ArtechL’attitude

2 BHK Flats in Trivandrum , 3 BHK Flats in Trivandrum , Builders in Trivandrum , Luxury apartments in trivandrum , Ongoing , Trivandrum
Sreekaryam | Trivandrum

RERA Number: K‐RERA/PRJ/TVM/123/2023
rera.kerala.gov.in

}

Project Description

Welcome to Artech L’attitude, where luxurious living reaches new heights. Nestled in the serene locality of Sreekaryam, Trivandrum, this residential apartment offers 2, 2+Study and 3 BHK holistic luxury lifestyle. Discover an abode of refined elegance and modern comforts, meticulously designed to enrich your everyday experience. With attention to detail and a focus on creating a holistic living experience, Artech L’attitude provides a home where luxury and convenience converge. Enjoy breathtaking views, top-of-the-line amenities, and a prime location that caters to your every need. Experience Artech L’attitude, your high-rise way of life in Sreekaryam, Trivandrum.

QUICK
ENQUIRE

Take your first few steps towards finding the ultimate happiness of the Perfect Home.
  • Air-conditioned Gym for Gents
  • Air-conditioned Gym for Ladies
  • Swimming Pool & Kids Pool
  • AV Room
  • Indoor Games Room/Activity Zone
  • Creche
  • Tuition Centre
  • Work Station/Business Centre
  • Library
  • Refreshment Area
  • Guest Suite
  • Drivers Dormitory
  • Provision for Steam Bath
  • Massage room for Gents
  • Massage room for Ladies
  • Badminton Court/ Multi-purpose Court
  • Cricket Nets
  • Children’s Play Area
  • Electric Charging Station
  • Car wash area
  • Reticulated LPG supply
  • Club Lounge / Association Hall
  • Solar Powered Lighting For Common area
  • Boom Barrier
  • CCTV surveillance

Are you on the lookout for a home loan? We can help you. We have tie-ups with prominent banks for this project. It will help you make the loan application process easier.

  • IOB
  • SOUTH INDIAN BANK
  • BANK OF BARODA
  • ICICI
  • FEDERAL BANK
  • SBI

Work status as on 08-11-2024, we have completed the following.

  • Sub Structural Works – Sub structural works – Pile concretingcompleted Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 100m3 completed, Raft slab RCC – 129 m3 completed, Plinth beam RCC – 15m3 completed,Column 10 nos completed(part 2) Sump tank base slab RCC completed, Sump tank wall upto 2.3m RCC completed, Retaining wall rear side 60% completed, sheet piling completed ,LGF2 FLOORSLAB AND RAMP- 130m3 ,Grade Slab work -130 m3 completed Tower1: Excavation-200cum,excavation- 200cum pcc-40 cum,pilecap-120 cum,plinth beam&grade slab-80cum,Basement columns-70 cum,LGF2 floor slab-125 cum,LGF2 Columns-100 cum,LGF1 floor slab-220 cum,STP WALL CONCRETE=40 CUM,LIFT PILE CAP& FOOTINGS=30 CUM,PCC= 6 CUM,ROCK BREAKING = 25 CUM,COLUMN CONCRETE =18cum
    Tower 02 Excavation- 500cum,PCC-40 cum,Pilecap-170 cum,Plinth beam&grade slab-80cum,GRADE SLAB =50 CUM,PCC = 10 CUM,PILE CAP =30 CUM,PILE CHIPPING = 38 RM,COLUMN CONCRETE= 7 CUM

As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2024.

  • Sub Structural Works – L1 slab,L2 Slab and Column to be completed,STP wall casting, Part 2 lift wall casting,Part 4,1 lift area waterproofing

Work status as on 14-10-2024, we have completed the following.

  • Sub Structural Works – Sub structural works – Pile concretingcompleted Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 100m3 completed, Raft slab RCC – 129 m3 completed, Plinth beam RCC – 15m3 completed,Column 10 nos completed(part 2) Sump tank base slab RCC completed, Sump tank wall upto 2.3m RCC completed, Retaining wall rear side 60% completed, sheet piling completed ,LGF2 FLOORSLAB AND RAMP- 130m3 ,Grade Slab work -130 m3 completed Tower1: Excavation-200cum,excavation- 200cum pcc-40 cum,pilecap-120 cum,plinth beam&grade slab-80cum,Basement columns-70 cum,LGF2 floor slab-125 CUM,LGF2 Columns-100 cum, Tower 02 Excavation- 500cum,PCC-40 cum,Pilecap-170 cum,Plinth beam&grade slab-80cum

As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2024.

  • L1 slab,L2 Slab and Column to be completed,STP wall casting, Part 2 lift wall casting,Part 4,1 lift area waterproofing

Work status as on 12-09-2024, we have completed the following.

  • Sub Structural Works – Pile concretingcompleted Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 100m3 completed, Raft slab RCC – 129 m3 completed, Plinth beam RCC – 15m3 completed,Column 10 nos completed(part 2) Sump tank base slab RCC completed, Sump tank wall upto 2.3m RCC completed, Retaining wall rear side 60% completed, sheet piling completed ,LGF2 FLOORSLAB AND RAMP- 130m3 ,Grade Slab work -130 m3 completed

Work status as on 13-08-2024, we have completed the following.

  • Sub Structural Works – Pile concretingcompleted Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 100m3 completed, Raft slab RCC – 129 m3 completed, Plinth beam RCC – 80m3 completed,Column 10 nos completed(part 2) sump tank base slab RCC completed, sump tank wall upto 2.3m RCC completed, Retaining wall rear side of house 60% completed, sheet piling completed

Work status as on 09-07-2024, we have completed the following.

  • Sub Structural Works – Sub structural works – Pile concreting 460 nos: completed out of 495 nos:, Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 100m3 completed, Raft slab RCC – 30m3 completed, Plinth beam RCC – 5m3 completed, sump tank base slab RCC completed, sump tank wall upto 2.3m RCC completed, Retaining wall rear side of house 60% completed, sheet piling completed

Work status as on 11-06-2024, we have completed the following.

  • Sub Structural Works – S Sub structural works – Pile concreting 459 nos: completed out of 495 nos:, Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 85m3 completed, sump tank base slab RCC completed, sump tank wall upto 2.3m RCC completed, Retaining wall rear side of house 60% completed, sheet piling completed

As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2024.

  • Sub Structural Works- pile concreting 95% to be completed

Work status as on 09-05-2024, we have completed the following.

  • Sub Structural Works – Sub structural works – Pile concreting 459 nos: completed out of 495 nos:, Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 85m3 completed, sump tank base slab RCC completed, sump tank wall upto 2.3m RCC completed, Retaining wall rear side of house 60% completed, sheet piling completed

As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2024.

    • Sub Structural Works-pile concreting 95% to be completed

Work status as on 09-04-2024, we have completed the following.

      • Sub Structural Works Sub structural works – Pile concreting 435 nos: completed out of 495 nos:, Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 85m3 completed, sump tank base slab RCC completed, sump tank wall upto 2.3m RCC completed

Work status as on 09-03-2024, we have completed the following.

      • Sub Structural Works Sub structural works – Pile concreting 367 nos: completed out of 495 nos:, Pile chipping – 19nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 30m3 completed, sump tank base slab RCC completed

Work status as on 10-02-2024, we have completed the following.

      • Sub structural works – Pile concreting 300 nos: completed out of 495 nos:, Pile chipping started, excavation for pilecap (10 Nos:) completed

Work status as on 13-01-2024, we have completed the following.

      • Sub Structural Works – Sub structural works – Pile concreting 221 nos: completed out of 495 nos:

As per the current work status from our site, we are targeted to complete the following works by the end of JANUARY 2024.

      • Sub Structural Works – 70 more nos: of pile concreting to be completed, retaining wall 75% to be completed

Work status as on 08-12-2023, we have completed the following.

      • Sub Structural Works – Sub structural works – Pile concreting 162 nos: completed out of 495 nos:

As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2023.

      • Sub Structural Works – 75 more nos: of pile concreting to be completed, retaining wall 75% to be completed

We are pleased to inform you the current work progress at our site Artech “L’Attitude”, Sreekaryam, Few snaps of the work progress is attached for your reference.

  • Air-conditioned Gym for Gents
  • Air-conditioned Gym for Ladies
  • Swimming Pool & Kids Pool
  • AV Room
  • Indoor Games Room/Activity Zone
  • Creche
  • Tuition Centre
  • Work Station/Business Centre
  • Library
  • Refreshment Area
  • Guest Suite
  • Drivers Dormitory
  • Provision for Steam Bath
  • Massage room for Gents
  • Massage room for Ladies
  • Badminton Court/ Multi-purpose Court
  • Cricket Nets

  • Children’s Play Area
  • Electric Charging Station
  • Car wash area
  • Reticulated LPG supply
  • Club Lounge / Association Hall
  • Solar Powered Lighting For Common area
  • Boom Barrier
  • CCTV surveillance

Are you on the lookout for a home loan? We can help you. We have tie-ups with prominent banks for this project. It will help you make the loan application process easier.

  • IOB
  • SOUTH INDIAN BANK
  • BANK OF BARODA
  • ICICI
  • FEDERAL BANK
  • SBI

Work status as on 08-11-2024, we have completed the following.

  • Sub Structural Works – Sub structural works – Pile concretingcompleted Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 100m3 completed, Raft slab RCC – 129 m3 completed, Plinth beam RCC – 15m3 completed,Column 10 nos completed(part 2) Sump tank base slab RCC completed, Sump tank wall upto 2.3m RCC completed, Retaining wall rear side 60% completed, sheet piling completed ,LGF2 FLOORSLAB AND RAMP- 130m3 ,Grade Slab work -130 m3 completed Tower1: Excavation-200cum,excavation- 200cum pcc-40 cum,pilecap-120 cum,plinth beam&grade slab-80cum,Basement columns-70 cum,LGF2 floor slab-125 cum,LGF2 Columns-100 cum,LGF1 floor slab-220 cum,STP WALL CONCRETE=40 CUM,LIFT PILE CAP& FOOTINGS=30 CUM,PCC= 6 CUM,ROCK BREAKING = 25 CUM,COLUMN CONCRETE =18cum
    Tower 02 Excavation- 500cum,PCC-40 cum,Pilecap-170 cum,Plinth beam&grade slab-80cum,GRADE SLAB =50 CUM,PCC = 10 CUM,PILE CAP =30 CUM,PILE CHIPPING = 38 RM,COLUMN CONCRETE= 7 CUM

As per the current work status from our site, we are targeted to complete the following works by the end of NOVEMBER 2024.

  • Sub Structural Works – L1 slab,L2 Slab and Column to be completed,STP wall casting, Part 2 lift wall casting,Part 4,1 lift area waterproofing

Work status as on 14-10-2024, we have completed the following.

  • Sub Structural Works – Sub structural works – Pile concretingcompleted Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 100m3 completed, Raft slab RCC – 129 m3 completed, Plinth beam RCC – 15m3 completed,Column 10 nos completed(part 2) Sump tank base slab RCC completed, Sump tank wall upto 2.3m RCC completed, Retaining wall rear side 60% completed, sheet piling completed ,LGF2 FLOORSLAB AND RAMP- 130m3 ,Grade Slab work -130 m3 completed Tower1: Excavation-200cum,excavation- 200cum pcc-40 cum,pilecap-120 cum,plinth beam&grade slab-80cum,Basement columns-70 cum,LGF2 floor slab-125 CUM,LGF2 Columns-100 cum, Tower 02 Excavation- 500cum,PCC-40 cum,Pilecap-170 cum,Plinth beam&grade slab-80cum

As per the current work status from our site, we are targeted to complete the following works by the end of OCTOBER 2024.

  • L1 slab,L2 Slab and Column to be completed,STP wall casting, Part 2 lift wall casting,Part 4,1 lift area waterproofing

Work status as on 12-09-2024, we have completed the following.

  • Sub Structural Works – Pile concretingcompleted Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 100m3 completed, Raft slab RCC – 129 m3 completed, Plinth beam RCC – 15m3 completed,Column 10 nos completed(part 2) Sump tank base slab RCC completed, Sump tank wall upto 2.3m RCC completed, Retaining wall rear side 60% completed, sheet piling completed ,LGF2 FLOORSLAB AND RAMP- 130m3 ,Grade Slab work -130 m3 completed

Work status as on 13-08-2024, we have completed the following.

  • Sub Structural Works – Pile concretingcompleted Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 100m3 completed, Raft slab RCC – 129 m3 completed, Plinth beam RCC – 80m3 completed,Column 10 nos completed(part 2) sump tank base slab RCC completed, sump tank wall upto 2.3m RCC completed, Retaining wall rear side of house 60% completed, sheet piling completed

Work status as on 09-07-2024, we have completed the following.

  • Sub Structural Works – Sub structural works – Pile concreting 460 nos: completed out of 495 nos:, Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 100m3 completed, Raft slab RCC – 30m3 completed, Plinth beam RCC – 5m3 completed, sump tank base slab RCC completed, sump tank wall upto 2.3m RCC completed, Retaining wall rear side of house 60% completed, sheet piling completed

Work status as on 11-06-2024, we have completed the following.

  • Sub Structural Works – S Sub structural works – Pile concreting 459 nos: completed out of 495 nos:, Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 85m3 completed, sump tank base slab RCC completed, sump tank wall upto 2.3m RCC completed, Retaining wall rear side of house 60% completed, sheet piling completed

As per the current work status from our site, we are targeted to complete the following works by the end of JUNE 2024.

  • Sub Structural Works- pile concreting 95% to be completed

Work status as on 09-05-2024, we have completed the following.

  • Sub Structural Works – Sub structural works – Pile concreting 459 nos: completed out of 495 nos:, Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 85m3 completed, sump tank base slab RCC completed, sump tank wall upto 2.3m RCC completed, Retaining wall rear side of house 60% completed, sheet piling completed

As per the current work status from our site, we are targeted to complete the following works by the end of MAY 2024.

    • Sub Structural Works-pile concreting 95% to be completed

Work status as on 09-04-2024, we have completed the following.

      • Sub Structural Works Sub structural works – Pile concreting 435 nos: completed out of 495 nos:, Pile chipping – 70 nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 85m3 completed, sump tank base slab RCC completed, sump tank wall upto 2.3m RCC completed

Work status as on 09-03-2024, we have completed the following.

      • Sub Structural Works Sub structural works – Pile concreting 367 nos: completed out of 495 nos:, Pile chipping – 19nos: completed, excavation for pilecap (10 Nos:) completed, pile cap RCC – 30m3 completed, sump tank base slab RCC completed

Work status as on 10-02-2024, we have completed the following.

      • Sub structural works – Pile concreting 300 nos: completed out of 495 nos:, Pile chipping started, excavation for pilecap (10 Nos:) completed

Work status as on 13-01-2024, we have completed the following.

      • Sub Structural Works – Sub structural works – Pile concreting 221 nos: completed out of 495 nos:

As per the current work status from our site, we are targeted to complete the following works by the end of JANUARY 2024.

      • Sub Structural Works – 70 more nos: of pile concreting to be completed, retaining wall 75% to be completed

Work status as on 08-12-2023, we have completed the following.

      • Sub Structural Works – Sub structural works – Pile concreting 162 nos: completed out of 495 nos:

As per the current work status from our site, we are targeted to complete the following works by the end of DECEMBER 2023.

      • Sub Structural Works – 75 more nos: of pile concreting to be completed, retaining wall 75% to be completed

We are pleased to inform you the current work progress at our site Artech “L’Attitude”, Sreekaryam, Few snaps of the work progress is attached for your reference.

Luxury Flats in Sreekaryam, Trivandrum

For those looking for peaceful neighborhoods to buy homes in Trivandrum, check out Artech L’attitude, luxurious apartments in Sreekaryam that enrich your everyday life with their refined elegance and modern comfort. These 2 and 3 BHK luxury apartments in Sreekaryam are in a well-connected area with easy access to important social infrastructure, the NH66, Technopark as well as numerous prestigious educational intuitions. For those who love the verdant greenery of Mother Nature, Sreekaryam also offers a number of green open spaces and gardens to feast your city-bred eyes.

And for those looking for luxury flats for sale in Sreekaryam, you couldn’t be making a better choice than going with Artech L’attitude, homes where you get to enjoy breathtaking views, value-added facilities and top-of-the-line amenities! Homes where you have outstanding amenities like separate massage centers for gents and ladies, separate air-conditioned gyms for gents and ladies, tuition center, business center, creche, library, etc. Luxury living surely couldn’t get better than this, at Artech L’attitude in Sreekaryam!

These premium flats in Trivandrum are meticulously designed to enhance your living experiences and bring the future into the present, like no other. Homebuyers also get additional options here as the apartments offered include 2, 2+study and 3 BHK, making them ideal for those who work from home, or for students who need their own secluded reading space. Designed with attention to every little detail, these modern flats/apartments for sale in Sreekaryam are bound to satisfy even the most discerning of homebuyers, as everything here represents grandeur and luxury.

DISCLAIMER

The information provided on this website is meant for general guidance. Though we have taken utmost care on the accuracy of the contents, the customer should make an autonomous assessment of the contents. However, the prospective buyers should rely upon the terms and conditions of the sale and construction agreement between the Builder and the Client.

The visuals of the projects symbolize artistic impression only. The information contained herein including the fittings, finishes, features, floor size and color etc. in the visuals are subject to change. However, the plans & specifications indicated in the Builder and Client agreements are final and we have not authorized anyone to make any oral commitments or promises on our behalf in regard to the plans and specifications of the apartments/projects.

For any clarification please feel free to call +91 9847 600 600 or walk into our offices. Our representatives will always be at your service.