Artech World Mall

Project Description

Welcome to a brand new shopping experience in Trivandrum

Shop to your heart’s content at Artech World Mall, the latest shopping destination in Trivandrum. Situated at Pattor, the Artech World Mall is one of the most happening shopping destinations. Also known as the Central Mall, it features trendy collections in apparel, sportswear, bags, and footwear. International and domestic brands – including big names like Park Avenue, Lavie, Adidas, Puma, Levi’s and Lee Cooper have outlets here.
Needless to say, the shopping experience will be very unique.

The Trivandrum Central Mall is close to the central business district. It is around 3 km from Airport and about 4 km from the Trivandrum Central railway station. This makes the Trivandrum Central Mall easily accessible from all parts of the town. The Trivandrum Central Mall at Pattoor fills the big void in having a mall close to the city.

The Basement + 4 upper floors offer the best of shopping and entertainment options. Relax in one of those many lounge chairs strewn around the mall and take in the views of the city from a vantage viewpoint when you are tired of shopping.

Trivandrum Central Mall is the second mall to open up in Trivandrum in 2018. Carnival Cinemas have agreed to setting up a cinema theatre in the Trivandrum Central mall soon.

Come, shop till you drop at Artech World Mall.

Quick Enquire

Take your first few steps towards finding the ultimate happiness of the Perfect Home.


Progress

Work status as on 9-8-2017, we have completed the following.

  • RCC for Pile cap & Grade beam – completed
  • RCC for Structure – Terrace floor – completed
  • Block Masonry – progressing
  • Wall plastering work – progressing
  • Outside plastering work – BF to Terrace – 98% completed
  • Inside Painting – progressing
  • Outside painting work – progressing

Work status as on 5-7-2017, we have completed the following.

  • Earthwork Excavations – completed
  • RCC for Pile cap & Grade beam – completed
  • RCC for Structure – Terrace floor – progressing
  • Wall plastering work – progressing
  • Outside plastering work – progressing
  • Outside painting work – progressing

Work status as on 9-5-2017, we have completed.

  • Earthwork Excavations – completed
  • RCC for Pile cap & Grade beam – completed
  • Block Masonry – progressing
  • Wall plastering work – progressing
  • Outside plastering work – progressing
  • Outside painting work -progressing