ArtechVarsha

Project Description

Inspired by the concept of “Affordable Luxury”, Artech Varsha apartments exude pure sophistication, heightened style and practical luxury. With its immaculate planning, well developed green vistas, spacious indoor and outdoor spaces and best quality finish, Artech Varsha offers 1,2 & 3 BHK apartment options. Located at a prime spot in Nalanchira, Trivandrum, Artech Varsha is conveniently located near multiple educational institutions, hospitals, shopping malls. The state of the art amenities offered in Artech Varsha includes a Swimming Pool, Air-conditioned Unisex Gym, Indoor Games among others.

Quick Enquire

Take your first few steps towards finding the ultimate happiness of the Perfect Home.


Location

Artech Varsha, Nalanchira - Location

Layout

Specification

Structure

Deep pile foundation complying with seismic 3 zone. RCC frame structure with brickwork and / or concrete block partitions. (All plumbing services passing through the walls are solid block). Concrete grades and Steel grades as per the Structural Consultant’s advice.

Flooring & Tiling

Lift lobby and fascia wall & floor using composite marble / vitrified Tiles, as per the architect’s design. Staircases using vitrified tile flooring with hand railing using paint finished MS. Car park Area: Grano flooring with grooves or exterior grade paving tiles. Foyer / Living / Dining / Bed Rooms / Kitchen using 60cm X 60cm Vitrified tiles. Toilets: Ceramic tile concepts 30cm X 30cm for floor and 30cm X 45cm for walls up to height of 8’ 0”(master toilet). Servants Toilet: Ceramic tile 30cm X 30cm for floor and 30cm X 45cm for walls upto 8’0” height. Utility Room: 30cm X 30cm for floor and 30cm X 45cm for walls upto 4’6” height and 2’ above the counter if any. Balconies / Open Terraces / Decks: Rustic / antiskid / ceramic tiles 30cm X 30cm with MS railings.

Sanitary & Plumbing

Sanitary fittings: EWC wall-hung, concealed cisterns GEBRIT / GROHE make, counter washbasin. All sanitary fittings shall be of Roca / American Standard or equivalent. Master Bed Room Faucets: Shall be single lever concealed diverters CP finish, heavy body metal fittings of Grohe / Roca or equivalent make. Provision for hot water connection shall be provided for overhead shower in each bathroom. Health faucet also shall be provided. Other Toilets: Shall be 3 in 1 mixer CP finish, Over head shower, health faucet by Jaquar or equivalent. Plumbing: All water supply lines shall be in ISI marked CPVC pipes. Drainage lines and storm water drain pipes shall be in PVC. Kitchen & Service area: Wall mounted Faucets / taps using JAQUAR or equivalent shall be provided. Stainless Steel Sink single bowl with drain board of NIRALI make or equivalent shall be provided for the kitchen and stainless steel sink without drain board shall be provided for the utility and service areas. Towel rods, towel ring, soap dish and health faucets shall be provided inside the toilets.

Doors & Windows

Window shutters: Prefabricated, colour anodised aluminum / UPVC. Door Frames: Main door frame and shutters shall be of seasoned teak wood. Outer face to be PU coated and Inner face melamine finished. Door Shutters: All internal door frames shall be of seasoned teak wood / hard wood with flush door shutters. All internal and external faces shall be with melamine finish. Hardware: All hardware shall be in C.P Brass, tower bolts, doorstoppers, ball bearing hinges. Locks shall be mortise of Dorset /Yale make or equivalent.

Electrical

Concealed copper wiring using Finolex or equivalent make with modular plate switches, centralized cabling system for all electrical and communication requirements. Wiring shall be done for lighting, 5Amps, 15 Amps and AC points in the Apartment. Switches: All switches shall be Honeywell / Legrand / Schneider /Crabtree or equivalent make. Generator: Power back – up will be provided for all common services and selected light and fan points in each living, bedrooms inside apartment and a refrigerator point except Air-conditioning and Geyser points. Light fixtures for the Common areas, external areas, apartment balconies and at entrance door of the individual apartments shall be provided. Adequate ELCB and MCB shall be provided in each apartments. Provision for the GEYSER points and fresh air fans shall be provided for all toilets. Provision for telephone and Internet shall be provided in the living room and master bed room.

Ceiling Treatment

OBD paint shall be applied in the common areas, utility, service areas. Emulsion paint shall be applied for the ceiling in apartments excluding Utility and Services.

Wall treatment

Internal Walls: Acrylic / cement based Putty with emulsion paint. Service area – Oil bound / acrylic distemper. External Walls: Weather shield exterior grade emulsion / texture paint.

Elevator/s

High Speed lifts shall be provided as per the Govt. norms in each core with automatic doors & SS brush finish of KONE or reputed make.

Air Conditioning

Provision for Split ACs, shall be provided for the Master Bed.

Home Automation

Access control entry to the common entrance / foyers and gymnasium. Light sensors for common areas. Home security monitoring, gas leakage detectors, emergency panic intrusion alarm, visitor tracking. Multi level security system for common areas and lobbies.

Landscaping

Terrace gardens and well designed Landscape area. Interlock Pavers to be laid in driveways and walkways. Water bodies and fountains shall be provided as per the architect’s design.

 

Amenities

  • Children’s Play Area
  • Multi Purpose Hall
  • Indoor Games
  • Swimming Pool
  • Plush Entrance Lobbies & Lounge
  • Fully Equipped Air-conditioned Unisex Gym
  • Open deck landscaped party area at terrace level
  • Reticulated LPG Supply
  • Video Door Phone
  • Garbage Management Systems
  • Visitors Car Parking
  • DTH / Cable TV provision for Living and Master Bed Room
  • Common Toilets
  • Landscaped Area

Progress

Work status as on 5-7-2017, we have completed

A – BLOCK

  • RCC for Structure – completed
  • Ceiling Plastering work – completed
  • Block/Brick masonry work – completed
  • Wall plastering inside – completed
  • Wire pulling -progressing-
  • External plastering work – progressing

B – BLOCK

  • RCC for Structure – completed
  • Ceiling Plastering work – completed
  • Block/Brick masonry work – completed
  • Wall plastering inside – completed
  • Wire pulling – completed
  • Plumbing work – completed
  • External plastering work – completed
  • Flooring – completed

C – BLOCK

  • RCC for Structure – completed
  • Ceiling Plastering work – completed
  • Block/Brick masonry work – completed
  • Electrical rope pulling work – completed
  • Wall plastering – completed

Work status as on 9-6-2017, we have completed

A – BLOCK

  • RCC for Structure – completed
  • Ceiling Plastering work – completed
  • Block/Brick masonry work – completed
  • Wall plastering inside – completed
  • Plumbing work – progressing

B – BLOCK

  • RCC for Structure – completed
  • Ceiling Plastering work – completed
  • Block/Brick masonry work – completed
  • Wall plastering inside – completed
  • External plastering work – completed
  • Flooring – completed

C – BLOCK

  • RCC for Structure – completed
  • Ceiling Plastering work – completed
  • Block/Brick masonry work – completed
  • Electrical rope pulling work – completed
  • Wall plastering – completed

Work status as on 9-5-2017, we have completed

A – BLOCK

  • RCC for Structure – completed
  • Ceiling Plastering work – completed
  • Block/Brick masonry work – completed
  • Wall plastering inside – completed
  • Flooring and skirting – progressing
  • External plastering work – progressing

B – BLOCK

  • RCC for Structure – completed
  • Ceiling Plastering work – completed
  • Block/Brick masonry work – completed
  • Wall plastering inside – completed
  • Plumbing work – progressing
  • External plastering work – completed

C – BLOCK

  • RCC for Structure – completed
  • Ceiling Plastering work – completed
  • Block/Brick masonry work – completed
  • 1st coat painting work – progressing
  • External painting work – progressing
  • Wall plastering – completed

Work status as on 8-3-2017, we have completed

A – BLOCK

  • RCC for Structure – 100% completed
  • Ceiling Plastering work – 100% completed
  • Block/Brick masonry work – 100% completed
  • Wall plastering inside – 100% completed

B – BLOCK

  • RCC for Structure – 100% completed
  • Ceiling Plastering work – 100% completed
  • Block/Brick masonry work – 100% completed
  • Wall plastering inside – 100% completed
  • External plastering work – 100% completed
  • Flooring – 1st floor to terrace floor – 100% completed

C – BLOCK

  • RCC for Structure – 100% completed
  • Ceiling Plastering work – 100% completed
  • Block/Brick masonry work – 100% completed
  • Electrical rope pulling work – 100% completed
  • Wall plastering – 100% completed

Work status as on 8-2-2017, we have completed

A – BLOCK

  • RCC for Structure – completed
  • Ceiling Plastering work – completed
  • Block/Brick masonry work – completed
  • Wall plastering inside – completed
  • External plastering work – progressing

B – BLOCK

  • RCC for Structure – completed
  • Ceiling Plastering work – completed
  • Block/Brick masonry work – completed
  • Wall plastering inside – completed
  • Plumbing work – progressing
  • External plastering work – completed
  • Flooring – 1st floor to terrace floor – 100% completed

C – BLOCK

  • RCC for Structure – 100% completed
  • Ceiling Plastering work – 100% completed
  • Block/Brick masonry work – 100% completed
  • Putty work outside – progressing
  • Wall plastering – completed

Work status as on 06-5-2016, we have completed

A-Block

  • RCC for Structure – completed
  • External plastering work – 12th & 13th floor completed

B-Block

  • RCC for Structure – completed
  • External plastering work – completed

Current work progress at our site Artech “Varsha” Nalanchira, Trivandrum as on 23rd July 2015

B-Block

  • Ceiling plastering work – completed
  • Block work – completed
  • Inside Wall plastering – completed
  • Outside plastering work- 50% completed
  • Putty work, water proofing work, Hand rail work (Balcony and Stair) -progressing

A-Block

  • Slab RCC work –Roof slab work of 5th floor completed and roof slab work of 6th floor progressing
  • Ceiling plastering work- 4th floor progressing
  • Block work – 2nd floor progressing

Mock Apartments

Hand Over