – 97% completed (18th floor – completed), Handrails – 20% completed (firestair handrail GF to 14th floor completed, balcony handrail – frameonly – 70% completed))
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 58% completed (till 11th floor), Corecutting – till 18th floor completed, 19th floor – 50% completed, Centralised Gas piping system- mock up only, Firefighting final fixtures – horizontal pipe line till 16th floor completed, vertical pipe line work – 15% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 75% completed, 4th floor – 75% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – primer – 60% completed, damp proof – 50% completed)
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2023.

      • Structural Works – Amenities : Swimming pool wall – 80% to be completed, childrens play area, SHR, LMR to be completed
      • Civil Works – Block work – Ground floor to be completed, Inside plastering – 1st floor – 100% to be completed, 19th floor 100% to be completed
      • Internal Finishes – Water proofing – 11th,12th – 50% to be completed

Work status as on 05-05-2023, we have completed the following.

      • Structural Works – Pile cap – 82% completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall – 60% completed, ramp completed, retaining wall – 25% completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster – 1st floor – 95% completed, 94% completed (till 18th floor completed)
      • Internal Finishes – Main door -sample flat only, Wall tiling – 3rd to 7th floor (toilets) – 15% completed, Flooring – 3rd floor (A,B,C,D,E – 80% completed), 4th, 5th, 6th, 7th, 8th, 9th floor (20% completed), putty works & Painting – putty 50% completed (till 9th floor 2 coat putty – completed, 10th to 16th floor one coat putty 90% completed, 17th floor – 80% completed, 18th floor – 50% completed, 1st Floor – 15% completed (2 coat primer, 2 coat putty), primer up to 18th floor completed, Water proofing – 37% completed (till 12th floor bathrooms only, balcony – upto 8th floor 75% completed), Door frame fixtures – 95% completed (18th floor – completed), Handrails – 20% completed (firestair handrail GF to 14th floor completed, balcony handrail – frameonly – 70% completed))
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 56% completed (till 10th floor), Corecutting – till 18th floor completed, Centralised Gas piping system- mock up only, Firefighting final fixtures – horizontal pipe line till 15th floor completed, fire alarm work started
      • External Finishes – Windows & Sliding doors – 3rd floor – 75% completed, 4th floor – 75% completed, 5th floor,6th floor,7th floor – 50% completed, 8th, 9th, 10th – 20% completed External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – primer – 60% completed, damp proof – 50% completed)
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2023.

      • Structural Works – Amenities : Swimming pool wall – 80% to be completed, childrens play area, SHR, LMR to be completed
      • Civil Works – Block work – 19th floor 100% to be completed, Inside plastering – 1st floor – 100% to be completed, 19th floor to be completed
      • Internal Finishes – Wall tiling – 8th, 9th floor 50% to be completed, Waterproofing – balcony 9th, 10th – 80% to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing work – 60% to be completed
      • External Finishes – Windows & Sliding doors – up to 10th floor 80% to be completed

Work status as on 08-04-2023, we have completed the following.

      • Structural Works – Pile cap – 82% completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall – 60% completed, ramp completed, retaining wall – 25% completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster – 1st floor – 90% completed, 94% completed (till 18th floor completed)
      • Internal Finishes – Main door -sample flat only, Wall tiling – 3rd to 7th floor (toilets) – 14% completed, Flooring – 3rd floor (A,B,C,D,E – 80% completed), 4th, 5th, 6th, 7th, 8th, 9th floor (18% completed), putty works & Painting – putty 50% completed (till 9th floor 2 coat putty – completed, 10th to 16th floor one coat putty 90% completed, 17th floor – 80% completed, 18th floor – 50% completed, 1st Floor – 15% completed (2 coat primer, 2 coat putty), primer up to 18th floor completed, Water proofing – 37% completed (till 12th floor bathrooms only, balcony – upto 8th floor 75% completed), Door frame fixtures – 95% completed (18th floor – 80% completed), Handrails – 20% completed (firestair handrail GF to 14th floor completed, balcony handrail – frameonly – 70% completed))
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 56% completed (till 10th floor), Corecutting – till 16th floor completed, Centralised Gas piping system- mock up only, Firefighting final fixtures – horizontal pipe line till 15th floor completed, fire alarm work started
      • External Finishes – Windows & Sliding doors – 3rd floor – 75% completed, 4th floor – 75% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – primer – 60% completed, damp proof – 50% completed)
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of APRIL 2023.

      • Structural Works – Amenities : Swimming pool wall – 80% to be completed, childrens play area, SHR, LMR to be completed
      • Civil Works – Block work – 19th floor 100% to be completed, Inside plastering – 1st floor – 100% to be completed, 19th floor to be completed
      • Internal Finishes – Wall tiling – 8th, 9th floor 50% to be completed, Waterproofing – balcony 9th, 10th – 80% to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing work – 60% to be completed
      • External Finishes – Windows & Sliding doors – up to 7th floor 80% to be completed

Click here to see the previous work progress updates.

Structure
  • Deep pile foundation complying with seismic 3 zone
  • RCC frame structure with brickwork and or concrete block partitions.
  • Concrete grade and Steel grade as per structural consultant’s advice.
Flooring, Tiling & Railings
  • Main entrance lobby, Lift lobby and Lift fascia (wall & floor) using composite
    marble / gSTRUCTURE

    • Column footing complying with seismic 3 zone.
    • RCC frame structure with concrete block and brickwork partitions. Concrete grade and Steel grade as per structural consultant’s advice.

    FLOORING, TILING & RAILINGS

    • Main entrance lobby, Lift lobby and Lift fascia (wall & floor) using composite marble / granite / vitrified tiles, as per the architect’s design.
    • Staircases using granite / vitrified tile flooring with hand railing using SS / MS / GI with or without toughened glass as per architect’s design.
    • Car park Area: Grano flooring with grooves or exterior grade paving tiles.
    • Foyer / Living / Dining using 80cm X 80cm Premium Double charged vitrified tiles (Kajaria / Asian/Somany).
    • Kitchen: 60cm X 60cm premium double charged Vitrified tiles for the flooring (Kajaria / Asian / Somany).
    • All Bedrooms 60cm X 60cm Premium Double Charged Vitrified tiles (Kajaria / Asian / Somany).
    • All Bed room Toilets Designer ceramic tile concepts 30cm X 30cm for floor and 60cm X 30cm for walls up to ceiling height of 8′ 0.
    • Servants Toilet : Ceramic tile 30cm X 30cm for floor and 30cm X 45cm for walls upto 7’6″ height.
    • Utility Room : 30cm X 30cm for floor and 30cm X 45cm for (kitchen wall) walls at a height of 2′ above the counter if any.
    • Balconies / Open Terraces / Decks : Rustic / Antiskid / ceramic tiles 30cm X 30cm or (wood finished vitrified tiles) with SS / MS / GI with or without toughened glass as per architect’s design upto 1.2m height.

    SANITARY & PLUMBING

    • Sanitary fittings: will be of KOHLER or ROCA.
    • All Sanitary wares shall be of white colour only.
    • Concealed cisterns (concealed flushing system) will be of GEBER IT from Switzerland or GROHE from Germany. Actuator plates shall be in CP Finish dual flushing system.
    • Faucets: for all the bed room toilets will be single lever concealed diverters CP finish, heavy body metal fittings of ROCA from Spain or GROHE from Germany or KOHLER. Provision for hot water connection shall be provided for overhead shower.
    • Wall mounted single lever faucet make ROCA from Spain or GROHE from Germany or KOHLER will be provided for the wash basins, Kitchen and utility area sink.
    • Plumbing: All water supply lines shall be in ISI marked CPVC pipes. Drainage lines and storm water drain pipes shall be in PVC, Cockroach traps make CHILLI shall be provided as gratings for all necessary locations, Health Faucet ROCA from Spain or GROHE from Germany or KOHLER shall be provided near EWC in all the toilets.
    • Stainless Steel Sink multi bowl with drain board of make N I RALI / FRANKE shall be provided for the kitchen and stainless steel sink without drain board shall be provided for the utility areas.
    • Towel rods, towel ring, soap dish shall be provided inside the toilets.

    DOORS & WINDOWS

    • Window shutters: Prefabricated colour anodised aluminum sliding shutters by (Hindalco). One pane of Insect screen also shall be provided in each window.
    • Door Frames: Main door frame and shutter shall be of seasoned teak wood. Outer and Inner face to be PU coated and finished as per the Architect’s design.
    • Door Shutters: All internal door frames shall be of seasoned hard wood with flush door shutters.
    • All internal and external faces shall be melamine finish or Paint finish as per the Architects design.
    • Hardware: All hardware shall be in C.P Brass, tower bolts, doorstoppers, ball bearing hinges. Locks shall be mortise of DORSET/YALE make from USA/ Union.
    • Entrance door shall have hardware such as, Magic Eye, Safety Chain, Door Stopper and a BIO Metric lock from HAFELE / YALE.

    ELECTRICAL

    • Concealed copper wiring using FINOLEX / V-GUARD / HAVELLS make cables with modular plate switches, centralized cabling system for all electrical and communication requirements. Wiring shall be done for lighting, 6 Amps, 16 Amps and AC points in the Apartment.
    • Switches: All switches shall be LEGRAND or SCHNEIDER.
    • Generator: Power backup will be provided for all common services and selected light and fan point each in living, bedrooms inside apartment and a refrigerator point, plus additional one 6 Amp plug point in the Kitchen, one light point in all the toilets, one 6 Amp plug point at Living for emergency charging of devices shall be provided (Air-conditioning and Geyser points and other 16 Amp points will not be considered for the power back up).
    • Light fixtures for the Common areas, external areas, apartment balconies and at entrance door of the individual apartments shall be provided.
    • All light fixtures shall be of PHILIPS / HAVELLS.
    • Adequate ELCB and MCB shall be provided in each apartments SI EM ENS / HAVELLS.
    • Provision for the GEYSER points and fresh air fans shall be provided for all toilets.
    • Provision for telephone and Internet shall be provided in the living room and master bed room.
    • Provision for Cable TV / DTH shall be provided in the Living and Master Bed room.

    PAINT FINISHES

    • Premium emulsion paint shall be applied for the ceiling and interior walls of the apartments excluding Utility and Services.
    • Internal Walls: Acrylic / cement based Putty with Premium emulsion paint.
    • External Walls: Weather shield exterior grade emulsion / texture paint.

    ELEVATOR/S

    • Elevators: High Speed lift shall be provided as per the Govt. norms in each core with automatic doors & SS brush finish of KONE / SCHINDLER / MITSUBISHI. ARD (Automatic Rescue Device) shall be installed in the passenger lift as a premium feature.

    AIR CONDITIONING

    • Provision for Air-Conditioning in Living, Dining and all bed rooms.

    HOME AUTOMATION

    • Multi level security systems for common areas and lobbies, Access control entry to the common entrance /foyers and gymnasium.
    • Light motion sensors for selected common areas.
    • Home security monitoring, gas leakage detectors, emergency panic intrusion alarm, visitor tracking.

    LANDSCAPING

    • Provision for sprinklers and a drip system shall be provided for necessary common area landscaping. Interlock Pavers to be laid in driveways and walkways. Hard and soft landscaping shall be provided as per the landscape consultant’s design.

    Description / Stage of Construction Collection (%)
    At the time of Agreement 30%
    On Completion of Piling works 5%
    On Completion of Pile cap and Beams 5%
    On Completion of Ground Floor Roof Slab 5%
    On Completion of 2nd Floor Roof Slab 5%
    On Completion of 4th Floor Roof Slab 5%
    On Completion of 6th Floor Roof Slab 5%
    On Completion of 8th Floor Roof Slab 5%
    On Completion of 10th Floor Roof Slab 5%
    On Completion of 12th Floor Roof Slab 5%
    On Completion of 15th Floor Roof Slab 5%
    On Completion of Entire Structure 5%
    On Completion of internal Plastering of respective apartment 5%
    On Completion of external Plastering 5%
    On Completion of Internal painting 2%
    On Completion of flooring of respective apartment 2%
    On Handing Over of apartment 10/0 1%
    Total 100%

    ranite / vitrified tiles, as per the architect’s design.

  • Staircases using granite / vitrified tile flooring with hand railing using matt finished SS / MS with or without toughened glass as per architect’s design.
  • Car Park Area: Grano flooring with grooves or exterior grade paving tiles.
  • Foyer / Living / Dining using 80cm X 80cm Premium Double charged vitrified tiles. [Kajaria / Asian or equivalent).
  • Kitchen: 60cm X 60cm premium double charged Vitrified tiles for the flooring (Kajaria/ Asian or equivalent)
  • Master Bed Room: Laminated wooden flooring AC4 Grade. All other bed rooms 60cmx60cm Premium Double Charged Vitrified tiles.
  • All Bed room Toilets: Designer ceramic tile concepts 30cm X 30cm for floor and 60cm X 30cm for walls up to ceiling height of 8’ 0.
  • Servants Toilet : Ceramic tile 30cm X 30cm for floor and 30cm X 45cm for walls upto 8’0” height.
  • Utility Room: 30cm X 30cm for floor and 30cm X 45cm for (kitchen wall) walls upto 4’6” height and 2’ above the counter if any. (using any premium Indian brands).
  • Balconies / Open Terraces / Decks : Rustic / antiskid / ceramic tiles 30cm X 30cm or (wood finished vitrified tiles) with MS / SS / Toughened Glass railings upto 1.2M heights. (using any premium Indian brands)
Sanitary & Plumbing
  • Sanitary fittings: will be of KOHLER, ROCCA or equivalent.
  • All Sanitary wares shall be of white colour only.
  • Concealed cisterns (concealed flushing system) will be of GEBERIT from Switzerland or GROHE from Germany or equivalent make. Actuator plates shall be in CP Finish dual flushing system
  • Faucets: for all the bed room toilets will be single lever concealed diverters CP finish, heavy body metal fittings of ROCA from Spain or GROHE from Germany or equivalent make.
  • Provision for hot water connection shall be provided for overhead shower (30cm X 30cm over head rain shower for master bed toilet and multi function over head shower in other toilets, normal shower for servant toilet).
  • Wall mounted single lever faucet make ROCA from Spain or GROHE from Germany will be provided for the wash basins, Kitchen and utility area sink.
  • Plumbing: All water supply lines shall be in ISI marked CPVC pipes. Drainage lines and storm water drain pipes shall be in PVC, Cockroach traps make CHILLI shall be provided as gratings for all necessary locations, Health Faucet ROCA from Spain or GROHE from Germany shall be provided near EWC in all the toilets.
  • Stainless Steel Sink multi bowl with drain board of make NIRALI / FRANKE or equivalent make shall be provided for the kitchen and stainless steel sink without drain board shall be provided for the utility areas
  • Towel rods, towel ring, soap dish shall be provided inside the toilets.
Doors & Windows
  • Window shutters: Prefabricated colour Anodised aluminum sliding shutters .One pane of Insect screen also shall be provided in each window.
  • Door Frames: Main door frame and shutter shall be of seasoned teak wood. Outer and Inner face to be PU coated and finished as per the Architects design.
  • Door Shutters: All internal door frames shall be of seasoned hard wood with flush door shutters. All internal and external faces shall be melamine finish or Paint finish as per the Architects design.
  • Hardware: All hardware shall be in C.P Brass, tower bolts, doorstoppers, ball bearing hinges. Locks shall be mortise of DORSET / YALE make from USA or equivalent.
  • Entrance door shall have hardware such as, Magic Eye, Safety Chain, Door Stopper and a BIO Metric lock from SAMSUNG or equivalent.
Electrical
  • Concealed copper wiring using FINOLEX / V-GUARD / HAVELLS make cables with modular plate switches, centralized cabling system for all electrical and communication requirements.
  • Wiring shall be done for lighting, 5Amps, 15 Amps and AC points in the Apartment.
  • Switches: All switches shall be LEGRAND – ARTEOR make or equivalent.
  • Generator: Power backup will be provided for all common services and selected light and fan point in each living, bedrooms inside apartment and a refrigerator point, plus additional one 5Amp plug point in the Kitchen, one light point in all the toilets, one 5Amp plug point at Living for emergency charging of devices shall be provided (Air-conditioning and Geyser points and other 15Amp points will not be considered for the power back up).
  • Exhaust Fan in toilets.
  • Light fixtures for the Common areas, external areas, apartment balconies and at entrance door of the individual apartments shall be provided.
  • All light fixtures shall be of PHILIPS / HAVELLS or equivalent.
  • Adequate ELCB and MCB shall be provided in each apartments SIEMENS /HAVELLS or equivalent.
  • Provision for the GEYSER points and fresh air fans shall be provided for all toilets.
  • Provision for telephone and Internet shall be provided in the living room and master bed room.
  • Provision for Cable TV / DTH shall be provided in the Living and Master Bed room.
Paint Finishes
  • Premium emulsion paint shall be applied for the ceiling and interior walls of the apartments excluding Utility and Services.
  • Internal Walls: Acrylic / cement based Putty with Premium emulsion paint.
  • External Walls: Weather shield exterior grade emulsion / texture paint.
Elevator/s
  • Elevators: High Speed lift shall be provided as per the Govt. norms in each core with automatic doors & SS brush finish of KONE / SCHINDLER or reputed make.
  • ARD (Automatic Rescue Device) shall be installed in the passenger lift as a premium feature.
Air Conditioning
  • Ductable Air-Conditioning in Living/Dining room.
  • Split Air -Conditioning for Bedrooms
Home Automation
  • Multi level security systems for common areas and lobbies, Access control entry to the
    common entrance / foyers and gymnasium
  • Light motion sensors for selected common areas
  • Home security monitoring, gas leakage detectors, emergency panic intrusion alarm,
    visitor tracking
Landscaping
  • Provision for sprinklers and a drip system shall be provided for necessary common area landscaping.
  • Interlock Pavers to be laid in driveways and walkways.
  • Hard and soft landscaping shall be provided as per the landscape consultant’s design.

Disclaimer: Artech Realtors PVT LTD, reserves the right to change / alter /delete the brands specified above, subject to its availability to an equivalent and competitive product.

  • AV Room
  • Indoor Games Room
  • Air-Conditioned Unisex Gym
  • Swimming pool for Adults and Kids
  • Children’s play area
  • Roof top Party area
  • Guest Suite
  • Consultation room and Doctor’s on call
  • Landscaped balcony with drip irrigation
  • Driver’s Dormitory
  • Elder friendly corner – Yoga + Meditation
  • Multi Purpose Hall
  • Common Area Surveillance
  • Access control & Key less entry (card & biometric) to each flat
  • Lobby Surveillance
  • Vehicle RFID systems & boom barriers
  • IP based video door phone
  • Lift access control
  • Mobile app for online surveillance for working couples
  • Sensor Lighting

Work status as on 08-11-2024, we have completed the following

  • Structural Works – Pile cap – completed, slab – completed, retaining wall – completed, compound wall – completed (110m)
  • Civil Works Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 90% completed, Ground floor – completed, Masonry – Block/ brick – completed (till Terrace floor Completed), Internal plaster -completed (till Terrace floor completed)
  • Internal Finishes – Main door -100% completed Wall tiling 80% completed Flooring 90% completed Passage floor tiling BF to 19th floor -100% completed, Lift cladding – p3 lift completed GF Interlock – 85% completed, Putty works & Painting Putty – 98% completed ,1st to 19th floor -2 coat putty & 2 coat primer completed,Ground Floor -95% 2 coat putty and primer completed ,Painting 1st coat -80% completed (70 flats),Water proofing – 100% completed ,Door frame – 100% completed Stair Handrails -100% completed (firestair handrail completed) Main stair -100% completed, Balcony handrail- 97% completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 95% completed (till 19th floor completed CP Sanitary – 12 flats completed,Corecutting – till 19th floor – 96% completed Centralised Gas piping system- 70% completed Firefighting final fixtures – Horizontal pipe line till 19th floor completed, Vertical pipe line work – 98% completed Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed, 13- 30% completed 14-30% completed ,15 -20% completed Switch fixing – 27 flats completed
  • External Finishes – Windows & Sliding doors – 68 %completed, External Plastering – 98% completed External Painting – 95% completed (1st coat) External Infrastructure and MEP services – 30% completed
  • Final Finishes – Door shutters & ironmongery – 50% Completed, Final painting 13% completed, Plumbing and Sanitary wares – 30% completed, Electrical final fixtures – 30% completed, Firefighting final fixtures -55% completed

As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2024.

  • Internal Finishes – Balcony handrail -100% to be completed
  • Electrical, Plumbing & Firefighting works – Concealed plumbing work – 100% ,plumbing duct work100% to be completed
  • External Finishes – Windows & Sliding doors – 100% to be completed, External Plastering – 100% to be completed, External Painting – 100% to be completed
  • Final Finishes – Door shutter fixing 70%,Eletrical wire pulling 70% to be completed

Work status as on 14-10-2024, we have completed the following..

  • Civil Works -Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 90% completed, Ground floor – completed, Masonry – Block/ brick – completed (till Terrace floor Completed), Internal plaster -completed (till Terrace floor completed)
  • Internal Finishes – Main door -100% completed Wall tiling 80% completed Flooring 90% completed Passage floor tiling BF to 19th floor -100% completed, Lift cladding – p3 lift completed GF Interlock – 70% completed, Putty works & Painting Putty – 98% completed ,1st to 19th floor -2 coat putty & 2 coat primer completed,Ground Floor -95% 2 coat putty and primer completed ,Painting 1st coat -80% completed (70 flats),Water proofing – 100% completed ,Door frame – 100% completed Stair Handrails -100% completed (firestair handrail completed) Main stair -100% completed, Balcony handrail- 97% completed
  • Electrical, Plumbing & Firefighting works- Concealed plumbing works – 95% completed (till 19th floor completed CP Sanitary – 10 flats completed,Corecutting – till 19th floor – 95% completed Centralised Gas piping system- 70% completed Firefighting final fixtures – Horizontal pipe line till GF -19th floor completed, Vertical pipe line work – 98% completed Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed, 13 30% completed 14 ,15 -in progress Switch fixing – 27 flats completed
  • External Finishes- Windows & Sliding doors – 65 %completed,External Plastering – 98% completed External Painting – 95% completed External Infrastructure and MEP services – 25% completed
  • Final Finishes -Door shutters & ironmongery – 50% Completed, Final painting 13% completed, Plumbing and Sanitary wares – 30% completed, Electrical final fixtures – 30% completed, Firefighting final fixtures -55% completed

As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2024.

  • Internal Finishes- Balcony handrail -100% to be completed
  • Electrical, Plumbing & Firefighting works- Concealed plumbing work – 100% ,plumbing duct work100% to be completed
  • External Finishes- Windows & Sliding doors – 100% to be completed, External Plastering – 100% to be completed, External Painting – 100% to be completed
  • Final Finishes – Door shutter fixing 70%,Eletrical wire pulling 70% to be completed

Work status as on 12-09-2024, we have completed the following.

  • Structural Works -Pile cap – completed, slab – completed, retaining wall – completed, compound wall – completed (110m)
  • Civil Works -Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 90% completed, Ground floor – completed, Masonry – Block/ brick – completed (till Terrace floor Completed), Internal plaster -completed (till Terrace floor completed)
  • Internal Finishes – Main door -100% completed Wall tiling 80% completed Flooring 90% completed Passage floor tiling BF to 19th floor -100% completed, Lift cladding – p3 lift completed GF Interlock – 70% completed, Putty works & Painting Putty – 95% completed ,1st to 19th floor -2 coat putty & 2 coat primer completed,Ground Floor -95% 2 coat putty and primer completed ,Painting 1st coat -80% completed (70 flats),Water proofing – 80% completed ,Door frame – 100% completed Stair Handrails -100% completed (firestair handrail completed) Main stair -100% completed, Balcony handrail- 80% completed (3rd – 12th floor – completed)
  • Electrical, Plumbing & Firefighting works- Concealed plumbing works – 95% completed (till 19th floor completed CP Sanitary – 10 flats completed,Corecutting – till 19th floor – 95% completed,Centralised Gas piping system- 70% completed Firefighting final fixtures – Horizontal pipe line till GF -19th floor completed, Vertical pipe line work – 98% completed Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed, 13 30% completed 14 ,15 -in progress Switch fixing – 27 flats completed
  • External Finishes- Windows & Sliding doors – 65 %completed,External Plastering – 96% completed External Painting – 95% completed
  • Mockup – Completed

As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2024.

  • Internal Finishes- Balcony handrail – 13th floor – 19th floor- 100% to be completed
  • Electrical, Plumbing & Firefighting works- CP Sanitary – 15 more flats to be completed, Electrical wire pulling – 10 flats to be completed, switch fixing – 10 more flats to be completed
  • External Finishes- Windows & Sliding doors – 100% to be completed, External Plastering – 100% to be completed, External Painting – 100% to be completed

Work status as on 11-06-2024, we have completed the following.

  • Internal Finishes – Main door – completed, Wall tiling – 3rd to 14th floor (toilets) – 90% completed, 15th,18th floor – 40% completed, 17th floor – 60% completed, Flooring – 3rd,4th ,5th , 6th , 7th floor completed, 2nd floor – 80% completed, 1st floor – 60%, 8th to 18th floor – 80% completed, passage floor tiling – BF to 19th floor – 100% completed, lift cladding – p3 lift completed, GF Interlock – 20% completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, painting 1st coat – 70% completed (70 flats), Water proofing – 3rd to 19th floor 98% completed, OHT- 80% completed, open terrace – 70% completed, Sump tank – 40% completed, GF – 50% Completed, Door frame fixtures – completed, Handrails – 60% completed (firestair handrail completed, Main stair – completed, balcony handrail – 60% completed (2nd – 12th floor – 90% completed)
  • Electrical, Plumbing & Firefighting works- Concealed plumbing works – 90% completed (till 19th floor completed, CP Sanitary – 4 flats completed, Corecutting – till 19th floor – 95% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till GF -19th floor completed, vertical pipe line work – 98% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed, switch fixing – 27 flats completed
  • External Finishes- Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th,6th,7th floor – 75% completed, 8th, to 19th – 60% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, B,C,D,E -one coat paint completed, plumbing duct line completed

As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2024.

  • Internal Finishes- Water proofing – open terrace – 90% to be completed, GF – 90% to be completed, Handrail – 1st to 12th Floor – 90% to be completed, balcony handrail – 12th floor – 19th floor- 90% to be completed
  • Electrical, Plumbing & Firefighting works- CP Sanitary – 10 flats to be completed, Electrical wire pulling – 10 flats to be completed, switch fixing – 10 more flats to be completed
  • External Finishes- Windows & Sliding doors – 8th to 19th floor – 80% to be completed

Work status as on 09-05-2024, we have completed the following.

  • Internal Finishes – Main door – completed, Wall tiling – 3rd to 14th floor (toilets) – 90% completed, 15th,18th floor – 40% completed, 17th floor – 60% completed, Flooring – 3rd,4th ,5th , 6th , 7th floor completed, 2nd floor – 80% completed, 1st floor – 40%, 8th to 15th floor – 80% completed, 16th – 60%, 17th floor – 40%, 18th floor – 20% completed, passage floor tiling – BF to 19th floor – 100% completed, lift cladding – p3 lift completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, painting 1st coat – 65% completed (50 flats), Water proofing – 3rd to 19th floor 98% completed, OHT- 80% completed, open terrace – 60% completed, Sump tank – 40% completed, GF – 30% COMPLETED, Door frame fixtures – completed, Handrails – 60% completed (firestair handrail completed, Main stair – completed, balcony handrail – 60% completed)
  • Electrical, Plumbing & Firefighting works- Concealed plumbing works – 90% completed (till 15th floor completed, 16th, 17th,18th, 19th floor – 90% completed), Corecutting – till 19th floor – 95% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till GF -19th floor completed, vertical pipe line work – 98% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed, switch fixing – 17 flats completed
  • External Finishes- Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th,6th,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, B,C,D,E -one coat paint completed, plumbing duct line completed
  • Mockup-Completed.

As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2024.

    • Internal Finishes- Flooring – 8th to 15th 100% 100% to be completed, Handrail – 1st to 12th Floor – 90% to be completed
    • Electrical, Plumbing & Firefighting works-Concealed plumbing works – till 19th floor 100% to be completed, CP Sanitary – 5 flats to be completed, Electrical wire pulling – 10 flats to be completed, switch fixing – 10 more flats to be completed.
    • External Finishes- Windows & Sliding doors – 11th to 18th floor – 70% to be completed

Work status as on 12-04-2024, we have completed the following.

      • Internal Finishes Main door – completed, Wall tiling – 3rd to 12th floor (toilets) – 90% completed, 13th floor – 60% completed, 14th,15th,18th floor – 40% completed, 17th floor – 60% completed, Flooring – 3rd,4th ,5th floor completed, 2nd floor – 80% completed, 6th floor – 95% , 7th – 12th floor – 80% completed, 15th floor- 40%, 13th floor – 80% completed, 14th – 60%, 16th – 60%, 17th floor – 40%, 18th floor – 20% completed, passage floor tiling – 1st to 14th floor – 100% completed, lift cladding – p3 lift completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, painting 1st coat – 30% completed (25 flats), Water proofing – 3rd to 19th floor 98% completed, OHT- 80% completed, open terrace – 60% completed, Sump tank – 30% completed, Door frame fixtures – completed, Handrails – 60% completed (firestair handrail completed, Main stair – completed, balcony handrail – 60% completed)
      • Electrical, Plumbing & Firefighting works Concealed plumbing works – 90% completed (till 15th floor completed, 16th, 17th,18th, 19th floor – 90% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till GF -19th floor completed, vertical pipe line work – 98% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed, switch fixing – 12 flats completed
      • External Finishes Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th,6th,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, B,C,D,E -one coat paint completed, plumbing duct line – 2nd to 14th floor – 90% completed

As per the current work status from our site, we are targeted to complete the following works by the end of APRIL 2024.

      • Internal Finishes wall tiling up to 14th floor 90% to be completed, Flooring – up to 17th floor 100% to be completed, passage floor tiling – 15th,16th, 17th,18th, GF floor 100% to be completed, Handrail – 80% to be completed
      • Electrical, Plumbing & Firefighting works Concealed plumbing works – till 19th floor 100% to be completed, CP Sanitary – 5 flats to be completed, Electrical wire pulling – 10 flats to be completed, switch fixing – 10 more flats to be completed
      • External Finishes Windows & Sliding doors – 11th to 18th floor – 70% to be completed, plumbing duct line – up to 19th floor 100% to be completed

Work status as on 12-03-2024, we have completed the following.

      • Internal Finishes – Main door – 84 nos: out of 92 nos:completed, Wall tiling – 3rd to 12th floor (toilets) – 90% completed, 13th floor – 40% completed, 14th,15th,18th floor – 40% completed, 17th floor – 60% completed, Flooring – 3rd floor completed, 2nd floor – 70% completed, 4th – 12th floor – 80% completed,15th floor- 40%, 13th floor – 80% completed, 14th – 40%,16th – 60%, 17th floor – 30%,18th floor – 20% completed, passage floor tiling – 1st to 12th floor – 95% completed, lift cladding – p3 lift completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, Water proofing – 3rd to 19th floor 98% completed, OHT- 80%completed, open terrace – 40% completed, Door frame fixtures – completed, Handrails – 60% completed (firestair handrail completed, Main stair – completed, balcony handrail – 60% completed).
      • Electrical, Plumbing & Firefighting works Concealed plumbing works – 95% completed (till 15th floor completed, 16th, 17th,18th, 19th floor – 90% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till GF -19th floor completed, vertical pipe line work – 98% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed
      • External Finishes Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, B,C,D,E -one coat paint completed, plumbing duct line – 2nd to 14th floor – 90% completed

As per the current work status from our site, we are targeted to complete the following works by the end of MARCH 2024.

      • Internal Finishes Main door – 100% to be completed, wall tiling up to 14th floor 90% to be completed, Flooring – up to 15th floor 80% to be completed, passage floor tiling – up to 15th floor 95% to be completed, water proofing works – OHT – 100% to be completed, open terrace – 80% to be completed, Handrail – 80% to be completed
      • Electrical, Plumbing & Firefighting works Concealed plumbing works – till 19th floor 100% to be completed, Firefighting final fixtures – 17th – 19th floor 100% to be completed, Electrical wire pulling – up to 15th floor – 90% to be completed
      • External Finishes Windows & Sliding doors – 11th to 18th floor – 70% to be completed, plumbing duct line – up to 19th floor 100% to be completed

Work status as on 10-02-2024, we have completed the following.

      • Structural Works – Pile cap – completed, slab – 95% completed, retaining wall – 70% completed, compound wall – 80% completed (110m), GF, BF floor slab – 70% completed
      • Civil Works Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – completed, Masonry – Block/ brick – completed (till Terrace floor Completed), Internal plaster -completed (till Terrace floor completed)
      • Internal Finishes – Main door – 84 nos: out of 92 nos:completed, Wall tiling – 3rd to 12th floor (toilets) – 90% completed, 13th floor – 40% completed, 14th,15th,18th floor – 20% completed, 17th floor – 40% completed, Flooring – 3rd floor completed, 4th – 12th floor – 80% completed,15th floor- 40%, 13th floor – 40% completed, 14th,16th,18th floor – 20% completed, passage floor tiling – 1st to 12th floor – 95% completed, lift cladding – p3 lift completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, Water proofing – 3rd to 19th floor 98% completed, OHT- 80%completed, open terrace – 40% completed, Door frame fixtures – completed, Handrails – 60% completed (firestair handrail completed, Main stair – completed, balcony handrail – 60% completed)
      • Electrical, Plumbing & Firefighting works Concealed plumbing works – 95% completed (till 15th floor completed, 16th, 17th,18th, 19th floor – 90% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till GF -19th floor completed, vertical pipe line work – 90% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 12th floor – 90% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, B,C,D,E -one coat paint completed, plumbing duct line – 2nd to 14th floor – 90% completed
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of FEBRUARY 2024.

      • Structural Works – Ground floor slab – 80% to be completed, Raft slab – 80% to be completed, BF column 1 more No: to be completed
      • Internal Finishes – Main door – 100% to be completed, wall tiling up to 14th floor 90% to be completed, Flooring – up to 15th floor 80% to be completed, passage floor tiling – up to 15th floor 95% to be completed, water proofing works – OHT – 100% to be completed, open terrace – 80% to be completed, Handrail – 80% to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 19th floor 100% to be completed, Firefighting final fixtures – 17th – 19th floor 100% to be completed, Electrical wire pulling – up to 15th floor – 90% to be completed
      • External Finishes – Windows & Sliding doors – 11th to 18th floor – 70% to be completed, plumbing duct line – up to 19th floor 100% to be completed

Work status as on 13-01-2024, we have completed the following.

      • Structural Works – Pile cap – completed, slab – 95% completed, retaining wall – 70% completed, compound wall – 80% completed (110m), GF, BF floor slab – 70% completed
      • Civil Works Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – completed, Masonry – Block/ brick – completed (till Terrace floor Completed), Internal plaster -completed (till Terrace floor completed)
      • Internal Finishes – Main door – 84 nos: out of 92 nos:completed, Wall tiling – 3rd to 11th floor (toilets) – 90% completed, 13th floor – 40% completed, 14th,15th,18th floor – 20% completed, 17th floor – 40% completed, Flooring – 3rd floor completed, 4th – 11th floor – 80% completed,15th floor- 40%, 13th floor – 40% completed, 14th,16th,18th floor – 20% completed, passage floor tiling – 1st to 6th floor – 95% completed, lift cladding – p3 lift completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, Water proofing – 3rd to 19th floor 95% completed, OHT- 80%completed, open terrace – 30% completed, Door frame fixtures – completed, Handrails – 60% completed (firestair handrail completed, Main stair – completed, balcony handrail – 60% completed)
      • Electrical, Plumbing & Firefighting works Concealed plumbing works – 95% completed (till 15th floor completed, 16th, 17th,18th, 19th floor – 90% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till GF -19th floor 90% completed, vertical pipe line work – 90% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 11th floor – 90% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, B,C,D,E -one coat paint completed, plumbing duct line – 2nd to 14th floor – 90% completed
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JANUARY 2024.

      • Structural Works – Ground floor slab – 80% to be completed, Raft slab – 80% to be completed, BF column 1 more No: to be completed
      • Internal Finishes – Main door – 100% to be completed, wall tiling up to 14th floor 90% to be completed, Flooring – up to 15th floor 80% to be completed, passage floor tiling – up to 15th floor 95% to be completed, water proofing works – OHT – 100% to be completed, open terrace – 80% to be completed, Handrail – 80% to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 19th floor 100% to be completed, Firefighting final fixtures – 17th – 19th floor 100% to be completed, Electrical wire pulling – up to 15th floor – 90% to be completed
      • External Finishes – Windows & Sliding doors – 11th to 18th floor – 70% to be completed, plumbing duct line – up to 19th floor 100% to be completed

Work status as on 08-12-2023, we have completed the following.

      • Structural Works Pile cap – completed, slab – 95% completed, retaining wall – 45% completed, compound wall – 60% completed (42m), GF, BF floor slab – 50% completed
      • Civil Works Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – completed, Masonry – Block/ brick – completed (till Terrace floor Completed), Internal plaster -completed (till Terrace floor completed)
      • Internal Finishes – Main door – 84 nos: out of 92 nos:completed, Wall tiling – 3rd to 10th floor (toilets) – 90% completed, 13th floor – 20% completed, 14th,15th,18th floor – 20% completed, Flooring – 3rd floor completed, 4th floor – 80%, 5th floor – 80%, 6th floor – 80%, 7th floor – 80%, 8th floor – 80%, 9th floor – 80% completed, 10th floor – 80%, 11th floor – 80% completed 15th floor- 40%, 13th,14th,16th,18th floor – 20% completed, passage floor tiling – 2nd floor – 95% completed putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 95% 2 coat putty and primer completed, Water proofing – 3rd to 16th floor 98% completed, 17 to 19th floor – 70% completed, terrace water tank completed, Door frame fixtures – completed, Handrails – 20% completed (firestair handrail completed, Main stair – completed, balcony handrail – frameonly – 70% completed)
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 95% completed (till 15th floor completed, 16th, 17th,18th, 19th floor – 90% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 60% completed, Firefighting final fixtures – horizontal pipe line till 19th floor completed, vertical pipe line work – 90% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 9th floor – 90% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D,E,A outside area – 2 coat damp proof, 2 coat putty, one coat primer completed 90% completed, plumbing duct line – 2nd to 14th floor – 60% completed
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2023.

      • Structural Works – Ground floor slab – 50% more to be completed, Raft slab – 80% to be completed, BF column 12 Nos: to be completed
      • Internal Finishes – Main door – 100% to be completed, wall tiling 11th,12th, 13th floor to be completed, Flooring – 12th,13th,14th floor to be completed,passage floor tiling – 1st,3rd,4th,5th floor 95% to be completed, water proofing works – balcony and toilets – 3rd to 19th floors 95% to be completed,
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 19th floor 100% to be completed, Firefighting final fixtures – 17th – 19th floor 100% to be completed, Electrical wire pulling – 10th,11th,12th floor – 100% to be completed
      • External Finishes – Windows & Sliding doors – 11th to 18th floor – 70% to be completed, plumbing duct line – 2nd to 14th floor 90% to be completed

Work status as on 10-11-2023, we have completed the following.

      • Structural Works – Pile cap – completed, slab – 95% completed, retaining wall – 45% completed, compound wall – 60% completed (42m)
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – completed, Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster -Ground floor – completed, 98% completed (till 19th floor completed)
      • Internal Finishes – Main door – 84 nos: out of 92 nos:completed, Wall tiling – 3rd to 10th floor (toilets) – 90% completed, 13th floor – 20% completed, 14th,15th,18th floor – 20% completed, Flooring – 3rd floor completed, 4th floor – 80%, 5th floor – 80%, 6th floor – 80%, 7th floor – 80%, 8th floor – 80%, 9th floor – 80% completed, 10th floor – 70%, 15th floor- 40%, 13th,14th,16th,18th floor – 20% completed, putty works & Painting – putty 95% completed 1st to 19th floor 2 coat putty & 2 coat primer completed, GF – 70% one coat putty and primer completed, Water proofing – 3rd to 13th floor 98% completed, 14 to 17th floor – 70% completed, terrace water tank 98% completed, Door frame fixtures – completed, Handrails – 20% completed (firestair handrail completed, Main stair – 95% completed, balcony handrail – frameonly – 70% completed)
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 90% completed (till 15th floor completed, 16th, 17th,18th floor – 40% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 40% completed, Firefighting final fixtures – horizontal pipe line till 16th floor completed, 17th floor – 60% completed, vertical pipe line work – 90% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 9th floor – 70% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D outside area – 2 coat damp proof, 2 coat putty, one coat primer completed , E, A – 2 coat damp proof completed, 2 coat putty, one coat primer work – 80% completed, plumbing duct line – 2nd to 14th floor – 60% completed
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2023.

      • Inside plastering – 19th floor 100% to be completed
      • Internal Finishes – Main door – 100% to be completed, wall tiling -up to 10th floor 100% to be completed, 11th ,12th – 80% to be completed, Flooring – 4th to 10th floor 100% to be completed, 11th ,12th – 50% to be completed, water proofing works – balcony and toilets – 3rd to 19th floors 100% to be completed, Handrails – balcony handrail 40% including glass portion to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 19th floor 100% to be completed, Gas piping system- 50% to be completed, Firefighting final fixtures – 17th – 19th floor 100% to be completed, Electrical wire pulling – 4th to 9th floor – 100% to be completed
      • External Finishes – Windows & Sliding doors – 11th to 18th floor – 50% to be completed, External Plastering – 100% to be completed, External painting – E,A – 2 coat putty and one coat primer 100% to be completed, plumbing duct line – 2nd to 14th floor 90% to be completed

Work status as on 10-10-2023, we have completed the following.

      • Structural Works – Pile cap – completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall completed, ramp completed, retaining wall – 45% completed, compound wall – 60% completed (42m), LMR Base slab, roof completed, main and fire stair head room completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – completed, Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster -Ground floor – completed, 98% completed (till 19th floor completed)
      • Internal Finishes – Main door -1st to 3rd floor completed, Wall tiling – 3rd to 8th floor (toilets) – 90% completed, 9th floor – 80% completed, 13th floor – 20% completed, 14th,15th,18th floor – 20% completed, Flooring – 3rd floor completed, 4th floor – 80%, 5th – 80%, 6th – 80%, 7th – 80%, 8th – 50%, 9th floor – 50% completed, 13th,14th,16th,18th floor – 20% completed, putty works & Painting – putty 50% completed 1st to 19th floor 2 coat putty & 2 coat primer 90% completed, Water proofing – 40% completed (till 16th floor bathrooms only, balcony – upto 16th floor 100% completed), Door frame fixtures – completed, Handrails – 20% completed (firestair handrail completed, Main stair – GF to 2nd floor, 1st to 19th floor completed, balcony handrail – frameonly – 70% completed)
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 90% completed (till 15th floor completed,16th, 17th,18th floor – 40% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- 10% completed, Firefighting final fixtures – horizontal pipe line till 16th floor completed, vertical pipe line work – 80% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 9th floor – 40% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D outside area – 2 coat damp proof, 2 coat putty, one coat primer completed , E, A – 2 coat damp proof completed, 2 coat putty, one coat primer work – 50% completed, plumbing duct line – 40% completed
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2023.

      • Civil Works – Inside plastering – 19th floor 100% to be completed
      • Internal Finishes – Main door – 100% to be completed, wall tiling -up to 10th floor 80% to be completed, Flooring – 4th to 10th floor 100% to be completed, Water proofing – 11th,12th – 50% to be completed, water proofing works – balcony and toilets – till 19th floors 100% to be completed, Handrails – balcony handrail 40% including glass portion to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 19th floor 100% to be completed, Gas piping system- 50% to be completed, Firefighting final fixtures – 100% to be completed, Electrical wire pulling – 4th to 9th floor – 100% to be completed
      • External Finishes – Windows & Sliding doors – 11th to 18th floor – 50% to be completed, External Plastering – 100% to be completed, External painting – E,A – 2 coat putty and one coat primer 100% to be completed, plumbing duct line – 80% to be completed

Work status as on 13-09-2023, we have completed the following.

      • Structural Works – Pile cap – completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall completed, ramp completed, retaining wall – 40% completed, compound wall – 60% completed (42m), LMR Base slab, roof completed, main and fire stair head room completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – 70% completed, Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster – 1st floor – completed, 94% completed (till 18th floor completed)
      • Internal Finishes – Main door -sample flat only, Wall tiling – 3rd to 8th floor (toilets) – 90% completed, Flooring – 3rd floor completed, 4th, 5th, 6th, 7th, 8th, 9th floor (45% completed), putty works & Painting – putty 50% completed (till 11th floor 2 coat putty – completed, 10th to 16th floor one coat putty 90% completed, 17th floor – 90% completed, 18th floor – 80% completed, 1st Floor – 15% completed (2 coat primer, 2 coat putty), primer up to 18th floor completed, primer after two coat putty till 9th floor completed, Water proofing – 39% completed (till 12th floor bathrooms only, balcony – upto 12th floor 100% completed), Door frame fixtures – completed, Handrails – 20% completed (firestair handrail completed, Main stair – GF to 2nd floor, 17th to 19th floor completed, balcony handrail – frameonly – 70% completed)
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 90% completed (till 15th floor completed,16th, 17th,18th floor – 40% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- mock up only, Firefighting final fixtures – horizontal pipe line till 16th floor completed, vertical pipe line work – 60% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 9th floor – 40% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed , 11th to 18th floor – 20% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – C,B,D outside area – 2 coat damp proof, 2 coat putty, one coat primer completed , E, A – 2 coat damp proof completed), plumbing duct line – 3rd to 9th floor floor completed
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of SEPTEMBER 2023.

      • Civil Works – Block work – Ground floor to be completed, Inside plastering – 19th floor 100% to be completed, GF to be completed
      • Internal Finishes – Main door – 50% to be completed, wall tiling – 3rd to 13th floor 100% to be completed, Flooring – 4th to 10th floor 100% to be completed, Water proofing – 11th,12th – 50% to be completed, putty and painting – 10th to 16 th floor 2nd coat putty – 80% to be completed, primer after two coat putty till 14th floor to be completed, water proofing works – balcony and toilets – till 18th floors 100% to be completed, Handrails – Main stair 100% to be completed, balcony handrail 40% including glass portion to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 19th floor 100% to be completed, Firefighting final fixtures – 100% to be completed, Electrical wire pulling – 4th to 9th floor – 100% to be completed
      • External Finishes – Windows & Sliding doors – 11th to 18th floor – 50% to be completed, External Plastering – 100% to be completed, External painting – E,A – 2 coat putty and one coat primer to be completed, plumbing duct line – till 19th floor to be completed

Work status as on 12-08-2023, we have completed the following.

      • Structural Works – Pile cap – 82% completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall completed, ramp completed, retaining wall – 40% completed, compound wall – 60% completed (42m), LMR Base slab completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – 70% completed, Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster – 1st floor – completed, 94% completed (till 18th floor completed)
      • Internal Finishes – Main door -sample flat only, Wall tiling – 3rd to 8th floor (toilets) – 60% completed, Flooring – 3rd floor (A,B,C,D,E – 82% completed), 4th, 5th, 6th, 7th, 8th, 9th floor (25% completed), putty works & Painting – putty 50% completed (till 9th floor 2 coat putty – completed, 10th to 16th floor one coat putty 90% completed, 17th floor – 90% completed, 18th floor – 80% completed, 1st Floor – 15% completed (2 coat primer, 2 coat putty), primer up to 18th floor completed, Water proofing – 39% completed (till 12th floor bathrooms only, balcony – upto 12th floor 100% completed), Door frame fixtures -completed, Handrails – 20% completed (firestair handrail GF to 14th floor completed, Main stair – GF to 2nd floor, 17th to 19th floor completed, balcony handrail – frameonly – 70% completed)
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 90% completed (till 12th floor, 13th floor – 60% completed , 14th,15th,16th floor – 20% completed, Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- mock up only, Firefighting final fixtures – horizontal pipe line till 16th floor completed, vertical pipe line work – 50% completed, Electrical wire pulling – 3rd floor – 100% completed, 4th floor to 9th floor – 20% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – primer – 60% completed, damp proof – 70% completed, one putty – 30% completed, 2nd coat – 15% completed)
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of AUGUST 2023.

      • Structural Works – LMR roof to be completed, main and fire stair head room to be completed
      • Civil Works – Block work – Ground floor to be completed, Inside plastering – 19th floor 100% to be completed, GF to be completed
      • Internal Finishes – Main door – 50% to be completed, wall tiling – 3rd to 13th floor 100% to be completed, Flooring – 3rd to 10th floor 100% to be completed, Water proofing – 11th,12th – 50% to be completed, putty and painting – 10th to 18 th floor 2nd coat putty – 80% to be completed, water proofing works – balcony and toilets – till 18th floors 100% to be completed, Haindrails – Main stair and Fire stair 100% to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – till 17th floor – 100% to be completed, Firefighting final fixtures – 100% to be completed, Electrical wire pulling – 4th to 9th floor – 50% to be completed
      • External Finishes – External Plastering – 100% to be completed, External painting – Damp proof – 90% to be completed, one putty – 50% to be completed, 2nd coat – 50% to be completed, plumbing duct line – 50% to be completed

Work status as on 12-07-2023, we have completed the following.

      • Structural Works – Pile cap – 82% completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall – 60% completed, ramp completed, retaining wall – 30% completed, compound wall – 40% completed (42m), LMR – 30% Completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 80% completed, Ground floor – 50% completed, Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster – 1st floor – 96% completed, 94% completed (till 18th floor completed)
      • Internal Finishes – Main door -sample flat only, Wall tiling – 3rd to 8th floor (toilets) – 15% completed, Flooring – 3rd floor (A,B,C,D,E – 82% completed), 4th, 5th, 6th, 7th, 8th, 9th floor (25% completed), putty works & Painting – putty 50% completed (till 9th floor 2 coat putty – completed, 10th to 16th floor one coat putty 90% completed, 17th floor – 90% completed, 18th floor – 80% completed, 1st Floor – 15% completed (2 coat primer, 2 coat putty), 3rd,4th,5th floor 2nd coat putty completed, primer up to 18th floor completed, Water proofing – 39% completed (till 12th floor bathrooms only, balcony – upto 10th floor 75% completed), Door frame fixtures – 97% completed (18th floor – completed), Handrails – 20% completed (firestair handrail GF to 14th floor completed, balcony handrail – frameonly – 70% completed)
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 58% completed (till 12th floor, 13th floor – 25% completed), Corecutting – till 19th floor – 90% completed, Centralised Gas piping system- mock up only, Firefighting final fixtures – horizontal pipe line till 16th floor completed, vertical pipe line work – 20% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 90% completed, 4th floor – 90% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – primer – 60% completed, damp proof – 50% completed)
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JULY 2023.

      • Structural Works – Amenities : Swimming pool wall – 80% to be completed, childrens play area, SHR, LMR to be completed
      • Civil Works – Block work – Ground floor to be completed, Inside plastering – 1st floor – 100% to be completed, 19th floor 100% to be completed
      • Internal Finishes – Water proofing – 11th,12th – 50% to be completed

Work status as on 06-06-2023, we have completed the following.

      • Structural Works – Pile cap – 82% completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall – 60% completed, ramp completed, retaining wall – 25% completed, compound wall – 40% completed (42m), LMR – 30% Completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Basement floor – 70% completed, Ground floor – 25% completed, Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster – 1st floor – 96% completed, 94% completed (till 18th floor completed)
      • Internal Finishes – Main door -sample flat only, Wall tiling – 3rd to 7th floor (toilets) – 15% completed, Flooring – 3rd floor (A,B,C,D,E – 82% completed), 4th, 5th, 6th, 7th, 8th, 9th floor (23% completed), putty works & Painting – putty 50% completed (till 9th floor 2 coat putty – completed, 10th to 16th floor one coat putty 90% completed, 17th floor – 80% completed, 18th floor – 50% completed, 1st Floor – 15% completed (2 coat primer, 2 coat putty), 3rd,4th,5th floor 2nd coat putty completed, primer up to 18th floor completed, Water proofing – 39% completed (till 12th floor bathrooms only, balcony – upto 10th floor 75% completed), Door frame fixtures – 97% completed (18th floor – completed), Handrails – 20% completed (firestair handrail GF to 14th floor completed, balcony handrail – frameonly – 70% completed))
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 58% completed (till 11th floor), Corecutting – till 18th floor completed, 19th floor – 50% completed, Centralised Gas piping system- mock up only, Firefighting final fixtures – horizontal pipe line till 16th floor completed, vertical pipe line work – 15% completed
      • External Finishes – Windows & Sliding doors – 3rd floor – 75% completed, 4th floor – 75% completed, 5th floor,6th floor,7th floor – 75% completed, 8th, 9th, 10th – 30% completed External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – primer – 60% completed, damp proof – 50% completed)
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2023.

      • Structural Works – Amenities : Swimming pool wall – 80% to be completed, childrens play area, SHR, LMR to be completed
      • Civil Works – Block work – Ground floor to be completed, Inside plastering – 1st floor – 100% to be completed, 19th floor 100% to be completed
      • Internal Finishes – Water proofing – 11th,12th – 50% to be completed

Work status as on 05-05-2023, we have completed the following.

      • Structural Works – Pile cap – 82% completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall – 60% completed, ramp completed, retaining wall – 25% completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster – 1st floor – 95% completed, 94% completed (till 18th floor completed)
      • Internal Finishes – Main door -sample flat only, Wall tiling – 3rd to 7th floor (toilets) – 15% completed, Flooring – 3rd floor (A,B,C,D,E – 80% completed), 4th, 5th, 6th, 7th, 8th, 9th floor (20% completed), putty works & Painting – putty 50% completed (till 9th floor 2 coat putty – completed, 10th to 16th floor one coat putty 90% completed, 17th floor – 80% completed, 18th floor – 50% completed, 1st Floor – 15% completed (2 coat primer, 2 coat putty), primer up to 18th floor completed, Water proofing – 37% completed (till 12th floor bathrooms only, balcony – upto 8th floor 75% completed), Door frame fixtures – 95% completed (18th floor – completed), Handrails – 20% completed (firestair handrail GF to 14th floor completed, balcony handrail – frameonly – 70% completed))
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 56% completed (till 10th floor), Corecutting – till 18th floor completed, Centralised Gas piping system- mock up only, Firefighting final fixtures – horizontal pipe line till 15th floor completed, fire alarm work started
      • External Finishes – Windows & Sliding doors – 3rd floor – 75% completed, 4th floor – 75% completed, 5th floor,6th floor,7th floor – 50% completed, 8th, 9th, 10th – 20% completed External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – primer – 60% completed, damp proof – 50% completed)
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2023.

      • Structural Works – Amenities : Swimming pool wall – 80% to be completed, childrens play area, SHR, LMR to be completed
      • Civil Works – Block work – 19th floor 100% to be completed, Inside plastering – 1st floor – 100% to be completed, 19th floor to be completed
      • Internal Finishes – Wall tiling – 8th, 9th floor 50% to be completed, Waterproofing – balcony 9th, 10th – 80% to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing work – 60% to be completed
      • External Finishes – Windows & Sliding doors – up to 10th floor 80% to be completed

Work status as on 08-04-2023, we have completed the following.

      • Structural Works – Pile cap – 82% completed, slab – 95% completed, swimming pool base slab completed, swimming pool wall – 60% completed, ramp completed, retaining wall – 25% completed
      • Civil Works – Ceiling plastering – 100% completed (till 1st – 20th floor), Masonry – Block/ brick – 98% completed (till 19th floor Completed), Internal plaster – 1st floor – 90% completed, 94% completed (till 18th floor completed)
      • Internal Finishes – Main door -sample flat only, Wall tiling – 3rd to 7th floor (toilets) – 14% completed, Flooring – 3rd floor (A,B,C,D,E – 80% completed), 4th, 5th, 6th, 7th, 8th, 9th floor (18% completed), putty works & Painting – putty 50% completed (till 9th floor 2 coat putty – completed, 10th to 16th floor one coat putty 90% completed, 17th floor – 80% completed, 18th floor – 50% completed, 1st Floor – 15% completed (2 coat primer, 2 coat putty), primer up to 18th floor completed, Water proofing – 37% completed (till 12th floor bathrooms only, balcony – upto 8th floor 75% completed), Door frame fixtures – 95% completed (18th floor – 80% completed), Handrails – 20% completed (firestair handrail GF to 14th floor completed, balcony handrail – frameonly – 70% completed))
      • Electrical, Plumbing & Firefighting works – Concealed plumbing works – 56% completed (till 10th floor), Corecutting – till 16th floor completed, Centralised Gas piping system- mock up only, Firefighting final fixtures – horizontal pipe line till 15th floor completed, fire alarm work started
      • External Finishes – Windows & Sliding doors – 3rd floor – 75% completed, 4th floor – 75% completed, External Plastering – 98% completed (B flat outside), A Flat outside – 92% completed, E Flat outside – 97% completed, C Flat outside – 99% completed, D flat outside – 90% completed, External Painting – primer – 60% completed, damp proof – 50% completed)
      • Mockup – Blockwork, Internal plaster – 100% completed, Firefighting – 100% completed, Concealed plumbing – 100% completed, Waterproofing – 100% completed, Electrical wall services – 100% completed, Reticulated gas piping – 100% completed, Painting – Primer application 100% completed, First coat painting 100% completed, Final coat painting 100% completed

As per the current work status from our site, we are targeted to complete the following works by the end of APRIL 2023.

      • Structural Works – Amenities : Swimming pool wall – 80% to be completed, childrens play area, SHR, LMR to be completed
      • Civil Works – Block work – 19th floor 100% to be completed, Inside plastering – 1st floor – 100% to be completed, 19th floor to be completed
      • Internal Finishes – Wall tiling – 8th, 9th floor 50% to be completed, Waterproofing – balcony 9th, 10th – 80% to be completed
      • Electrical, Plumbing & Firefighting works – Concealed plumbing work – 60% to be completed
      • External Finishes – Windows & Sliding doors – up to 7th floor 80% to be completed

Click here to see the previous work progress updates.

Structure
  • Deep pile foundation complying with seismic 3 zone
  • RCC frame structure with brickwork and or concrete block partitions.
  • Concrete grade and Steel grade as per structural consultant’s advice.
Flooring, Tiling & Railings
  • Main entrance lobby, Lift lobby and Lift fascia (wall & floor) using composite
    marble / gSTRUCTURE

    • Column footing complying with seismic 3 zone.
    • RCC frame structure with concrete block and brickwork partitions. Concrete grade and Steel grade as per structural consultant’s advice.

    FLOORING, TILING & RAILINGS

    • Main entrance lobby, Lift lobby and Lift fascia (wall & floor) using composite marble / granite / vitrified tiles, as per the architect’s design.
    • Staircases using granite / vitrified tile flooring with hand railing using SS / MS / GI with or without toughened glass as per architect’s design.
    • Car park Area: Grano flooring with grooves or exterior grade paving tiles.
    • Foyer / Living / Dining using 80cm X 80cm Premium Double charged vitrified tiles (Kajaria / Asian/Somany).
    • Kitchen: 60cm X 60cm premium double charged Vitrified tiles for the flooring (Kajaria / Asian / Somany).
    • All Bedrooms 60cm X 60cm Premium Double Charged Vitrified tiles (Kajaria / Asian / Somany).
    • All Bed room Toilets Designer ceramic tile concepts 30cm X 30cm for floor and 60cm X 30cm for walls up to ceiling height of 8′ 0.
    • Servants Toilet : Ceramic tile 30cm X 30cm for floor and 30cm X 45cm for walls upto 7’6″ height.
    • Utility Room : 30cm X 30cm for floor and 30cm X 45cm for (kitchen wall) walls at a height of 2′ above the counter if any.
    • Balconies / Open Terraces / Decks : Rustic / Antiskid / ceramic tiles 30cm X 30cm or (wood finished vitrified tiles) with SS / MS / GI with or without toughened glass as per architect’s design upto 1.2m height.

    SANITARY & PLUMBING

    • Sanitary fittings: will be of KOHLER or ROCA.
    • All Sanitary wares shall be of white colour only.
    • Concealed cisterns (concealed flushing system) will be of GEBER IT from Switzerland or GROHE from Germany. Actuator plates shall be in CP Finish dual flushing system.
    • Faucets: for all the bed room toilets will be single lever concealed diverters CP finish, heavy body metal fittings of ROCA from Spain or GROHE from Germany or KOHLER. Provision for hot water connection shall be provided for overhead shower.
    • Wall mounted single lever faucet make ROCA from Spain or GROHE from Germany or KOHLER will be provided for the wash basins, Kitchen and utility area sink.
    • Plumbing: All water supply lines shall be in ISI marked CPVC pipes. Drainage lines and storm water drain pipes shall be in PVC, Cockroach traps make CHILLI shall be provided as gratings for all necessary locations, Health Faucet ROCA from Spain or GROHE from Germany or KOHLER shall be provided near EWC in all the toilets.
    • Stainless Steel Sink multi bowl with drain board of make N I RALI / FRANKE shall be provided for the kitchen and stainless steel sink without drain board shall be provided for the utility areas.
    • Towel rods, towel ring, soap dish shall be provided inside the toilets.

    DOORS & WINDOWS

    • Window shutters: Prefabricated colour anodised aluminum sliding shutters by (Hindalco). One pane of Insect screen also shall be provided in each window.
    • Door Frames: Main door frame and shutter shall be of seasoned teak wood. Outer and Inner face to be PU coated and finished as per the Architect’s design.
    • Door Shutters: All internal door frames shall be of seasoned hard wood with flush door shutters.
    • All internal and external faces shall be melamine finish or Paint finish as per the Architects design.
    • Hardware: All hardware shall be in C.P Brass, tower bolts, doorstoppers, ball bearing hinges. Locks shall be mortise of DORSET/YALE make from USA/ Union.
    • Entrance door shall have hardware such as, Magic Eye, Safety Chain, Door Stopper and a BIO Metric lock from HAFELE / YALE.

    ELECTRICAL

    • Concealed copper wiring using FINOLEX / V-GUARD / HAVELLS make cables with modular plate switches, centralized cabling system for all electrical and communication requirements. Wiring shall be done for lighting, 6 Amps, 16 Amps and AC points in the Apartment.
    • Switches: All switches shall be LEGRAND or SCHNEIDER.
    • Generator: Power backup will be provided for all common services and selected light and fan point each in living, bedrooms inside apartment and a refrigerator point, plus additional one 6 Amp plug point in the Kitchen, one light point in all the toilets, one 6 Amp plug point at Living for emergency charging of devices shall be provided (Air-conditioning and Geyser points and other 16 Amp points will not be considered for the power back up).
    • Light fixtures for the Common areas, external areas, apartment balconies and at entrance door of the individual apartments shall be provided.
    • All light fixtures shall be of PHILIPS / HAVELLS.
    • Adequate ELCB and MCB shall be provided in each apartments SI EM ENS / HAVELLS.
    • Provision for the GEYSER points and fresh air fans shall be provided for all toilets.
    • Provision for telephone and Internet shall be provided in the living room and master bed room.
    • Provision for Cable TV / DTH shall be provided in the Living and Master Bed room.

    PAINT FINISHES

    • Premium emulsion paint shall be applied for the ceiling and interior walls of the apartments excluding Utility and Services.
    • Internal Walls: Acrylic / cement based Putty with Premium emulsion paint.
    • External Walls: Weather shield exterior grade emulsion / texture paint.

    ELEVATOR/S

    • Elevators: High Speed lift shall be provided as per the Govt. norms in each core with automatic doors & SS brush finish of KONE / SCHINDLER / MITSUBISHI. ARD (Automatic Rescue Device) shall be installed in the passenger lift as a premium feature.

    AIR CONDITIONING

    • Provision for Air-Conditioning in Living, Dining and all bed rooms.

    HOME AUTOMATION

    • Multi level security systems for common areas and lobbies, Access control entry to the common entrance /foyers and gymnasium.
    • Light motion sensors for selected common areas.
    • Home security monitoring, gas leakage detectors, emergency panic intrusion alarm, visitor tracking.

    LANDSCAPING

    • Provision for sprinklers and a drip system shall be provided for necessary common area landscaping. Interlock Pavers to be laid in driveways and walkways. Hard and soft landscaping shall be provided as per the landscape consultant’s design.

    Description / Stage of Construction Collection (%)
    At the time of Agreement 30%
    On Completion of Piling works 5%
    On Completion of Pile cap and Beams 5%
    On Completion of Ground Floor Roof Slab 5%
    On Completion of 2nd Floor Roof Slab 5%
    On Completion of 4th Floor Roof Slab 5%
    On Completion of 6th Floor Roof Slab 5%
    On Completion of 8th Floor Roof Slab 5%
    On Completion of 10th Floor Roof Slab 5%
    On Completion of 12th Floor Roof Slab 5%
    On Completion of 15th Floor Roof Slab 5%
    On Completion of Entire Structure 5%
    On Completion of internal Plastering of respective apartment 5%
    On Completion of external Plastering 5%
    On Completion of Internal painting 2%
    On Completion of flooring of respective apartment 2%
    On Handing Over of apartment 10/0 1%
    Total 100%

    ranite / vitrified tiles, as per the architect’s design.

  • Staircases using granite / vitrified tile flooring with hand railing using matt finished SS / MS with or without toughened glass as per architect’s design.
  • Car Park Area: Grano flooring with grooves or exterior grade paving tiles.
  • Foyer / Living / Dining using 80cm X 80cm Premium Double charged vitrified tiles. [Kajaria / Asian or equivalent).
  • Kitchen: 60cm X 60cm premium double charged Vitrified tiles for the flooring (Kajaria/ Asian or equivalent)
  • Master Bed Room: Laminated wooden flooring AC4 Grade. All other bed rooms 60cmx60cm Premium Double Charged Vitrified tiles.
  • All Bed room Toilets: Designer ceramic tile concepts 30cm X 30cm for floor and 60cm X 30cm for walls up to ceiling height of 8’ 0.
  • Servants Toilet : Ceramic tile 30cm X 30cm for floor and 30cm X 45cm for walls upto 8’0” height.
  • Utility Room: 30cm X 30cm for floor and 30cm X 45cm for (kitchen wall) walls upto 4’6” height and 2’ above the counter if any. (using any premium Indian brands).
  • Balconies / Open Terraces / Decks : Rustic / antiskid / ceramic tiles 30cm X 30cm or (wood finished vitrified tiles) with MS / SS / Toughened Glass railings upto 1.2M heights. (using any premium Indian brands)
Sanitary & Plumbing
  • Sanitary fittings: will be of KOHLER, ROCCA or equivalent.
  • All Sanitary wares shall be of white colour only.
  • Concealed cisterns (concealed flushing system) will be of GEBERIT from Switzerland or GROHE from Germany or equivalent make. Actuator plates shall be in CP Finish dual flushing system
  • Faucets: for all the bed room toilets will be single lever concealed diverters CP finish, heavy body metal fittings of ROCA from Spain or GROHE from Germany or equivalent make.
  • Provision for hot water connection shall be provided for overhead shower (30cm X 30cm over head rain shower for master bed toilet and multi function over head shower in other toilets, normal shower for servant toilet).
  • Wall mounted single lever faucet make ROCA from Spain or GROHE from Germany will be provided for the wash basins, Kitchen and utility area sink.
  • Plumbing: All water supply lines shall be in ISI marked CPVC pipes. Drainage lines and storm water drain pipes shall be in PVC, Cockroach traps make CHILLI shall be provided as gratings for all necessary locations, Health Faucet ROCA from Spain or GROHE from Germany shall be provided near EWC in all the toilets.
  • Stainless Steel Sink multi bowl with drain board of make NIRALI / FRANKE or equivalent make shall be provided for the kitchen and stainless steel sink without drain board shall be provided for the utility areas
  • Towel rods, towel ring, soap dish shall be provided inside the toilets.
Doors & Windows
  • Window shutters: Prefabricated colour Anodised aluminum sliding shutters .One pane of Insect screen also shall be provided in each window.
  • Door Frames: Main door frame and shutter shall be of seasoned teak wood. Outer and Inner face to be PU coated and finished as per the Architects design.
  • Door Shutters: All internal door frames shall be of seasoned hard wood with flush door shutters. All internal and external faces shall be melamine finish or Paint finish as per the Architects design.
  • Hardware: All hardware shall be in C.P Brass, tower bolts, doorstoppers, ball bearing hinges. Locks shall be mortise of DORSET / YALE make from USA or equivalent.
  • Entrance door shall have hardware such as, Magic Eye, Safety Chain, Door Stopper and a BIO Metric lock from SAMSUNG or equivalent.
Electrical
  • Concealed copper wiring using FINOLEX / V-GUARD / HAVELLS make cables with modular plate switches, centralized cabling system for all electrical and communication requirements.
  • Wiring shall be done for lighting, 5Amps, 15 Amps and AC points in the Apartment.
  • Switches: All switches shall be LEGRAND – ARTEOR make or equivalent.
  • Generator: Power backup will be provided for all common services and selected light and fan point in each living, bedrooms inside apartment and a refrigerator point, plus additional one 5Amp plug point in the Kitchen, one light point in all the toilets, one 5Amp plug point at Living for emergency charging of devices shall be provided (Air-conditioning and Geyser points and other 15Amp points will not be considered for the power back up).
  • Exhaust Fan in toilets.
  • Light fixtures for the Common areas, external areas, apartment balconies and at entrance door of the individual apartments shall be provided.
  • All light fixtures shall be of PHILIPS / HAVELLS or equivalent.
  • Adequate ELCB and MCB shall be provided in each apartments SIEMENS /HAVELLS or equivalent.
  • Provision for the GEYSER points and fresh air fans shall be provided for all toilets.
  • Provision for telephone and Internet shall be provided in the living room and master bed room.
  • Provision for Cable TV / DTH shall be provided in the Living and Master Bed room.
Paint Finishes
  • Premium emulsion paint shall be applied for the ceiling and interior walls of the apartments excluding Utility and Services.
  • Internal Walls: Acrylic / cement based Putty with Premium emulsion paint.
  • External Walls: Weather shield exterior grade emulsion / texture paint.
Elevator/s
  • Elevators: High Speed lift shall be provided as per the Govt. norms in each core with automatic doors & SS brush finish of KONE / SCHINDLER or reputed make.
  • ARD (Automatic Rescue Device) shall be installed in the passenger lift as a premium feature.
Air Conditioning
  • Ductable Air-Conditioning in Living/Dining room.
  • Split Air -Conditioning for Bedrooms
Home Automation
  • Multi level security systems for common areas and lobbies, Access control entry to the
    common entrance / foyers and gymnasium
  • Light motion sensors for selected common areas
  • Home security monitoring, gas leakage detectors, emergency panic intrusion alarm,
    visitor tracking
Landscaping
  • Provision for sprinklers and a drip system shall be provided for necessary common area landscaping.
  • Interlock Pavers to be laid in driveways and walkways.
  • Hard and soft landscaping shall be provided as per the landscape consultant’s design.

Disclaimer: Artech Realtors PVT LTD, reserves the right to change / alter /delete the brands specified above, subject to its availability to an equivalent and competitive product.

Flats for Sale in Thiruvalla

Embark on a journey to find your ideal home with an exquisite range of flats for sale in Thiruvalla. Whether you are a first-time homebuyer or looking to upgrade, explore the diverse options to buy flats in Thiruvalla. The real estate market in this vibrant and charming city presents an array of choices, including 2 & 3 BHK apartments that cater to varying family sizes and lifestyles.

Discover the allure of luxury apartments in Thiruvalla, where contemporary architecture meets premium amenities. Elevate your lifestyle with spacious interiors, modern facilities, and a location that reflects convenience and connectivity. These thoughtfully-designed flats offer a perfect fusion of functionality and aesthetics, ensuring harmonious living experiences in choice locations. Navigate through the options available and choose a piece of this thriving city for a home of your own.

Investing in 2 & 3 BHK flats in Thiruvalla not only secures a comfortable residence but also a promising future in this rapidly-expanding city. Artech Realtors have classy 2 and 3 BHK apartments in Thiruvalla called ‘Artech Kaazhcha’ where you can buy your dream home and embrace the joy of living amid a plethora of lifestyle amenities, elderly friendly facilities and futuristic automated security features.

RELATED PROJECTS

DISCLAIMER

The information provided on this website is meant for general guidance. Though we have taken utmost care on the accuracy of the contents, the customer should make an autonomous assessment of the contents. However, the prospective buyers should rely upon the terms and conditions of the sale and construction agreement between the Builder and the Client.

The visuals of the projects symbolize artistic impression only. The information contained herein including the fittings, finishes, features, floor size and color etc. in the visuals are subject to change. However, the plans & specifications indicated in the Builder and Client agreements are final and we have not authorized anyone to make any oral commitments or promises on our behalf in regard to the plans and specifications of the apartments/projects.

For any clarification please feel free to call +91 9847 600 600 or walk into our offices. Our representatives will always be at your service.