ArtechVGP Sky Village

Project Description

VGP Sky Village, the latest luxury offering from Artech Realtors is located in one of Kollam’s most premium neighborhood, Uliyakovil Road. Unique design, new age living concepts and the spectacular lake & sea views makes VGP Sky Village a coveted address. Sky Village offers 2 & 3 BHK homes measuring 1200 sq. ft. to 2060 sq. ft. in 4 layout options. At every VGP Sky Village apartment, space & privacy are given the importance it deserves. With an Infinity Pool, terrace development, unisex gym, guest suites, and a host of exclusive features, VGP Sky Village is what you get when luxury is taken sky high.

Categories: , ,

Quick Enquire

Take your first few steps towards finding the ultimate happiness of the Perfect Home.


Location

Artech VGP Sky Village, Kollam - Location

Layout

Specification

Structure
  • Deep pile foundation complying with seismic 3 zone
  • RCC framed structure with brick work and or concrete block partitions.
  • (All plumbing services passes through the walls are solid block).
  • Concrete grade and Steel grade as per structural consultant’s advice.
Flooring & Tiling
  • Lift lobby and fascia wall & floor using Vitrified Tiles, as per the architect’s design
  • Staircases using vitrified tile flooring with hand railing using paint finished MS
  • Car park Area: Grano flooring with grooves or exterior grade paving tiles
  • Foyer/Living/Dining/Bed Rooms/Kitchen using 60cm x 60cm Vitrified tiles
  • Master Bed room using AC4 laminated wooden flooring
  • Toilets Ceramic tile concepts 30 cm x 30 cm for floor and 30 cm x 45 cm for walls upto height of 8′-0”
  • Servants Toilet: Ceramic tile 30 cm x 30 cm for floor and 30 cm x 45 cm for walls upto 8′-0” height
  • Utility Room: 30 cm x 30 cm / 60 cm x 60 cm for floor and 30 cm x 45 cm for walls upto 4′-6” height and 2′ above the kitchen and work area counter
  • Balconies / Open Terraces / Decks:Rustic / anti-skid / Ceramic tiles 30 cm x 30 cm with MS railings
Sanitary & Plumbing
  • Sanitary fitings: EWC wall-hung, concealed cisterns Geberit or equivalent make, counter washbasin. All sanitary fittings shall be of Roca / American Standard or equivalent
  • Master Bed Room Faucets: Shall be single lever concealed diverters CP finish, heavy body metal fittings of Jaquar / Roca or equivalent make.
  • Provision for hot water connection shall be provided for overhead shower in each bathroom. Health faucet also shall be provided
  • Other Toilets: Shall be 3 in 1 mixer CP finish, Over head shower, health faucet by Jaquar / Roca or equivalent
  • Plumbing: All water supply lines shall be in ISI marked CPVC pipes.
  • Drainage lines and storm water drain pipes shall be in PVC
    Kitchen & Service area: Wall mounted Faucets / taps using Jaquar or equilant shall be provided
  • Stainless Steel Sink single bowl with drain board of make Nirali or equivalent shall be provided for the kitchen and stainless steel sink without drain board shall be provided for the utility and service areas
    Towels rods, towel ring, soap dish and health faucets shall be provided inside the toilets
Doors & Windows
  • Window shutters: Prefabricated colour anodised aluminum
  • Door Frames: Main door frame and shutter shall be of seasoned teak wood.
  • Inner and Outer face to be PU coated and finished
  • Door Shutters: All internal door frames shall be of seasoned hard wood with flush / Masonite Skin door shutter. All internal and external faces shall be melamine finish
  • Hardware: All hardware shall be in C.P Brass, tower bolts, door stoppers, ball bearing hinges. Locks shall be mortise of Dorset / Yale make or equivalent
Electrical
  • Concealed copper wiring using Finolex or equivalent make with modular plate switches, centralized cabling system for all electrical and communication requirements
  • Wiring shall be done for lighting, 5 Amps, 15 Amps and AC points in the Apartment
  • Switches: All switches shall be Legrand / Schneider or equivalent make
    Generator: Power backups will be provided for all common services and selected light and fan point in each living, bedrooms inside apartment and the refridgerator point except Air-conditioning and Geyser points
    Light fixtures for the common areas, external areas, apartment balconies and at entrance door of the individual apartments shall be provided.
  • Adequate ELCB and MCB shall be provided in each apartments
  • Provision for the Geyser points and fresh atr fans shall be provided for all toilets
  • Provision for telephone and internet shall be provided in the living room and master bed room
Ceiling Treatment
  • Premium Emulsion paint shall be applied in the common areas, utility, service areas
  • Premium Emulsion paint shall be applied for ceiling in apartments
Wall Treatment
  • Internal Walls: Acrylic / Cement based putty with premium emulsion paint
    Service area: Premium Emulsion
  • External Walls: Weather shield / Equivalent exterior grade emulsion / texture paint
Elevator
  • Elevators: High Speed lift shall be provided as per the Govt. norms in each core with automatic doors & SS brush finish of KONE or reputed make
Air Conditioning
  • Provision for Split ACs, shall be provided for the Master Bedroom
Home Automation
  • Access control entry to the common entrance / foyers and gymnasium
  • Home security monitoring, gas leakage detectors, visitor tracking
  • Multi level security system for coomon areas and lobbies
Landscaping
  • Terrace gardens and well designed Landscape area
  • Interlock Pavers or Tiles to be laid in driveways and walkways
  • Water bodies and fountains shall be provided as per the architect’s design
Disclaimer
  • Artech Realtors PVT LTD, reserves the right to change / alter / delete the brands specified
    above, subject to its availability to an equivalent and competitive product

Amenities

Value Added Facilities

  • Air-conditioned Multi Purpose Hall for Association and other Activities
  • Air-conditioned Unisex Gym
  • Guest Suite
  • Indoor Games Room
  • Kids Play Area
  • Rooftop Party Area
  • Infinity Pool
  • Biometric Entry System
  • Video Door Phone
  • Driver’s Rest Room
  • Car Wash Facility
  • Intercom
  • AV Room
  • Reticulated LPG Supply
  • Gas Leakage Detector
  • Boom Barrier
  • Wifi Enabled Lobby
  • Efficient Waste Disposal & Management Systems

Progress

Work status as on 10-8-2017, we have completed the following.

  • Piling work – completed
  • Pile cap work – progressing
  • BF – column work – progressing
  • GF column work – progressing

Work status as on 9-6-2017, we have completed the following.

  • Pile cap work -progressing
  • BF – column work – progressing

Work status as on 10-5-2017, we have completed the following.

  • Piling work – completed
  • Pile cap work – progressing

Work status as on 8-3-2017, we have completed the following.

  • Piling work – completed
  • Pile cap work – progressing
  • BF – column work -progressing

As per the current work status from our site we are targeted to complete the following works by end of March, 2017.

Payment Schedule

Description / Stage of Construction%
On Signing the Agreement30%
On Completion of Piling works5%
On Completion of Pile Cap and Beams5%
On Completion of Ground Floor Roof Slab5%
On Completion of 2nd Floor Roof Slab5%
On Completion of 4th Floor Roof Slab5%
On Completion of 6th Floor Roof Slab5%
On Completion of 8th Floor Roof Slab5%
On Completion of 10th Floor Roof Slab5%
On Completion of 12th Floor Roof Slab5%
On Completion of 15th Floor Roof Slab5%
On Completion of Entire Structure5%
On Completion of Internal Plastering of respective apartment5%
On Completion of External Plastering5%
On Completion of Internal Painting2%
On Completion of Flooring of respective apartment2%
On Handling over of apartment1%
Total100%